| Location: | South Carolina |
|---|---|
| Posted: | Dec 18, 2024 |
| Due: | Jan 21, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H24-9661-LC-B |
| Publication URL: | To access bid details, please log in. |
This project is for renovations to the existing 135,851sq ft Sojouner Truth Hall. Truth Hall constructed in 1972 is a 14 story structure, which presently has 384 beds. The project will include a renovation of the structure to include fire suppression, fire alarm, roof, HVAC, paint, flooring, and code updates that may be required.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...19, 2026 - 2:00pm Project Location: Pendleton, SC Project Delivery Method: Design-Bid-Build... qualified ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026