REQUEST FOR BIDS
Electronic Bids for the construction of the WEIL AVENUE IMPROVEMENTS STP 4901 (652) will be VIRTUALLY
received by the CITY OF SHREWSBURY on FEBRUARY 3RD, 2026 at 11:00 A.M. Please submit bids in PDF
electronic file format. All bids shall be submitted by Email Transmittal; subject line to Include “WEIL AVENUE
IMPROVEMENTS STBG 4901(652) (Bid Submittal)”. Send bids to the City of Shrewsbury, at email address
kwands@shrewsburymo.gov . Copy submittal email to Weis Design Group, at email address:
wdg@weisdesigngroup.com. Email submittals received by the City of Shrewsbury after said time will not be
considered.
The proposed work includes the furnishing of all materials, tools, equipment and labor necessary for the construction of
approximately 2,430 SY of asphalt pavement removal and full-depth reconstruction, including approximately 282 TONS
of asphalt surface course, 844 TONS of asphalt base course, and approximately 1,683 LF of concrete curb and gutter, and
minor concrete street slab replacement in accordance with the plans and specifications and other items identified in the
contract documents. The contractor is responsible for all items of work necessary to complete the project.
Digital copies of the plans and specifications may be obtained, starting on DECEMBER 22ND, 2025 by emailing WEIS
DESIGN GROUP at wdg@weisdesigngroup.com
Each bid must be accompanied by a cashier’s check or certified check, or a Bid Bond executed by the BIDDER and an
approved surety company and payable to the CITY, in an amount not less than five percent (5%) of the sum total of the
base bid.
Not less than the prevailing hourly rates of wages that the higher of State or Federal Wage Rates shall prevail, or determined
by court on appeal, shall be paid to all workers performing work under this Contract.
The DBE goal for this letting is a minimum 0% of the total contract amount.
All BIDDERS must meet the MoDOT requirements as a CONTRACTOR prior to bid opening in accordance with the
Missouri Standard Specification Book for Highway Construction.
A Performance Bond and Payment and Materials Bond are required.
The City of Shrewsbury hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals
will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the
grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.
In accordance with the Davis-Bacon Act, and the Missouri Prevailing Wage Law, the Contractor will be required to
comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates
established by the United States Department of Labor and the Missouri Division of Labor Standards, respectively. The
highest rate between the two (Federal and State) for each job classification shall be considered the prevailing wage.
No bid may be withdrawn within thirty (30) days after the scheduled closing time for receipt of bids. The City must first
receive MoDOT approval before rejecting bids and awarding the contract. MoDOT will only concur with awarding the
contract to the "lowest, responsive, responsible bidder".
The bidder shall have examined and shall be familiar with the local conditions affecting the work, and the contract, contract
documents, including the Missouri Highways and Transportation Commission’s “Missouri Standard Specification for
Highway Construction, 2024" and most current supplement, and “Missouri Standard Plans for Highway Construction,
2024”.
Bidders are informed that pursuant to Section 285.530, RSMo, as a condition of the award of any contract in excess of five
thousand dollars ($5,000.00), the successful bidder shall, by sworn affidavit and provision of documentation, affirm its
enrollment and participation in a federal work authorization program with respect to the employees working in connection
to the contracted services. Successful bidders shall also sign an affidavit affirming that it does not knowingly employ any
person who is an unauthorized alien in connection to the contracted services (E-Verify).
Missouri law, 292.675 RSMo, requires the Contractor and its subcontractor(s) to provide a ten-hour occupational safety
and health administration (OSHA) construction safety program (or a similar program approved by the Missouri Department
of Labor and Industrial Relations as a qualified substitute) for their on-site employees (laborers, workmen, drivers,
equipment operators and craftsmen) who have not previously completed such a program and are directly engaged in actual
construction of the improvement (or working at a nearby or adjacent facility used for construction of the improvement).
The Contractor and its subcontractor(s) shall require all such employees to complete this ten-hour program, pursuant to
292.675 RSMo, unless they hold documentation on their prior completion of said program. Penalties for non-compliance
include Contractor forfeiture to the City of Shrewsbury in the amount of $2,500, plus $100 per contractor and
subcontractor employee for each calendar day such employee is employed beyond the elapsed time period for required