| Location: | California |
|---|---|
| Posted: | Sep 2, 2026 |
| Due: | Oct 6, 2026 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 942403.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | Acosta Operations Center (BP 08 - Framing, Drywall, Insulation, Pipe Grid, & Ceiling Tiles) (opens in new tab, PDF) |
| Project Number | 942403.01 |
| Project Description | Suffolk Construction Company., Inc. dba Suffolk-Roel, the CM at Risk Contractor on this UCLA project is currently seeking Bids from prequalified Framing, Drywall, Insulation, Pipe Grid, & Ceiling Tiles subcontractor bidders. Refer to the attached PDF Advertisement and follow the instructions therein. |
| Estimated Construction Cost | $480,221.00 |

With GovernmentContracts, you can:
...Project Name RRUMC 4th Floor Patient Care Reconfiguration (BP 12 - Tile & ...
UCLA Capital Programs
Bid Due: 11/30/2026
...for Proposal (RFP) Modified Bituminous Membrane Roofing Specification Clay Tile Roofing Specification Site ...
Glendale Unified School District
Bid Due: 11/18/2026
...and replace the floor return caps, 6-inch by 6-inch standard waterline tile, A-7250 ...
City of Dixon
Bid Due: 11/19/2026
..., handrails, elevators, and floors (terrazzo, tile concrete)....
State Government of California
Bid Due: 11/10/2026