2025 Drainage Maintenance Projects

Location: Texas
Posted: Sep 2, 2026
Due: Sep 30, 2026
Agency: City of Mansfield
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 2026-40-10-06
Publication URL: To access bid details, please log in.
Bid Number: 2026-40-10-06
Bid Title: 2025 Drainage Maintenance Projects
Category: Public Works
Status: Open
Publication Date/Time:
9/2/2026 8:00 AM
Closing Date/Time:
9/30/2026 2:00 PM
Contact Person:
Aimee Sullivan
aimee.sullivan@mansfieldtexas.gov
817-276-4223
Related Documents:

Attachment Preview

MANSFIELD 2025
DRAINAGE MAINTENANCE PROJECTS
CITY OF MANSFIELD
MAYOR:
MICHAEL EVANS
COUNCIL MEMBERS:
TAMERA BOUNDS
BRENT NEWSOM
JUAN FRESQUEZ
TODD SIMMONS
TODD TONORE
DR. JIM VASZAUSKAS
- COUNCIL MEMBER-PLACE 2
- COUNCIL MEMBER-PLACE 3
- COUNCIL MEMBER-PLACE 4
- COUNCIL MEMBER-PLACE 5
- COUNCIL MEMBER-PLACE 6
- COUNCIL MEMBER-PLACE 7
CITY MANAGER:
JOE SMOLINSKI
DIRECTOR OF ENGINEERING SERVICES:
RAYMOND COFFMAN
PROJECT NUMBER:
257003
COUNTRY CLUB DR
RAGLAND RD
PROJECT LOCATION
COUNTRY MEADOWS DRIVE
ELMER W OLIVER
NATURE PARK
PROJECT LOCATION
CANNON DRIVE
CANNON GATE DR
CANNON DRIVE
CANNON DRIVE
VICINITY MAP
N.T.S.
AUGUST 2026
PREPARED BY:
2000 E. Lamar Blvd, Suite 600, Arlington, Texas 76006
817.230.4777
TBPE No. 17261
www.westraconsultants.com
1
COVER SHEET
2
GENERAL NOTES
3
LEGEND AND ABBREVIATIONS
4
CANNON DRIVE TOPOGRAPHIC SURVEY
5
ROCKWOOD CHANNEL TOPOGRAPHIC SURVEY
6
CANNON DRIVE STORM DRAIN PLAN AND PROFILE
7
ROCKWOOD CHANNEL GRADING PLAN
8
ROCKWOOD CHANNEL DETAILED GRADING AND CROSS SECTIONS
9
ROCKWOOD CHANNEL SANITARY SEWER PLAN & PROFILE
10
CONSTRUCTION DETAILS
11
CONSTRUCTION DETAILS
12
CONSTRUCTION DETAILS
13
CONSTRUCTION DETAILS
NOTE:
THE CITY OF MANSFIELD STANDARD CONSTRUCTION DETAILS
DATED JANUARY 2024 ARE CONSIDERED PART OF THESE
CONSTRUCTION PLANS AND SHALL BE REFERENCED BY THE
CONTRACTOR FOR ALL WORK ON THIS PROJECT.
GENERAL NOTES
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
THE CITY OF MANSFIELD, NORTH CENTRAL TEXAS
COUNCIL OF GOVERNMENT (NCTCOG), AND TEXAS
DEPARTMENT OF TRANSPORTATION (TXDOT) IN THIS
ORDER, STANDARDS AND SPECIFICATIONS UNLESS
NOTED OTHERWISE.
2. CONTRACTOR SHALL NOTIFY CITY INSPECTOR FOR THIS
PROJECT AT LEAST FORTY-EIGHT (48) HOURS PRIOR TO
BEGINNING CONSTRUCTION.
3. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS
AND SIDEWALKS ADJACENT TO THE PROJECT FREE OF
MUD AND DEBRIS FROM THE CONSTRUCTION AT ALL
TIMES.
4. DISTURBED AREAS THAT ARE SEEDED SHALL BE CHECKED
PERIODICALLY TO SEE THAT GRASS COVERAGE IS
PROPERLY MAINTAINED. DISTURBED AREAS SHALL BE
WATERED, FERTILIZED, AND RESEEDED OR RESODDED,
UNTIL VEGETATION IS ESTABLISHED.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN
A NEAT AND ACCURATE RECORD OF CONSTRUCTION FOR
THE CITY'S RECORDS. AT THE CONCLUSION OF THE
PROJECT, THE CONTRACTOR SHALL PROVIDE THE CITY
FULL SIZE MARKUPS THAT RECORD ALL CONSTRUCTION
DEVIATING FROM THE PLANS.
6. CONTRACTOR SHALL NOT STORE MATERIALS,
EQUIPMENT OR OTHER CONSTRUCTION ITEMS ON
DRIVEWAYS, STREETS, SIDEWALKS, OR STORM DRAIN
FLOWLINES. CONTRACTOR SHALL NOT STORE
MATERIALS, EQUIPMENT OR OTHER CONSTRUCTION
ITEMS ON ADJACENT PROPERTIES OR RIGHT OF WAY
WITHOUT PRIOR WRITTEN CONSENT OF THE PROPERTY
OWNER OR THE CITY (FOR RIGHT OF WAY). ALL
CONSTRUCTION MATERIALS TO BE REMOVED SHALL BE
DISPOSED OF AT A LEGAL DISPOSAL LOCATION OFF SITE,
UNLESS WRITTEN APPROVAL IS OBTAINED FROM THE
PROPERTY OWNER AND THE CITY. THE CONTRACTOR
MAY DISPOSE OF CONCRETE AND ASPHALT AT THE CITY'S
STOCKPILE WITH PRIOR APPROVAL FROM THE CITY.
7. UNUSABLE EXCAVATED MATERIAL AND ALL WASTE
RESULTING FROM SITE CLEARING AND RUBBING SHALL
BE DISPOSED OF AT A LEGAL DISPOSAL FACILITY OFF SITE
BY THE CONTRACTOR AT HIS EXPENSE UNLESS
OTHERWISE SPECIFIED OR AGREED TO BY OWNER.
8. THE CONTRACTOR SHALL TAKE ALL AVAILABLE
PRECAUTIONS TO CONTROL DUST. CONTRACTOR SHALL
CONTROL DUST BY SPRINKLING WATER, OR AS
APPROVED BY THE CITY ENGINEER.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING
ANY IRON RODS OUTSIDE THE RIGHT OF WAY DURING
THE COURSE OF CONSTRUCTION. ANY IRON RODS
DISTURBED DURING CONSTRUCTION SHALL BE REPLACED
BY THE CONTRACTOR AT NO EXTRA PAY.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING
SURVEY MONUMENTS SHOWN ON PLANS. CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL REQUIRED
CONSTRUCTION SURVEYING.
11. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL
TIMES DURING CONSTRUCTION. THE DRAINAGE
INCLUDES SURFACE AND GROUND WATER. ANY
DRAINAGE DITCH OR STRUCTURE DISTURBED DURING
CONSTRUCTION SHALL BE RESTORED TO THE
SATISFACTION OF THE OWNING AUTHORITY.
12. ALL EFFORTS SHALL BE MADE TO AVOID DAMAGE TO
EXISTING TREES THAT ARE TO REMAIN. TREES SHALL BE
TRIMMED AND PAINTED ONLY IF NECESSARY FOR THE
SAFE MANEUVERING OF CONSTRUCTION EQUIPMENT.
THE CONTRACTOR SHALL NOT SNAG OR TEAR TREE
ROOTS. PRUNING OF TREES AND SHRUBS SHALL BE
PERFORMED BY A CERTIFIED ARBORIST.
13. ALL ADJACENT PROPERTY DAMAGED BY THE PROPOSED
CONSTRUCTION SHALL BE RESTORED TO EQUAL OR
BETTER CONDITION THAN WHICH IT WAS FOUND BEFORE
SUCH WORK WAS UNDERTAKEN (NON-PAY ITEM).
14. THE CONTRACTOR SHALL ARRANGE HIS WORK SO THAT
NO MACHINERY OR EQUIPMENT SHALL BE CLOSER THAN
30 FEET TO ANY TRAVEL LANES AFTER SUNSET EXCEPT AS
AUTHORIZED BY THE OWNER.
15. CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN
VICINITY OF ANY OVERHEAD ELECTRIC LINES.
CONTRACTOR SHALL ABIDE BY NATIONAL ELECTRIC CODE
AND ANY REQUIREMENT BY OWNER OF ELECTRIC LINE.
16. ALL REMOVALS SHOWN AS PART OF THESE PLANS SHALL
BE REMOVED PER BID ITEM GENERAL SITE PREPARATION.
17. CONTRACTOR TO RESTORE ALL DISTURBED AREAS
INCLUDING LANDSCAPING AND IRRIGATION.
18. CONTRACTOR TO VERIFY THE CONSTRUCTION STAGING
AREA WITH THE CITY PRIOR TO THE START OF
CONSTRUCTION.
PAVING NOTES
19. THE CONTRACTOR IS RESPONSIBLE FOR ASSURING THAT
ALL WORK MEETS OR EXCEEDS THE AMERICANS WITH
DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG)
AND THE TEXAS ACCESSIBILITY STANDARDS (TAS). THE
CONTRACTOR SHALL REMOVE AND REPLACE ALL ITEMS
NOT MEETING ADAAG AND TAS REQUIREMENTS. (NO
SEPARATE PAY ITEM). REFERENCE CITY AND TXDOT
STANDARD DETAILS FOR RAMPS.
20. ALL REINFORCING STEEL AND DOWEL BARS IN
PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT
THE CORRECT CLEARANCES BY THE USE OF BAR CHAIRS
OR OTHER APPROVED SUPPORT.
21. THE USE OF WOOD FORMS FOR PAVEMENT
CONSTRUCTION WILL BE PERMITTED.
22. CONTRACTION JOINTS SHALL BE SAWED IN THE
PAVEMENT ON THIS PROJECT. CONTRACTION JOINTS
SHALL BE SPACED A MAXIMUM OF 15 FEET ON CENTER.
ALL CONTRACTION JOINTS SHALL BE SAWED NO LATER
THAN 12 HOURS AFTER PLACEMENT OF THE PAVEMENT,
OR AS DIRECTED BY THE CITY, HOWEVER, CONTRACTOR
MUST COMPLY WITH NOISE ORDINANCE. SEE PAVING
DETAILS FOR ADDITIONAL INFORMATION.
23. ALL PAVING DIMENSIONS ARE TO EDGE OF PAVEMENT
AND/OR BACK OF CURB UNLESS OTHERWISE NOTED.
24. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
PERFORMING ALL CONSTRUCTION LAYOUTS FROM THE
SITE LAYOUT CONTROL POINTS AND FROM THE
DIMENSIONS AND CENTERLINES SHOWN. THE
CONTRACTOR MUST NOTIFY THE ENGINEER OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
25. THE CONTRACTOR SHALL COORDINATE SIDEWALK
LOCATIONS WITH ALL EXISTING SIDEWALKS AND ALL
UTILITIES EXISTING AND PROPOSED. ADJUSTMENTS TO
THE PROPOSED SIDEWALK SHALL IN NO WAY RELIEVE
THE CONTRACTOR OF HIS RESPONSIBILITY TO ENSURE
THAT ALL SIDEWALK MEET OR EXCEED THE MINIMUM
ADAAG AND TAS STANDARDS.
26. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO SUPPLY THE CITY AND THE ENGINEER WITH
CONCRETE MIX DESIGN AT THE PRE-CONSTRUCTION
MEETING. THE COST OF THIS DESIGN SHALL BE INCLUDED
IN THE UNIT PRICE OF PAVEMENT MATERIAL.
27. WHERE APPLICABLE, THE CONTRACTOR SHALL PROTECT
NEW AND EXISTING PAVEMENT BY PLACING MATS OR
EARTH ON THE PAVEMENT TO PROTECT IT FROM TRACK
MARKS AND/OR CRACKING DURING CONSTRUCTION
(NON-PAY ITEM).
28. PRIOR TO FINAL ACCEPTANCE CONTRACTOR SHALL
REMOVE ALL SILT, DIRT, DEBRIS, ETC FROM INLETS,
STORM DRAINS, CULVERTS, MANHOLES, AND STREET
GUTTERS.
EROSION CONTROL NOTES
29. EROSION CONTROL DEVICES SHALL BE INSTALLED PRIOR
TO ANY SOIL DISTURBING ACTIVITIES AT THE PROJECT
SITE.
30. CONTRACTOR SHALL INSTALL STABILIZED ENTRY/EXITS
AND CONCRETE WASHOUT AREAS. CONTRACTOR SHALL
VERIFY LOCATIONS WITH THE CITY PRIOR TO
INSTALLATION.
31. EROSION CONTROL DEVICES SHALL BE INSPECTED
WEEKLY AND AFTER MAJOR RAIN EVENTS TO ENSURE
THAT THEY ARE FUNCTIONING PROPERLY.
32. SEDIMENT SHALL BE REMOVED FROM EROSION
CONTROL DEVICES WHEN THE DESIGN CAPACITY HAS
BEEN REDUCED BY ONE-THIRD. EROSION CONTROL
DEVICES THAT UTILIZE STONE SHALL HAVE THE STONE
REPLACED WHEN THE VOIDS SPACES IN THE ROCK
BECOME CLOGGED WITH SEDIMENT.
33. IF AN EROSION CONTROL DEVICE IS NOT FUNCTIONING
PROPERLY TO ELIMINATE EROSION OR OFF-SITE
SEDIMENTATION, THEN THE DEVICE MUST BE REPLACED
OR MODIFIED. IN ADDITION, THE STORM WATER
POLLUTION PLAN SHALL BE REVISED TO INDICATE THE
CHANGE.
34. STABILIZATION MEASURES SHALL BE INITIATED AS SOON
AS PRACTICABLE IN PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR
PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14
DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT
PORTION OF THE SITE HAS TEMPORARILY OR
PERMANENTLY CEASED.
35. IF THE TOTAL DISTURBED AREA FOR THIS PROJECT IS
GREATER THAN ONE (1.0) ACRE OR GREATER, THE
CONTRACTOR SHALL PREPARE, IMPLEMENT, AND
MAINTAIN A STORMWATER POLLUTION PREVENTION
PLAN (SWPPP) IN ACCORDANCE WITH THE APPLICABLE
TCEQ REQUIREMENTS AND OBTAIN ALL REQUIRED
PERMITS PRIOR TO THE START OF CONSTRUCTION.\
TOTAL DISTURBED ACREAGE FOR THIS PROJECT IS ±0.53
ACRES
UTILITY NOTES
36. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING
ALL UTILITIES, WHETHER PUBLIC OR PRIVATE, PRIOR TO
EXCAVATION OR PRIOR TO CONSTRUCTION. THE
INFORMATION AND DATA SHOWN WITH RESPECT TO
EXISTING UNDERGROUND FACILITIES AT OR
CONTIGUOUS TO THE SITE IS APPROXIMATE AND BASED
ON PHYSICAL APPURTENANCES OBSERVED IN THE FIELD.
THE OWNER AND ENGINEER SHALL NOT BE RESPONSIBLE
FOR THE ACCURACY OR THE COMPLETENESS OF ANY
SUCH INFORMATION AND DATA; AND, THE CONTRACTOR
SHALL HAVE FULL RESPONSIBILITY FOR REVIEWING AND
CHECKING ALL SUCH INFORMATION AND DATA, FOR
LOCATING ALL UNDERGROUND FACILITIES, FOR
COORDINATION OF THE WORK WITH THE OWNERS OF
SUCH UNDERGROUND FACILITIES DURING
CONSTRUCTION, FOR THE SAFETY AND PROTECTION
THEREOF, AND FOR REPAIRING ANY DAMAGE THERETO
RESULTING FROM THE WORK. THE COST OF ALL OF
WHICH WILL BE CONSIDERED AS HAVING BEEN INCLUDED
IN THE CONTRACT PRICE. THE CONTRACTOR SHALL
NOTIFY ANY AFFECTED UTILITY COMPANIES OR
AGENCIES IN WRITING AT LEAST 72 HOURS PRIOR TO
BEGINNING CONSTRUCTION.
a. CITY OF MANSFIELD PROJECT MANAGER -
AIMEE SULLIVAN, P.E. 817-276-4223
b. ZAYO - RUSSELL LYTLE
817-538-8532
c. AT&T - GARY TILROY
817-995-7608
d. ONCOR - CHRISTOPHER COOLEY
682-375-4693
e. ATMOS
888-286-6700
36. THE CONTRACTOR SHALL CONTACT UTILITY
DEPARTMENT AND COORDINATE WITH MANSFIELD
INSPECTOR A MINIMUM OF 48 HOURS PRIOR TO
CUTTING OR CONNECTING TO EXISTING UTILITY LINES.
MANSFIELD INSPECTOR SHALL DETERMINE THE MOST
APPROPRIATE TIME FOR THESE ACTIVITIES TO TAKE
PLACE.
37. CONTRACTOR SHALL FIELD LOCATE EXISTING UTILITY
LINES TO BE CONNECTED TO PRIOR TO COMMENCING
WORK. IF A DISCREPANCY EXISTS BETWEEN THE PLANS
AND ACTUAL FIELD CONDITIONS THE CONTRACTOR
SHALL NOTIFY THE ENGINEER IMMEDIATELY.
38. CONTRACTOR SHALL VERIFY THE ELEVATION,
CONFIGURATION AND ANGULATIONS OF EXISTING LINES
PRIOR TO CONSTRUCTION. THIS ITEM SHALL BE
CONSIDERED AS A SUBSIDIARY COST TO THE PROJECT
AND NO ADDITIONAL COMPENSATION SHALL BE
ALLOWED.
39. CONTRACTOR SHALL IMMEDIATELY NOTIFY CITY
INSPECTOR OF ANY DAMAGE OR CHANGED CONDITION
CAUSED BY CONSTRUCTION ACTIVITIES THAT MAY
RESULT IN COMPROMISED WATER QUALITY ENTERING
THE DISTRIBUTION SYSTEM.
40. THE CONTRACTOR SHALL DISTRIBUTE LETTERS TO ALL
AFFECTED PROPERTY OWNERS PRIOR TO BEGINNING
WORK ON EACH PROPERTY. THIS LETTER SHALL INCLUDE
NAMES AND TELEPHONE NUMBERS OF CONTRACTOR
CONTACTS, A DESCRIPTION OF WORK TO BE DONE, AND
THE TIME FRAME FOR DOING THE WORK. COPIES OF THE
LETTER SHALL BE FORWARDED TO THE CITY INSPECTOR.
THE CONTRACTOR SHALL NOTIFY RESIDENTS 48 HOURS
IN ADVANCE OF PERFORMING ANY WORK ON PRIVATE
PROPERTY. DISTRIBUTION OF LETTERS SHALL BE
CONSIDERED SUBSIDIARY TO THE PROJECT COST AND NO
ADDITIONAL COMPENSATION SHALL BE ALLOWED.
STRUCTURAL NOTES
41. IF TEMPORARY SHORING IS NECESSARY TO CONSTRUCT
THE RETAINING WALLS, THE CONTRACTOR SHALL
SUBMIT A SHORING DESIGN FOR REVIEW PRIOR TO
CONSTRUCTION. TEMPORARY SHORING DESIGN SHALL BE
SIGNED AND SEALED BY A PROFESSIONAL ENGINEER
REGISTERED IN THE STATE OF TEXAS.
42. CONTRACTOR IS RESPONSIBLE FOR DEWATERING THE
AREA TO ENSURE PROPER CONSTRUCTION OF ALL
STRUCTURE. ALL IMPROVEMENTS SHOWN BELOW THE
WATER SURFACE SHALL BE DEWATERED AND INSTALLED
IN THE DRY.
43. ALL EXCAVATION, DRAINAGE, BACKFILL, COMPACTION
AND DRILLED SHAFT CONSTRUCTION SHALL BE AS
SHOWN ON THE PLANS AND PERFORMED IN
ACCORDANCE WITH GEOTECHNICAL REPORT NO.
103-22-448 PREPARED BY CMJ ENGINEERING DATED
OCTOBER 6, 2022.
44. ALL CONCRETE SHALL BE DESIGNED, MIXED,
TRANSPORTED, AND PLACED IN ACCORDANCE WITH
TEXAS DEPARTMENT OF TRANSPORTATION (TXDOT) ITEM
421, HYDRAULIC CEMENT CONCRETE, UNLESS NOTED
OTHERWISE. CONTRACTOR SHALL SUBMIT ALL MIX
DESIGNS FOR APPROVAL PRIOR TO CONSTRUCTION.
CONCRETE FOR STRUCTURES SHALL BE CLASS C AND
HAVE A MINIMUM 28-DAY COMPRESSION STRENGTH OF
3,600 PSI, UNLESS NOTED OTHERWISE.
45. ALL EXPOSED EDGES SHALL BE CHAMFERED 3/4" UNLESS
NOTED OTHERWISE.
46. ALL REINFORCING STEEL SHALL BE ASTM A-615 GRADE 60
IN ACCORDANCE WITH TXDOT ITEM 440, REINFORCING
STEEL. CONTRACTOR SHALL SUBMIT CERTIFICATION FOR
REINFORCING STEEL. REINFORCING PLACEMENT SHALL
BE IN ACCORDANCE WITH ACI-318.
47. ALL CLEAR COVER FOR REINFORCING SHALL BE 2" WHERE
FORMED AND 3" WHERE CAST AGAINST EARTH. UNLESS
OTHERWISE NOTED. ALL REINFORCING DIMENSIONS ARE
TO OUTSIDE OF BAR UNLESS OTHERWISE NOTED.
48. DRILLED SHAFTS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH TXDOT ITEM 416, DRILLED SHAFT
FOUNDATIONS.
49. CONTRACTOR SHALL UTILIZE MECHANICAL COUPLERS OR
CLASS B LAP SPLICE IF REQUIRED FOR GRADE BEAM
REINFORCING. CONTRACTOR SHALL SUBMIT
MECHANICAL COUPLER PRODUCT DATA FOR APPROVAL.
50. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS IF
ALTERNATIVE PHASING PLANS ARE PREFERRED.
51. CONTRACTOR SHALL SUBMIT DRAINAGE MATERIAL
PRIOR TO CONSTRUCTION.
52. JOINT SEALANTS AND FILLERS SHALL BE IN ACCORDANCE
WITH TXDOT ITEM 433, JOINT SEALANTS AND FILLERS.
53. ALL GABION MATTRESS WIRE SHALL BE HOT-DIPPED
GALVANIZED AND PVC COATED.
DEMOLITION NOTES
54. REMOVE THE EXISTING STRUCTURE TO THE LINES AND
DIMENSIONS SHOWN AND IN ACCORDANCE WITH
TXDOT ITEM 496, REMOVING STRUCTURES. 55. PRESERVE
AND CLEAN (AND REPAIR EPOXY COATING) ALL
REINFORCING STEEL TO REMAIN IN PLACE AFTER
DEMOLITION.
56. THE CONTRACTOR SHALL SAW CUT THE LIMITS OF
REMOVAL AND BREAK OUT THE CONCRETE FULL DEPTH.
THE DEPTH OF THE SAW CUT SHALL NOT EXTEND TO THE
EXISTING REINFORCING.
57. THE CONTRACTOR SHALL DEVELOP AND PREPARE A
DEMOLITION PLAN IN ACCORDANCE WITH TXDOT ITEM
496, REMOVING STRUCTURES. THE DEMOLITION PLAN
SHALL BE PREPARED IN ACCORDANCE WITH THE
MENTIONED SPECIFICATION AND SHALL ALSO CONTAIN
THE METHOD FOR PROTECTING THE EXISTING CREEK
FROM DEBRIS AND SLURRY, METHOD FOR PROTECTING
THE EXISTING STRUCTURE TO REMAIN, METHOD FOR
PROTECTING THE EXISTING STEEL REINFORCEMENT TO
REMAIN, AND METHOD TO PROTECT THE TRAVELING
PUBLIC FROM DEBRIS.
TRAFFIC CONTROL NOTES
58. CONTRACTOR SHALL WORK TO ENSURE THAT CITY
ROADWAYS REMAIN OPEN AS MUCH AS POSSIBLE
DURING CONSTRUCTION. WHEN POSSIBLE, TRAFFIC
CONTROL MEASURES SHALL BE DESIGNED TO BE
REMOVED WHEN WORK IS NOT BEING PERFORMED.
59. THE CONTRACTOR SHALL SUBMIT IN WRITING A
SEQUENCE OF WORK SCHEDULE AND TRAFFIC CONTROL
PLAN TO THE ENGINEER. ROAD CLOSURES SHALL BE
SUBMITTED A MINIMUM OF 2 WEEKS PRIOR TO
COMMENCING WORK IN COMPLIANCE WITH THE CITY'S
STREET CLOSURE POLICY.
60. ALL PHASES OF CONSTRUCTION MUST BE COORDINATED
WITH THE ENGINEER. FIELD ADJUSTMENTS MAY BE
NECESSARY AND WILL BE CARRIED OUT AS DIRECTED BY
THE ENGINEER AT NO EXTRA PAY.
61. CONTRACTOR SHALL DEVELOP A TRAFFIC CONTROL PLAN
(TCP) FOR ANY WORK IN THE PUBLIC RIGHT-OF-WAY
PRIOR TO BEGINNING CONSTRUCTION. THE TCP SHALL BE
SUBMITTED TO THE ENGINEER AND APPROVED A
MINIMUM OF 48 HOURS PRIOR TO ANY
IMPLEMENTATION.
62. IF THE CONTRACTOR DAMAGES EXISTING SIGNAGE, HE
SHALL PAY THE CITY OF MANSFIELD FOR THE VALUE OF
THE REPLACEMENT SIGN AND INSTALLATION.
63. PEAK TRAFFIC PERIODS SHALL BE DEFINED AS THE TIME
BETWEEN 6:30AM AND 8:30AM AND BETWEEN 4:00PM
AND 6:30 PM MONDAY THROUGH FRIDAY, ALL OTHER
TIMES SHALL BE CONSIDERED OFF-PEAK.
64. CONTRACTOR TO INCLUDE A PEDESTRIAN DETOUR
ROUTE TO BE APPROVED BY THE CITY PRIOR TO
INSTALLATION.
PAVEMENT MARKING NOTES
65. REMOVAL OF EXISTING AND TEMPORARY PAVEMENT
MARKINGS IS SUBSIDIARY TO ALL PAVEMENT MARKING
BID ITEMS.
66. THE CONTRACTOR SHALL PROVIDE PROPER PAVEMENT
MARKINGS IN ACCORDANCE WITH THE CITY
SPECIFICATIONS AND DETAIL SHEETS INCLUDED IN THESE
PLANS. ALL THERMOPLASTIC PAVEMENT MARKINGS
SHALL BE INSTALLED USING APPROVED THERMOPLASTIC
MATERIAL. CONTACT THE CITY ENGINEERING
DEPARTMENT FOR FURTHER INFORMATION
2000 E. Lamar Blvd, Suite 600
Arlington, Texas 76006
817.230.4777
TBPE No. 17261
www.westraconsultants.com
NO. REVISION NOTE
BY
DATE CLIENT NO:
DATE: 08 / 27 / 2026
CITY OF MANSFIELD
MANSFIELD 2025
DRAINAGE MAINTENANCE PROJECTS
SHEET:
2
of
13
GENERAL NOTES
WESTRA NO:
MAN25008
EXISTING LEGEND
SANITARY SEWER
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
STORM DRAIN
STORM DRAIN MANHOLE
CURB INLET
WATER MAIN
WATER GATE VALVE
FIRE HYDRANT
WATER METER
IRRIGATION CONTROL VALVE
ELECTRIC - OVERHEAD
ELECTRIC - UNDERGROUND
UTILITY POLE
UTILITY POLE GUY
LIGHT POLE
TRAFFIC SIGNAL CABLE (UNDERGROUND)
COMMUNICATIONS - CABLE TV
COMMUNICATIONS - FIBER OPTIC
COMMUNICATIONS - TELEPHONE
COMMUNICATIONS - TELEPHONE RISER
COMMUNICATIONS - ELECTRIC RISER
UNDERGROUND TELEPHONE RISER
ELECTRIC OR COMMUNICATIONS BOX
UNDERGROUND FIBER MARKER
GAS MAIN
GAS METER
GAS MARKER
GAS VALVE
EDGE OF ASPHALT PAVEMENT
CHAIN LINK FENCE
WIRE FENCE
DECORATIVE FENCE
WOOD & PILASTER FENCE
MAIL BOX
SIGN
PROPERTY LINE
EASEMENT LINE
CITY LIMIT
FEMA FLOODPLAIN
FEMA FLOODWAY
IRON ROD OR PROP. COR. FOUND
TREE
TREELINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
BENCHMARK
CONTROL POINT
PROPOSED LEGEND
GRADING PLAN LEGEND
(29.78)
29.78
MATCH EXISTING GROUND
PROPOSED SPOT ELEVATION
1.7%
PROPOSED WALL
XX.XX T/W
XX.XX B/W
FINISHED GROUND
ELEV @ TOP
FINISHED GROUND
ELEV @ BOTTOM
PROPOSED SLOPE
GRADE BREAK / RIDGE LINE
PROPOSED SWALE LINE
DAYLIGHT LINE/LIMIT OF GRADING
600
PROPOSED CONTOUR
STORM PLAN LEGEND
XX" SD
PROPOSED STORM DRAIN
PROPOSED GRATE INLET
PROPOSED SAFETY END
ABBREVIATIONS
AC ASBESTOS CEMENT
FLG FLANGE
PE POLYETHYLENE PIPE
ARV AIR RELEASE VALVE
FO FIBER OPTIC
PI POINT OF INTERSECTION
ASTM AMERICAN SOCIETY FOR FOC
TESTING AND MATERIALS
AWWA AMERICAN WATER WORKS FT
ASSOCIATION
G
FIBER OPTIC
COMPONENTS
FOOT OR FEET
GAS LINE
PL PROPERTY LINE
PP POWER POLE
PRC POINT OF REVERSE
CURVATURE
BC BACK OF CURB
GM GAS METER
PROP PROPOSED
BFV BUTTERFLY VALVE
GPM GALLONS PER MINUTE
BLDG BUILDING
GV GATE VALVE
BIT BITUMINOUS CONCRETE
BM BENCHMARK
BO BLOW OFF
BW BOTTOM OF WALL
C&G CURB & GUTTER
CAP CAPACITY
C-C CENTER TO CENTER
C.F. CUBIC FEET
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IN PLACE
HDPE HIGH DENSITY
POLYETHYLENE
HGL HYDRAULIC GRADE LINE
HMAC HOT MIX ASPHALT
CEMENT
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HYD HYDRANT
ICV IRRIGATOIN CONTROL
VALVE
ID INNER DIAMETER
C/L CENTERLINE
IN INCH, INCHES
CL CLASS OF PIPE
INV INVERT
CMP CORRUGATED METAL PIPE IP IRON PIN/PIPE
CMU CONCRETE MASONRY UNIT IPF
CO CLEANOUT
IPS
CONC CONCRETE
IRF
CP CONTROL POINT
LB
CTB CEMENT TREATED BASE LF
CU COPPER
LP
C.Y. CUBIC YARD
LT
D DEPTH
MAX
DI DUCTILE IRON
MB
DIA DIAMETER
MEP
DMH DRAIN MANHOLE
IRON PIN/PIPE FOUND
IRON PIN/PIPE SET
IRON ROD FOUND
POUND
LINEAR FOOT
LIGHT POLE
LEFT
MAXIMUM
MAILBOX
MECHANICAL ELECTRICAL
PLUMBING
DIM DIMENSION
MH MANHOLE
DR DIMENSION RATIO
MIN. MINUTE
EJ EXPANSION JOINT
MIN MINIMUM
ELEV ELEVATION
MJ MECHANICAL JOINT
ESMT EASEMENT
NO. NUMBER
EX EXISTING
N.T.S. NOT TO SCALE
EXIST EXISTING
OC ON CENTER
FEMA FEDERAL EMERGENCY
MANAGEMENT AGENCY
FF FINISHED FLOOR
FH FIRE HYDRANT
F/L FLOWLINE
OD OUTER DIAMETER
OHE OVERHEAD ELECTRIC
PC POINT OF CURVE
PCC POINT OF COMPOUND
CURVE
PSI POUNDS PER SQUARE
INCH
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE PIPE
R
RADIUS
RCP REINFORCED CONCRETE
PIPE
RCCP REINFORCED CONCRETE
CYLINDER PIPE
REF REFERENCE
ROW RIGHT OF WAY
RT RIGHT
RW RETAINING WALL
SD STORM DRAIN
SDMH STORM DRAIN MAINHOLE
SDR STANDARD DIMENSION
RATIO
S.F. SQUARE FEET
S.S. SANITARY SEWER
SSMH SANITARY SEWER
MANHOLE
STA STATION
STD STANDARD
STL STEEL
S.Y. SQUARE YARD
TBM TEMPORARY BENCHMARK
TC TOP OF CURB
TEMP TEMPORARY
TP TELEPHONE POLE
TW TOP OF WALL
TXDOT TEXAS DEPARTMENT OF
TRANSPORTATION
TYP TYPICAL
UGE UNDERGROUND ELECTRIC
V.C. VERTICAL CURVE
VC VITRIFIED CLAY
VER VERTICAL
WM WATER METER
WL WATER LINE
WSEL WATER SURFACE
ELEVATION
2000 E. Lamar Blvd, Suite 600
Arlington, Texas 76006
817.230.4777
TBPE No. 17261
www.westraconsultants.com
NO. REVISION NOTE
BY
DATE CLIENT NO:
DATE: 08 / 27 / 2026
CITY OF MANSFIELD
MANSFIELD 2025
DRAINAGE MAINTENANCE PROJECTS
SHEET:
3
of
13
LEGEND AND ABBREVIATIONS
WESTRA NO:
MAN25008
13
13
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...(Neighborhood 5B & Oakland Drainage) Issue Date & Time 10/9/2026 05:00:01 PM (CT) ...

City of Denton

Bid Due: 11/12/2026

...Bid Number: 2027-01 Bid Title: Phase IV Drainage Improvements Setting Suns Category: Engineering.... ...

City of Sherman

Bid Due: 10/23/2026

...Bid Number: 2027-01 Bid Title: Phase IV Drainage Improvements Setting Suns Category: Engineering.... ...

City of Sherman

Bid Due: 10/23/2026

...Bid Number: P26-060 Bid Title: ENGINEERING SERVICE FOR STREET & DRAINAGE PROJECTS Category... ...

City of Port Arthur

Bid Due: 10/28/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.