| Location: | Georgia |
|---|---|
| Posted: | May 26, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...PNA 484-072426 Steel Fabrication Inspection and Testing Services Transportation-2, Department Of May... 21, ...
State Government of Georgia
Bid Due: 6/23/2026
...from qualified contractors for the design, engineering, fabrication, delivery, and erection of a ...
State Government of Georgia
Bid Due: 6/04/2026
...of the existing drainage structure and fabrication/construction/installation of a new drainage structure...
State Government of Georgia
Bid Due: 6/25/2026
...to fabrication and delivery. NIGP Codes Code Description 07314 Trailers, Specialty, Enclosed, Tag-Along ...
State Government of Georgia
Bid Due: 6/04/2026