| Location: | Georgia |
|---|---|
| Posted: | May 26, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
..., installation of auxiliary equipment such as a permanent bypass pump and electrical ...
Chatham County
Bid Due: 8/11/2026
...pump and electrical and SCADA work associated with such. NIGP Codes Code Description ...
State Government of Georgia
Bid Due: 8/11/2026
..., and the calibration of all SCADA equipment to properly operate the supply ...
Still Waters Consulting Engineering
Bid Due: 8/13/2026
..., and the calibration of all SCADA equipment to properly operate the supply ...
State Government of Georgia
Bid Due: 8/13/2026