| Location: | Georgia |
|---|---|
| Posted: | May 26, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...assembly, and to transfer empty cases from the unload drive assembly into conveyor ...
DEPT OF DEFENSE
Bid Due: 8/10/2026
...from the unload drive assembly into conveyor elements in the return chute. Gear-driven ...
DEPT OF DEFENSE
Bid Due: 8/10/2026
...concrete structure, compactor conveyor system, two flow control slide gates, 94 linear feet ...
State Government of Georgia
Bid Due: 7/31/2026