| Location: | Georgia |
|---|---|
| Posted: | May 26, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...Fueling Systems, Including Parts and Accessories 72020 Control Devices: Motor Fuel Dispensing, Security..., ...
State Government of Georgia
Bid Due: 8/11/2026
...DDC controls system and modifying gas piping and electrical connections to support the ...
State Government of Georgia
Bid Due: 8/06/2026
...and controls, electrical upgrades to support the new HVAC system, misc. ceiling work, ...
Rockdale County School District
Bid Due: 8/06/2026
...Protection; Electrolysis Engineering 92522 Control Systems Engineering 92523 Dam Engineering 92524... Protection and ...
State Government of Georgia
Bid Due: 7/23/2026