| Location: | Georgia |
|---|---|
| Posted: | May 26, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...and lighting control system utilizing existing electrical circuits Configuration of multiple... - College ...
State Government of Georgia
Bid Due: 6/03/2026
...Conservation Unit requires contractor assistance to replace the Wadsworth greenhouse control systems... Follow ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/11/2026
...new pumps at 3 hp each; instrumentation, control and alarm systems; and related ...
State Government of Georgia
Bid Due: 6/05/2026
...the procurement intended to support the Foxboro Distributed Control System parts, equipment, repairs..., ...
State Government of Georgia