| Location: | Georgia |
|---|---|
| Posted: | May 26, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...switchgear, VFDs, control panel and associated conduit and wiring, remove electrical equipment pads... ...
State Government of Georgia
Bid Due: 8/19/2026
...connection, concrete, soil erosion and sediment control, construction exit, electrical, mechanical... installation, valve ...
City of Covington
Bid Due: 7/30/2026
...DDC controls system and modifying gas piping and electrical connections to support the ...
State Government of Georgia
Bid Due: 8/06/2026
...transformer, remove electrical switchgear, VFDs, control panel and associated conduit and wiring..., remove ...
City of Duluth
Bid Due: 8/19/2026