| Location: | Georgia |
|---|---|
| Posted: | May 26, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...FWLB LAS Sludge Removal 2026 Fitzgerald Utilities Sep 04, 2026 @ 04:48 PM ...
State Government of Georgia
Bid Due: 10/08/2026
...Books and Strip Books 72064 Sewage and Sludge Pumps, Submersible 72067 Sewage and ...
State Government of Georgia
Bid Due: 10/02/2026
...91345 Construction, Sewer and Storm Drain 96873 Storm Drain Cleaning, Repair, and Sludge ...
State Government of Georgia
Bid Due: 10/15/2026
.... 88576 Odor Control Chemicals, etc. 88544 Corrosion, Scale, and Sludge Control Chemicals: ...
State Government of Georgia
Bid Due: 10/30/2026