INVITATION TO BID
SEALED BIDS for construction of City of Billings Sidewalks Improvements, Phase 1, TAP-9901(845), Billings,
Missouri will be received by the City of Billings, 202 NE Hwy 60, Billings, Missouri 65610 until 1:30 p.m..
prevailing local time, March 18, 2026, and then publicly opened and read aloud at the City of Billings, 202 NE
Hwy 60, Billings, Missouri 65610.
The proposed work includes: Construction of ADA compliant sidewalks and removal of existing improvements
Complete digital project bidding documents are available at www.weareown.com You may download the digital
plan documents for a non-refundable fee of $55.00. The Quest project number is 10069270.
Paper copies of bidding documents may be obtained from the office of OWN, Inc., 218 5th Street, Monett, Missouri
65708, (417) 236-0112 upon payment of a non-refundable amount of $175.00. The successful bidder will be
furnished three complete sets of plans and specifications. Additional sets will be sold to the contractor at cost.
Bidders with questions concerning this invitation may contact Sean Matlock, P.E., OWN, Inc., 2215 Fairlawn
Drive, Carthage, Missouri 64836, at (417) 358-9551.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly
rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial
Relations (Federal Wage Rate), or state wage rate, whichever is higher.
The City of Billings hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged
individuals will be afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in
consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard
Specifications for Highway Construction including all revisions. The contractor questionnaire must be on file 7
days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works projects provide a 10-Hour OSHA
construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to
be completed by their on-site employees within sixty (60) days of beginning work on the construction project.
The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive
any informalities or minor defects or to reject any or all bids and to re-advertise and to rebid. All materials for the
project shall be tax exempt.
Each Bidder must deposit with his/her bid, security in the amount of five percent (5%) of his/her base bid which is
subject to conditions provided in the Instructions to Bidders.
The DBE Goal for this project is 0%.
No 2nd tier subcontracting will be allowed on this project.
No Bidder may withdraw his bid within thirty (30) consecutive calendar days after the actual date of the opening
thereof.