| Location: | Ohio |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Apr 5, 2026 |
| Agency: | Youngstown Metropolitan Housing Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 60A25 |
| Publication URL: | To access bid details, please log in. |
| Solicitation | Type | Issue Date | Pre Bid Conference | Description | Close | Bid Addenda |
| 60A25 | TC | 3/10/2026 9:00AM EST | Victory Estates Bathroom Rehab |
4/5/2026
3:00pm EST |
Contract 26-001 |
SPECIFICATIONS
FOR
VICTORY ESTATES
BATHROOM REHABILITATION
690 Magnolia Avenue
Youngstown, Ohio 44505
TC PROJECT NO.: 60A25
DATE: March 10, 2026
BID SOLICITATION
Victory Estates Bathroom Rehabilitation
Contract 26-001
Youngstown Metropolitan Housing Authority invites you to submit a sealed bid proposal for Victory Estates Bathroom
Rehabilitation. Site address is 690 Magnolia Ave. Youngstown, OH 44505. PROJECT IS SALES TAX EXEMPT.
Bids shall be delivered to YMHA and include the following noted on the envelope "Sealed Bid 26-001 Victory Estates
Bathroom Rehabilitation". YMHA will accept proposals at YMHA, Attn: David Martino, 131 W. Boardman St., Youngstown,
OH 44503 until 3:00 p.m. local time on Thursday, April 2, 2026, at which time all proposals shall be publicly tabulated. Late
proposals will be rejected. All bids must be made on the bid form provided and include the following:
A) Contractor Information Form
B) HUD 5369-A
C) Non-Collusion Affidavit
D) Completed Original Bid Form
E) Completed BABA Bid Form
F) 10% Bid Bond for the Bid Form which produces the higher sum.
G) Statement of Qualifications supporting similar work, including references. On contractor letterhead.
H) HUD 2530
Except as noted, all above forms are included in your specification book.
All bidders shall be aware that the successful bidder will be required to complete all necessary forms to meet YMHA and HUD
requirements. Contractor will be required to submit necessary paperwork and certifications including, but not limited to, contract,
notice to proceed, contractor profile form, W-9, etc. The successful bidder will be required to provide proof of Workers'
Compensation Insurance and adequate levels of General Liability Insurance $1,000,000 and Automobile Insurance $1,000,000.
Bid specifications are available beginning March 10, 2026. Contractors must register with YMHA to obtain the bid specification.
All addendums and project notifications will be sent by YMHA, therefore registration is required. Questions about the drawings
and specifications shall be answered by David Martino, YMHA , Dmartino@ymhaoline.com. All questions must be asked by
5:00pm March 26, 2026 to be considered a part of the bid package.
As indicated on Form HUD-5369, if applicable, a bid bond or certified check for 10% of total bid will be held until contract is
entered into. Performance Bond and Payment Bond equal to 100% of contract amount shall be obtained by successful bidder
prior to contract signing. Bid and Contract Bond must be certified by surety broker and must be registered and approved by the
State of Ohio.
This contract does require compliance with Davis-Bacon Regulations. Refer to HUD-5370 and wage determination in spec.
YMHA reserves the right to review and rate the qualifications, experience, bid history, and past performance of the bidders under
their current and past operating names, regardless of low bid. YMHA reserves the right to waive informalities in bidding and
reject any, and all bids.
No bid shall be withdrawn for a period of ninety (90) days after the bid opening without documentation and the consent of
YMHA.
All sub-contractors, if any, must be approved in writing by YMHA prior to working on site. Sub-contractor request shall include
all forms and insurance requirements as required of the general contractor.
YMHA has a goal to award 25% of all contracts to disadvantaged business enterprises (DBEs).
NEW: HUD's new Section 3 regulations are found at 24 CFR Part 75. The complete regulation can be found at:
https://www.govinfo.gov/content/pkg/FR-2020-09-29/pdf/2020-19185.pdf
All labor hours provided by the contractor under this contract will need reported to YMHA for purposes of meeting Section 3
reporting requirements. The contractor will be required to provide and work alongside YMHA to identify and track Section 3
labor hours and non-Section 3 labor hours. HUD form 5370 Clause 40 covers Section 3.
Firms including sub-contractors debarred from participating when federal funds are involved cannot participate and will not be
considered for contract award. No member, officer or employee of the local authority during his tenure or for one year thereafter
shall have any interest, direct or indirect, in this contract or the proceeds thereof.
A non-mandatory, but strongly recommended pre-bid meeting and walk through showing of the site is scheduled for
Wednesday, March 18, 2024 at 11:00 a.m. at the project site.
SECTION 00 0110
TABLE OF CONTENTS
DIVISON 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0002 Bid Solicitation
00 0110 Table of Contents
00 2113a Instructions to Bidders Cover Sheet
00 2113b Instructions to Bidders HUD Form 5369
00 4113a Bid Form
00 4113b BABA Bid Form
00 4313 Bid Security
Bid Guarantee
00 4343 Prevailing Wage Requirements and Compliance Affidavit
00 4500 Representations and Certifications Cover Sheet
HUD Form 5369-A
HUD Form 2530
00 4502 Certificate and Release
00 4503 Drug & Alcohol-Free Workplace Certification
00 4504 Equal Employment Opportunity Certification
00 4513 Bidder Qualifications
00 4514a HUD Section 3 Certification Cover Sheet
00 4514b HUD Section 3 Certification
00 4515 Affidavit of Minority or Woman-Owned Business
00 4519 Non-Collusion Affidavit
00 5000 Agreement Form Cover Sheet
AIA Document A101-2017
00 6613 Request for Interpretation Form
00 7200 General Conditions
HUD Form 5370 General Conditions
00 7202 Supervise Payment of Appointing Officer Certificate
00 7203 Waiver of Lien
00 7204 Contractor's Warranty
00 7315 Retainage Requirements
00 7316 ALTERNATE 01: Build America, Buy America (BABA) Requirements
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 General Requirements
01 1100 Summary of Work
01 2100 Allowances
01 2500 Substitution Procedures
01 2600 Contract Modification Procedures
01 2900 Payment Procedures
01 3000 Administrative Requirements
01 3100 Project Management and Coordination
01 3216 Construction Progress Schedule
01 3300 Submittal Procedures
01 4000 Quality Requirements
01 4100 Regulatory Requirements
01 4126 Permit Requirements
01 4216 Definitions
01 4219 Reference Standards
01 5000 Temporary Facilities and Controls
01 6000 Product Requirements
01 7000 Execution and Closeout Requirements
01 7419 Construction Waste Management and Disposal
Youngstown Metropolitan Housing Authority 00 0110 - 1 TABLE OF CONTENTS
Victory Estates Bathroom Rehabilitation
TC Project No.: 60A25
01 7700 Closeout Procedures
01 7800 Closeout Submittals
01 7823 Operation & Maintenance Data
01 7839 Project Record Documents
DIVISION 02 - EXISTING CONDITIONS - NOT USED
DIVISION 03 - CONCRETE - NOT USED
DIVISION 04 - MASONRY - NOT USED
DIVISION 05 - METALS - NOT USED
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1000 Rough Carpentry
06 1600 Sheathing
06 2023 Interior Finish Carpentry
06 6400 Plastic Paneling
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 0500 Basic Materials and Methods
07 1416 Fluid-Applied Waterproofing
07 9200 Joint Sealants
DIVISION 08 - OPENINGS - NOT USED
DIVISION 09 - FINISHES
09 0500 Basic Materials and Methods Finishes
09 0561 Flooring Preparation
09 6500 Resilient Flooring
09 9000 Painting
09 9000.1 Painting and Coating (Schedule)
DIVISION 10 - SPECIALTIES
10 2800 Toilet & Bath Accessories
10 5623 Wire Storage Shelving
DIVISION 11 - EQUIPMENT - NOT USED
DIVISION 12 - FURNISHINGS
12 3530 Residential Casework
12 3600 Solid Surface Fabrications
DIVISION 21 - FIRE SUPPRESSION - NOT USED
DIVISION 22 - PLUMBING
See Plumbing Drawings.
DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING - NOT USED
DIVISION 26 - ELECTRICAL
See Electrical Drawings.
DIVISION 27 - COMMUNICATIONS - NOT USED
Youngstown Metropolitan Housing Authority 00 0110 - 2 TABLE OF CONTENTS
Victory Estates Bathroom Rehabilitation
TC Project No.: 60A25
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY- NOT USED
DIVISION 31 - EARTHWORK - NOT USED
DIVISION 32 - EXTERIOR IMPROVEMENTS - NOT USED
DIVISION 33 - UTILITIES - NOT USED
END OF TABLE OF CONTENTS
Youngstown Metropolitan Housing Authority 00 0110 - 3 TABLE OF CONTENTS
Victory Estates Bathroom Rehabilitation
TC Project No.: 60A25
SECTION 00 2113a
INSTRUCTIONS TO BIDDERS
PART 1 - GENERAL
1.1 SUMMARY
A. The Instructions to Bidders for this Project shall be form HUD-5369 Instructions to
Bidders for Contracts, Public and Indian Housing Programs.
B. Provide 00 4113A Bid Form & 00 4113B BABA Bid Form.
a. Bid Bond to be 10% of the higher sum from the (2) bid forms.
PART 2 - PRODUCTS - NOT USED
PART 3 - EXECUTION - NOT USED
END OF SECTION 00 2113a
Youngstown Metropolitan Housing Authority 00 2113a - 1 INSTRUCTIONS TO BIDDERS
Victory Estates Bathroom Rehabilitation
TC Project No.: 60A25
U.S. Department of Housing and
Urban Development
Office of Public and Indian Housing
Instructions to Bidders for Contracts
Public and Indian Housing Programs
Previous edition is obsolete form HUD-5369 (10/2002)
Instructions to Bidders for Contracts
Public and Indian Housing Programs
Table of Contents
2. Explanations and Interpretations to Prospective
Clause Page
Bidders
1. Bid Preparation and Submission 1
(a) Any prospective bidder desiring an explanation or interpretation
2. Explanations and Interpretations to Prospective Bidders 1
of the solicitation, specifications, drawings, etc., must request it at
3. Amendments to Invitations for Bids 1
least 7 days before the scheduled time for bid opening. Requests
4. Responsibility of Prospective Contractor 1 may be oral or written. Oral requests must be confirmed in writing.
5. Late Submissions, Modifications, and Withdrawal of Bids1 The only oral clarifications that will be provided will be those clearly
related to solicitation procedures, i.e., not substantive technical
6. Bid Opening 2
information. No other oral explanation or interpretation will be
7. Service of Protest 2
provided. Any information given a prospective bidder concerning
8. Contract Award 2 this solicitation will be furnished promptly to all other prospective
9. Bid Guarantee 3 bidders as a written amendment to the solicitation, if that information
is necessary in submitting bids, or if the lack of it would be prejudicial
10. Assurance of Completion 3
to other prospective bidders.
11. Preconstruction Conference 3
(b) Any information obtained by, or provided to, a bidder other than
12. Indian Preference Requirements 3
by formal amendment to the solicitation shall not constitute a change
to the solicitation.
1. Bid Preparation and Submission
(a) Bidders are expected to examine the specifications, drawings, 3. Amendments to Invitations for Bids
all instructions, and, if applicable, the construction site (see also the (a) If this solicitation is amended, then all terms and conditions
contract clause entitled Site Investigation and Conditions Affect- which are not modified remain unchanged.
ing the Work of the General Conditions of the Contract for Construc-
tion). Failure to do so will be at the bidders' risk. (b) Bidders shall acknowledge receipt of any amendment to this
solicitation (1) by signing and returning the amendment, (2) by
(b) All bids must be submitted on the forms provided by the Public identifying the amendment number and date on the bid form, or (3)
Housing Agency/Indian Housing Authority (PHA/IHA). Bidders shall by letter, telegram, or facsimile, if those methods are authorized in
furnish all the information required by the solicitation. Bids must be the solicitation. The PHA/IHA must receive acknowledgement by the
signed and the bidder's name typed or printed on the bid sheet and time and at the place specified for receipt of bids. Bids which fail to
each continuation sheet which requires the entry of information by acknowledge the bidder's receipt of any amendment will result in the
the bidder. Erasures or other changes must be initialed by the person rejection of the bid if the amendment(s) contained information which
signing the bid. Bids signed by an agent shall be accompanied by substantively changed the PHA's/IHA's requirements.
evidence of that agent's authority. (Bidders should retain a copy of
(c) Amendments will be on file in the offices of the PHA/IHA and the
their bid for their records.)
Architect at least 7 days before bid opening.
(c) Bidders must submit as part of their bid a completed form HUD-
4. Responsibility of Prospective Contractor
5369-A, "Representations, Certifications, and Other Statements of
Bidders." (a) The PHA/IHA will award contracts only to responsible prospec-
tive contractors who have the ability to perform successfully under
(d) All bid documents shall be sealed in an envelope which shall be
the terms and conditions of the proposed contract. In determining
clearly marked with the words "Bid Documents," the Invitation for
the responsibility of a bidder, the PHA/IHA will consider such matters
Bids (IFB) number, any project or other identifying number, the
as the bidder's:
bidder's name, and the date and time for receipt of bids.
(1) Integrity;
(e) If this solicitation requires bidding on all items, failure to do so will
disqualify the bid. If bidding on all items is not required, bidders (2) Compliance with public policy;
should insert the words "No Bid" in the space provided for any item (3) Record of past performance; and
on which no price is submitted.
(4) Financial and technical resources (including construction
(f) Unless expressly authorized elsewhere in this solicitation, alter- and technical equipment).
nate bids will not be considered.
(b) Before a bid is considered for award, the bidder may be re-
(g) Unless expressly authorized elsewhere in this solicitation, bids quested by the PHA/IHA to submit a statement or other documenta-
submitted by telegraph or facsimile (fax) machines will not be tion regarding any of the items in paragraph (a) above. Failure by the
considered. bidder to provide such additional information shall render the bidder
nonresponsible and ineligible for award.
(h) If the proposed contract is for a Mutual Help project (as de-
scribed in 24 CFR Part 905, Subpart E) that involves Mutual Help
contributions of work, material, or equipment, supplemental informa-
tion regarding the bid advertisement is provided as an attachment to
this solicitation.
Previous edition is obsolete Page 1 of 4 form HUD-5369 (10/2002)
5. Late Submissions, Modifications, and Withdrawal of Bids 6. Bid Opening
(a) Any bid received at the place designated in the solicitation after All bids received by the date and time of receipt specified in the
the exact time specified for receipt will not be considered unless it is solicitation will be publicly opened and read. The time and place of
received before award is made and it: opening will be as specified in the solicitation. Bidders and other
interested persons may be present.
(1) Was sent by registered or certified mail not later than the
fifth calendar day before the date specified for receipt of offers (e.g., 7. Service of Protest
an offer submitted in response to a solicitation requiring receipt of
(a) Definitions. As used in this provision:
offers by the 20th of the month must have been mailed by the 15th);
"Interested party" means an actual or prospective bidder whose
(2) Was sent by mail, or if authorized by the solicitation, was
direct economic interest would be affected by the award of the
sent by telegram or via facsimile, and it is determined by the PHA/IHA
contract.
that the late receipt was due solely to mishandling by the PHA/IHA
after receipt at the PHA/IHA; or "Protest" means a written objection by an interested party to this
solicitation or to a proposed or actual award of a contract pursuant
(3) Was sent by U.S. Postal Service Express Mail Next Day
to this solicitation.
Service - Post Office to Addressee, not later than 5:00 p.m. at the
place of mailing two working days prior to the date specified for (b) Protests shall be served on the Contracting Officer by obtaining
receipt of proposals. The term "working days" excludes weekends written and dated acknowledgement from -
and observed holidays.
(b) Any modification or withdrawal of a bid is subject to the same
conditions as in paragraph (a) of this provision.
(c) The only acceptable evidence to establish the date of mailing of
a late bid, modification, or withdrawal sent either by registered or
certified mail is the U.S. or Canadian Postal Service postmark both
on the envelope or wrapper and on the original receipt from the U.S.
or Canadian Postal Service. Both postmarks must show a legible
date or the bid, modification, or withdrawal shall be processed as if
[Contracting Officer designate the official or location where a protest
mailed late. "Postmark" means a printed, stamped, or otherwise
may be served on the Contracting Officer]
placed impression (exclusive of a postage meter machine impres-
sion) that is readily identifiable without further action as having been (c) All protests shall be resolved in accordance with the PHA's/
supplied and affixed by employees of the U.S. or Canadian Postal IHA's protest policy and procedures, copies of which are maintained
Service on the date of mailing. Therefore, bidders should request the at the PHA/IHA.
postal clerk to place a hand cancellation bull's-eye postmark on both
8. Contract Award
the receipt and the envelope or wrapper.
(a) The PHA/IHA will evaluate bids in response to this solicitation
(d) The only acceptable evidence to establish the time of receipt at the
without discussions and will award a contract to the responsible
PHA/IHA is the time/date stamp of PHA/IHA on the proposal wrapper or
bidder whose bid, conforming to the solicitation, will be most advan-
other documentary evidence of receipt maintained by the PHA/IHA.
tageous to the PHA/IHA considering only price and any price-related
(e) The only acceptable evidence to establish the date of mailing of factors specified in the solicitation.
a late bid, modification, or withdrawal sent by Express Mail Next Day
(b) If the apparent low bid received in response to this solicitation
Service-Post Office to Addressee is the date entered by the post
exceeds the PHA's/IHA's available funding for the proposed contract
office receiving clerk on the "Express Mail Next Day Service-Post
work, the PHA/IHA may either accept separately priced items (see
Office to Addressee" label and the postmark on both the envelope or
8(e) below) or use the following procedure to determine contract
wrapper and on the original receipt from the U.S. Postal Service.
award. The PHA/IHA shall apply in turn to each bid (proceeding in
"Postmark" has the same meaning as defined in paragraph (c) of this
order from the apparent low bid to the high bid) each of the separately
provision, excluding postmarks of the Canadian Postal Service.
priced bid deductible items, if any, in their priority order set forth in
Therefore, bidders should request the postal clerk to place a legible
this solicitation. If upon the application of the first deductible item to
hand cancellation bull's eye postmark on both the receipt and Failure
all initial bids, a new low bid is within the PHA's/IHA's available
by a bidder to acknowledge receipt of the envelope or wrapper.
funding, then award shall be made to that bidder. If no bid is within
(f) Notwithstanding paragraph (a) of this provision, a late modifica- the available funding amount, then the PHA/IHA shall apply the
tion of an otherwise successful bid that makes its terms more second deductible item. The PHA/IHA shall continue this process
favorable to the PHA/IHA will be considered at any time it is received until an evaluated low bid, if any, is within the PHA's/IHA's available
and may be accepted. funding. If upon the application of all deductibles, no bid is within the
PHA's/IHA's available funding, or if the solicitation does not request
(g) Bids may be withdrawn by written notice, or if authorized by this
separately priced deductibles, the PHA/IHA shall follow its written
solicitation, by telegram (including mailgram) or facsimile machine
policy and procedures in making any award under this solicitation.
transmission received at any time before the exact time set for
opening of bids; provided that written confirmation of telegraphic or (c) In the case of tie low bids, award shall be made in accordance
facsimile withdrawals over the signature of the bidder is mailed and with the PHA's/IHA's written policy and procedures.
postmarked prior to the specified bid opening time. A bid may be
(d) The PHA/IHA may reject any and all bids, accept other than the
withdrawn in person by a bidder or its authorized representative if,
lowest bid (e.g., the apparent low bid is unreasonably low), and waive
before the exact time set for opening of bids, the identity of the person
informalities or minor irregularities in bids received, in accordance
requesting withdrawal is established and the person signs a receipt
with the PHA's/IHA's written policy and procedures.
for the bid.
Previous edition is obsolete Page 2 of 4 form HUD-5369 (10/2002)
(e) Unless precluded elsewhere in the solicitation, the PHA/IHA (c) Each bond shall clearly state the rate of premium and the total
may accept any item or combination of items bid. amount of premium charged. The current power of attorney for the
person who signs for the surety company must be attached to the
(f) The PHA/IHA may reject any bid as nonresponsive if it is
bond. The effective date of the power of attorney shall not precede
materially unbalanced as to the prices for the various items of work
the date of the bond. The effective date of the bond shall be on or after
to be performed. A bid is materially unbalanced when it is based on
the execution date of the contract.
prices significantly less than cost for some work and prices which are
significantly overstated for other work. (d) Failure by the successful bidder to obtain the required assur-
ance of completion within the time specified, or within such extended
(g) A written award shall be furnished to the successful bidder within
period as the PHA/IHA may grant based upon reasons determined
the period for acceptance specified in the bid and shall result in a
adequate by the PHA/IHA, shall render the bidder ineligible for
binding contract without further action by either party.
award. The PHA/IHA may then either award the contract to the next
9. Bid Guarantee (applicable to construction and equip- lowest responsible bidder or solicit new bids. The PHA/IHA may
ment contracts exceeding $25,000) retain the ineligible bidder's bid guarantee.
All bids must be accompanied by a negotiable bid guarantee which 11. Preconstruction Conference (applicable to construction
shall not be less than five percent (5%) of the amount of the bid. The contracts)
bid guarantee may be a certified check, bank draft, U.S. Government
After award of a contract under this solicitation and prior to the start
Bonds at par value, or a bid bond secured by a surety company
of work, the successful bidder will be required to attend a
acceptable to the U.S. Government and authorized to do business in
preconstruction conference with representatives of the PHA/IHA and
the state where the work is to be performed. In the case where the
its architect/engineer, and other interested parties convened by the
work under the contract will be performed on an Indian reservation
PHA/IHA. The conference will serve to acquaint the participants with
area, the bid guarantee may also be an irrevocable Letter of Credit
the general plan of the construction operation and all other require-
(see provision 10, Assurance of Completion, below). Certified
ments of the contract (e.g., Equal Employment Opportunity, Labor
checks and bank drafts must be made payable to the order of the
Standards). The PHA/IHA will provide the successful bidder with the
PHA/IHA. The bid guarantee shall insure the execution of the
date, time, and place of the conference.
contract and the furnishing of a method of assurance of completion
by the successful bidder as required by the solicitation. Failure to 12. Indian Preference Requirements (applicable only if
submit a bid guarantee with the bid shall result in the rejection of the this solicitation is for a contract to be performed on a
bid. Bid guarantees submitted by unsuccessful bidders will be project for an Indian Housing Authority)
returned as soon as practicable after bid opening.
(a) HUD has determined that the contract awarded under this
10. Assurance of Completion solicitation is subject to the requirements of section 7(b) of the Indian
Self-Determination and Education Assistance Act (25 U.S.C. 450e(b)).
(a) Unless otherwise provided in State law, the successful bidder
Section 7(b) requires that any contract or subcontract entered into for
shall furnish an assurance of completion prior to the execution of any
the benefit of Indians shall require that, to the greatest extent feasible
contract under this solicitation. This assurance may be [Contracting
Officer check applicable items] - (1) Preferences and opportunities for training and employment
(other than core crew positions; see paragraph (h) below) in connec-
[ ] (1) a performance and payment bond in a penal sum of 100
tion with the administration of such contracts or subcontracts be
percent of the contract price; or, as may be required or permitted by
given to qualified "Indians." The Act defines "Indians" to mean
State law;
persons who are members of an Indian tribe and defines "Indian
[ ] (2) separate performance and payment bonds, each for 50 tribe" to mean any Indian tribe, band, nation, or other organized
percent or more of the contract price; group or community, including any Alaska Native village or regional
or village corporation as defined in or established pursuant to the
[ ] (3) a 20 percent cash escrow;
Alaska Native Claims Settlement Act, which is recognized as eligible
[ ] (4) a 25 percent irrevocable letter of credit; or, for the special programs and services provided by the United States
to Indians because of their status as Indians; and,
[ ] (5) an irrevocable letter of credit for 10 percent of the total
contract price with a monitoring and disbursements agreement with (2) Preference in the award of contracts or subcontracts in
the IHA (applicable only to contracts awarded by an IHA under the connection with the administration of contracts be given to Indian
Indian Housing Program). organizations and to Indian-owned economic enterprises, as de-
fined in section 3 of the Indian Financing Act of 1974 (25 U.S.C.
(b) Bonds must be obtained from guarantee or surety companies
1452). That Act defines "economic enterprise" to mean any Indian-
acceptable to the U.S. Government and authorized to do business in
owned commercial, industrial, or business activity established or
the state where the work is to be performed. Individual sureties will
organized for the purpose of profit, except that the Indian ownership
not be considered. U.S. Treasury Circular Number 570, published
must constitute not less than 51 percent of the enterprise; "Indian
annually in the Federal Register, lists companies approved to act as
organization" to mean the governing body of any Indian tribe or entity
sureties on bonds securing Government contracts, the maximum
established or recognized by such governing body; "Indian" to mean
underwriting limits on each contract bonded, and the States in which
any person who is a member of any tribe, band, group, pueblo, or
the company is licensed to do business. Use of companies listed in
community which is recognized by the Federal Government as
this circular is mandatory. Copies of the circular may be downloaded
eligible for services from the Bureau of Indian Affairs and any
on the U.S. Department of Treasury website http://
"Native" as defined in the Alaska Native Claims Settlement Act; and
www.fms.treas.gov/c570/index.html, or ordered for a minimum fee
Indian "tribe" to mean any Indian tribe, band, group, pueblo, or
by contacting the Government Printing Office at (202) 512-2168.
community including Native villages and Native groups (including
Previous edition is obsolete Page 3 of 4 form HUD-5369 (10/2002)

With GovernmentContracts, you can:
Follow OHARNG Tactical Vehicle Maneuver Lane Improvement at Camp James A. Garfield Joint
DEPT OF DEFENSE
Bid Due: 8/13/2026
Follow Altitude Chambers Contractor Logistics Support for 12 Chambers Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 8/12/2026
Follow Altitude Chambers Contractor Logistics Support for 12 Chambers Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 8/12/2026
Follow Novel Thermal and Power/Energy Management Architectures for Hypersonic Applications Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 8/15/2026