| Location: | Washington |
|---|---|
| Posted: | Oct 14, 2025 |
| Due: | Nov 4, 2025 |
| Agency: | City of Vancouver |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025 Quote 72 |
| Publication URL: | To access bid details, please log in. |
Project Description: This contract provides for design and build two (2) well control panel for installation within new municipal drinker water pumphouses. The attached specifications and supplements outline the control fabrication and design. The City will furnish this panel under a to be solicited construction contract to construct the well pumphouses. This panel will control the new well equipment through the City SCADA system.
Engineer's Estimate - $54,400

With GovernmentContracts, you can:
...concrete panels, repairing spalled panels, replacing pavement markings, temporary traffic control... Contract I-5/I-205, ...
State Government of Washington
Bid Due: 6/17/2026
...chemical pump system includes control and alarm panels with Owner furnished equipment for ...
Pierce County
Bid Due: 6/10/2026
...removing and replacing precast cement concrete panels (PCCP), grinding, removing and replacing... guardrail, ...
State Government of Washington
Bid Due: 6/10/2026
...grid deck panels and sidewalk curb for Bridge No. 12/12S, temporary traffic control, ...
State Government of Washington
Bid Due: 7/01/2026