| Location: | Utah |
|---|---|
| Posted: | Oct 14, 2025 |
| Due: | Nov 6, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-52-102 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work includes the removal of two (2) existing dry-pit chopper pumps and VFDs, furnishing and installing four (4) new dry-pit chopper pumps and VFDs, two (2) new concrete pedestals, two new mag flow meters, new valves and ductile iron piping and fittings, replacement of an existing plug valve, pipe supports, pipeline coating, removal of existing wet well mixer, removal and replacement of existing wet ultrasonic level sensor with new radar level sensor, replacement of existing exhaust fan, electrical conduits and wiring, and replacement of main control panel/RTU back panel.

With GovernmentContracts, you can:
...and Related Structures Construction Place of Performance: Monticello , UT 84535 USA Description ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/10/2026
...quali ed design-build Contractors/Engineers for the design and construction of a new police ...
Vernal city
Bid Due: 8/27/2026
...850 feet of 11/4" HDPE communication conduit with related pull boxes; construction of ...
Washington County Water Conservancy District
Bid Due: 7/28/2026