| Location: | Utah |
|---|---|
| Posted: | Oct 14, 2025 |
| Due: | Nov 6, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-52-102 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work includes the removal of two (2) existing dry-pit chopper pumps and VFDs, furnishing and installing four (4) new dry-pit chopper pumps and VFDs, two (2) new concrete pedestals, two new mag flow meters, new valves and ductile iron piping and fittings, replacement of an existing plug valve, pipe supports, pipeline coating, removal of existing wet well mixer, removal and replacement of existing wet ultrasonic level sensor with new radar level sensor, replacement of existing exhaust fan, electrical conduits and wiring, and replacement of main control panel/RTU back panel.

With GovernmentContracts, you can:
...FOR BIDS FOR SAND HOLLOW SOUTH SIDE PIPELINE REPLACEMENT The Washington County Water ...
Washington County Water Conservancy District
Bid Due: 9/29/2026
...feet of 18-inch sanitary sewer pipeline, 3 sanitary sewer manholes, a 434-foot-long guided ...
State Government of Utah
Bid Due: 10/13/2026
..., a recreation area, pipelines, and a booster pump station. Water from the ...
Washington County Water Conservancy District
Bid Due: 11/02/2026