Geothermal Permeable Pavement Construction, Wilson, NC

Location: North Carolina
Posted: Jul 29, 2025
Due: Aug 20, 2025
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 63-KGS1113518
Publication URL: To access bid details, please log in.
Solicitation Number: 63-KGS1113518
Project Title: Geothermal Permeable Pavement Construction, Wilson, NC
Description: NC State Department of Biological and Agricultural Engineering (hereafter referred to as NC State or University) seeks proposals from qualified contractors (hereafter referred to as contractor or supplier) to perform the construction of a geothermal permeable pavement system in a parking lot at 114 Douglas St S, Wilson, North Carolina, 27893 (35°43' 25.6'' N, 77°54' 36.9'' W). The purpose of the proposed project is to improve stormwater runoff from an existing impervious parking lot by retrofitting a portion of the parking stalls with permeable pavement. Additionally, geothermal coils will be installed at the base of the permeable pavement to generate energy, which will be used to regulate temperature in an adjacent greenhouse. The construction is part of an innovative stormwater project funded by the North Carolina Land and Water Fund (NCL&WF) and will be used in research trials.
Opening Date: 8/20/2025 2:00 PM
Posted Date: 7/29/2025
Status: Open
Department: NORTH CAROLINA STATE UNIVERSITY
Solicitation Number
*
63-KGS1113518
Department
NORTH CAROLINA STATE UNIVERSITY
Status Reason
Open
Opening Date
2025-08-20T14:00:00.0000000
Posted Date
*
2025-07-29T13:03:12.0000000Z
Commodity Code
Water pollution
Mandatory Conference/Site Visit
2025-08-11T04:00:00.0000000Z
Special Instructions
Mandatory Site Visit: 08/11/2025, 10:00 AM; County, Wilson
Description
NC State Department of Biological and Agricultural Engineering (hereafter referred to as NC State or University) seeks proposals from qualified contractors (hereafter referred to as contractor or supplier) to perform the construction of a geothermal permeable pavement system in a parking lot at 114 Douglas St S, Wilson, North Carolina, 27893 (35°43' 25.6'' N, 77°54' 36.9'' W). The purpose of the proposed project is to improve stormwater runoff from an existing impervious parking lot by retrofitting a portion of the parking stalls with permeable pavement. Additionally, geothermal coils will be installed at the base of the permeable pavement to generate energy, which will be used to regulate temperature in an adjacent greenhouse. The construction is part of an innovative stormwater project funded by the North Carolina Land and Water Fund (NCL&WF) and will be used in research trials.
Attachments
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...RFQ: Preliminary Engineering Report and Water Line Design - Advertisement (PDF) Request... for ...

City of Monroe

Bid Due: 6/23/2026

.... Engineering Department Traffic Division Request for Letters of Interest #: 320-150426FD Rebid ...

State Government of North Carolina

Bid Due: 6/09/2026

...and energy recovery wheels. Opening Date: 6/18/2026 2:00 PM Posted Date: 5/26/2026 Status: ...

State Government of North Carolina

Bid Due: 6/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.