| Location: | Ohio |
|---|---|
| Posted: | Apr 7, 2026 |
| Due: | Jun 2, 2026 |
| Agency: | Northeast Ohio Regional Sewer District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | EB-2509 |
| Publication URL: | To access bid details, please log in. |
Project ID: EB-2509
Title: Southerly Tunnel Dewatering Pump Station
Addenda: 0
Release Date: 4/7/2026
Due Date: 6/2/2026
The Southerly Tunnel Dewatering Pump Station (STDPS) will be located in the Village of Cuyahoga Heights at the southern (and downstream) end of the Southerly Storage Tunnel. The street address of the STDPS will be 4660 East 49th Street. The STDPS will be a submersible pump station of nominal 54 MGD capacity. The submersible pumps will be installed in the 65-ft diameter by 180-ft deep mining shaft designed and partially built out by others at the southern end of the Southerly Storage Tunnel. The STDPS Project will complete the build-out of the shaft, converting it into the pump station's wet well. A pump station support building will be constructed at grade over the wet well; it will contain an electrical room, a control room, restrooms, a meeting/work space and a large space around the wet well to support operation and maintenance activities associated with the submersible pumps and a deep bar screen raking system.
In addition to constructing the STDPS facility, the STDPS project will outfit three remote flow drop sites with isolation gates and the ancillary equipment required to operate them. Also, at a number of remote structures already existing or built under the Southerly Storage Tunnel and Kingsbury Run Consolidation Sewer projects, the STDPS project will perform a variety of planned internal improvements to ready those structures for operation – primarily by removing flume pipes and bulkheads, raising weir walls, adjusting or installing weir plates and orifice plates, and placing concrete in-fill.
The STDPS Project will commission the Southerly Storage Tunnel System and turn over a fully functional system to the NEORSD.
The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams.
In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion.
NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual . We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents.

With GovernmentContracts, you can:
...-6595 www.mtvernonoh.gov ENGINEERING DEPARTMENT Annual Request for Qualifications 2026-7 The City... the American ...
Mount Vernon city
Bid Due: 6/12/2026
...at 141 W Xenia Avenue, Cedarville, Ohio 45314. Representatives from Patriot Engineering and ...
County of Greene
Bid Due: 6/23/2026
...Category 24: Safety, Protection & Environmental Services & Equipment Commodity Category 25...; Sampling ...
State Government of Ohio
Bid Due: 11/25/2030
...Invitation For Bid Engineering and Construction Project ID: EB-2510 Release Date: Tuesday, April ...
Northeast Ohio Regional Sewer District
Bid Due: 7/14/2026