| Location: | Florida |
|---|---|
| Posted: | Apr 22, 2025 |
| Due: | May 28, 2025 |
| Agency: | State Government of Florida |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-12379 |
| Publication URL: | To access bid details, please log in. |
| Code | Description |
| 12165200 | Water treatment |
| 30121700 | Road and railroad construction materials |
| 70171705 | Pipelines maintenance or management services |
| 72121000 | New industrial building and warehouse construction services |
| 72121507 | Tank construction and servicing |
| 72121508 | Preparation plant construction service |
| 72141113 | Oil and gas pipeline construction service |
| 72141120 | Sewer line construction service |
| 72141121 | Water main construction service |
| 72141126 | Underground utilities construction service |
| 95121640 | Pipeline |
The City of Winter Haven is soliciting bids from a licensed General Contractor for the CR 653 RWM Install and Reroute FM project in Winter Haven, FL 33881. The project consists of installing approximately 4900 feet of 12-inch PVC reclaim pipe from the south of Cunningham Rd to an existing 6-inch reclaim gate valve south of Lake Ashton subdivision as shown on the plan. Install approximately 3600 feet of 20-inch reclaim pipe from our existing 20-inch reclaim PVC pipe, east of Hwy 653, north of Cunningham Rd to the south of Eloise Loop Rd (Directional Drill No deeper than 10 feet to the top of the pipe). Along with the reclaim pipe, install approximately 8,500 feet of 2” fiber conduit. Install an 8-inch PVC force main east of Hwy 653 near Cunningham Rd to connect to the existing 10-inch force main. Cap the existing force main at the same location and at the south of Coon Lake Rd as shown on the plan to abandon in place.
Please direct all questions to:| Description | Date/Time |
| ITB-25-23 Reclaimed Water Transm Main Ext CR653 minus plans and tech specs | Apr 22, 2025, 10:55:08 PM |
| CR 653 RWM Install and Reroute FM Bid Form - RETURN WITH BID RESPONSE | Apr 22, 2025, 10:55:08 PM |
| Attachment E - Technical Specs - 2023-324R-003 CR 653 RWM Install and Reroute FM | Apr 22, 2025, 10:55:08 PM |
| Attachment D - 100% Plans - 2023-324R-003 CR 653 RWM Install and Reroute FM | Apr 22, 2025, 10:55:08 PM |

With GovernmentContracts, you can:
...Description: SEWER PIPELINE, MANHOLE CLEANING AND INSPECTON SERVICES, Department: Purchasing Buyer... (RPQ) Category: ...
Palm Beach County
Bid Due: 2/03/2030
...Description: South County Reclaimed Water Transmission Pipeline Phase 1B Department: Water... for Prequalifications ...
Palm Beach County
Bid Due: 2/03/2030
...Description: SEWER PIPELINE, MANHOLE CLEANING AND INSPECTON SERVICES, Department: Purchasing Buyer... Closing Date ...
Palm Beach County
Bid Due: 2/03/2030
...Description: S Co RCWM Pipeline Ph 2 & Lyons Rd FM, Yamato to ...
Palm Beach County
Bid Due: 6/22/2031