The scope of this project includes, but is not limited to, localized repair of the structural deck, water intrusion mitigation and facility related improvements.
These include:
-
Pool Resurfacing
-
Pool deck waterproofing resurfacing including membrane and topping slab where damaged
-
Removal of 3-meter diving board and fixed lifeguard chairs
-
Resurfacing and repainting underside of roof deck and trusses.
-
Mechanical Heater / De-humidifier replacement
-
Path-of-Travel upgrades:
-
Walkway from Public Right-of-Way to accessible entry
-
Stair and Ramp Replacement
-
Accessible parking upgrades.
Mandatory Pre-Bid Walk Through:
Date and Location:
A mandatory bidders’ conference will be held on August 21, 2025, at 10 a.m. and September 3, 2025, at 10 a.m.
on-site at Hayward Plunge, Address: 24176 Mission Blvd, Hayward, 94544.
Notice:
Additional Pre-bid Meeting on September 11, 2025, at 10 a.m.
All bidders are required to sign in at ONE of the pre-bid conferences in order to bid the project. The on-site, in-person conference is expected to take approximately one hour. Failure to attend or tardiness will render bid/bidder ineligible.
Notice:
Virtual Bid Opening Date Change:
Friday, September 19,
Thursday September 25, 2025 at 2p.m.
Join Zoom Meeting :
https://us02web.zoom.us/j/88916520709?pwd=YAaQoEoncRzWjzHRa7nGEULC0v0ROb.1
Meeting ID: 889 1652 0709
Passcode: 675513
Plans and specs are available from East Bay Blueprint & Supply Company. See link below:
https://www.ipdservices.com/clients/eastbay/?HARD