| Location: | Utah |
|---|---|
| Posted: | Jun 11, 2025 |
| Due: | Jul 9, 2025 |
| Agency: | City of West Valley City |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-29 |
| Publication URL: | To access bid details, please log in. |
Project Description: Work includes the rehabilitation of approximately 543 feet of 6-inch diameter pipe, 2,210 feet of 8-inch diameter pipe, and 680 feet of 10-inch diameter pipe. Additional work consists of bypass pumping, removal of protruding laterals, restoration of existing sewer laterals, and all other associated items as specified in the plans and in accordance with the Contract Documents.

With GovernmentContracts, you can:
...drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, ...
State Government of Utah
Bid Due: 11/19/2026
...includes the replacement of 4" asbestos cement pipe (abandoned in place) with 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2027
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 12/01/2026