Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.

Location: Washington
Posted: Jul 30, 2025
Due: Aug 11, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W912DW25R15F0
Publication URL: To access bid details, please log in.
Follow
Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.
Active
Contract Opportunity
Notice ID
W912DW25R15F0
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTHWESTERN
Office
W071 ENDIST SEATTLE
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 30, 2025 03:28 pm PDT
  • Original Published Date: Jul 08, 2025 01:38 pm PDT
  • Updated Date Offers Due: Aug 11, 2025 12:00 pm PDT
  • Original Date Offers Due: Aug 08, 2025 02:00 pm PDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Oct 31, 2025
  • Original Inactive Date: Oct 31, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1BZ - CONSTRUCTION OF OTHER AIRFIELD STRUCTURES
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Hangars 3 and 4 (Building J00003), McChord Air Field, Joint Base Lewis McChord, WA 98438
Description View Changes
W912DW25R15F0_A0001****Amendment 0001 to RFP No. W912DW25R15F0 for project titled, Repair Fire Suppression System, Hangars 3 and 4, Joint Base Lewis-McChord, WA; PKG No. CE0737, is hereby issued to accomplish the following:_ Provide the first site visit sign in sheet._ Provide notification of a second site visit at Hangars 3 and 4 (Bldg. J00003), McChord Field, Joint Base Lewis McChord, WA. The second site visit will be conducted at 10:00 a.m. Pacific Daylight Time on 4 August 2025._ Provide a Geotechnical Report and a Hazardous Material Report._ Provide a map showing all the buildings the furniture and equipment is to be moved to._ Revise CE0737_Specifications EBS to remove any ambiguity concerning PM, Super, QCM, and SSHO roles. _ Extend the proposal due date from 2:00 p.m. Pacific Daylight Time (PDT) on 8 August 2025 to 12:00 p.m. PDT on 11 August 2025. No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. End of W912DW25R15F0_A0001****This is a solicitation for the award of a firm-fixed-price (FFP) contract to repair the fire suppression system in Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord, WA. This requirement will include the following scope of work:a. Repair Fire Suppression System, Hangars 3 and 4, Building J00003.Background: Building J00003 includes Hangar #3 and Hangar #4. Hangar #3 consists of approximately 16,742 square feet of first floor support spaces, 973 square feet of second floor support spaces, 73,459 square feet of Hangar Area that also includes 4,531 square feet of mechanical spaces above the center support areas yielding a total square footage of 95,705 square feet. Hangar #4 consists of approximately 16,376 square feet of first floor support spaces, 12,030 square feet of second floor support spaces, 75,010 square feet of Hangar Area that also includes 6,128 square feet of mechanical spaces above the center support areas yielding a total square footage of 109,544 square feet.Scope: Project will repair the failing fire suppression system in Hangars 3 and 4 (Building J00003). Work will include demolishing and repair by replacement of the high expansion foam system with an automatic sprinkler system, the wet-pipe automatic sprinkler system throughout the administrative support areas, and the fire alarm system with a fully addressable system that incorporates the fire alarm system control panel, remote power supply, initiation devices, and notification appliances. Work will also include repairing components of the ventilation and electrical systems and remediating asbestos contaminated material based on the assumption that there is underground asbestos-cement piping. Repair of the fire alarm system circuits and cabling shall be in accordance with the Unified Facilities Criteria (UFC). The fire suppression system will comply with UFC 4-211-01 Aircraft Maintenance Hangars, Chapter 5 (Air Force Specific Criteria), and Headquarters Air Force/A4 Memorandum Aircraft Hangar Fire Suppression System Modernization (3 June 2021).b. Repair Fire Pump House and Pumps, Building J00024.Background: The Fire Pump House (Building J00024) is 2,240 square feet and was built in 1968. The building is constructed of concrete and CMU with a 14-foot-high wall measured at the parapet. The building is built on a concrete slab that has multiple housekeeping pads, cut outs and anchors.Scope: The two (2) existing Fairbanks Morse diesel driven fire pumps at the East end of the Fire Pump House and the single Fairbanks Morse diesel driven foam fire pump at the east end of the Fire Pump House and their related equipment and piping, the existing foam storage tank, and concrete pads will be demolished and removed from the site. The remaining three (3) diesel fire pumps at the west end of the pump house will remain and continue to serve Hangar #1 and Hangar #2. The single exterior man door located in the South wall shall be replaced with a double wide exterior man door to allow work at the East end of the Fire pump house to occur. New fire pump work will include the installation of two (2) electrically driven fire pumps. Each of the two (2) electrically driven fire pumps shall be horizontal split case fire pumps that have an output rating of approximately 75 p.s.i. at 750 g.p.m. with a churn pressure of 88 p.s.i., a 150% rated capacity of 65 p.s.i., and a horsepower rating of approximately 65. The sprinkler, alarm and other support systems will also be replaced during the building repair.c. Repair Waterlines between Buildings J00003 and J00024.Scope: All existing 24-in. diameter underground mains serving Hangars 3 and 4 shall be demolished and removed from site. A new 8-in. Class 52 Ductile Iron Piping (DIP) will be installed from the Pump House (Building J00024) to serve Hangar #3 and Hangar #4. Each dedicated lead-in shall be brought into a new open trench with a metal grate wed walking surface allowing the piping to be visually seen and not be placed under the slab of either building. Replacement of the lines will require patching of the existing parking areas.d. Relocate Office Equipment to Support Repair Efforts.Scope: Existing Hangars 3 and 4 (Building J00003) are occupied. Prior to starting repair work, the contractor will need to relocate a significant amount of office furniture, equipment and specialty tools between hangars. Some furniture disassembly/reassembly will be required. The process will be reversed, moving staff equipment back into the hangars at the end of the project.The construction cost of this project is subject to the disclosure of the magnitude of construction projects in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204 and is estimated to be between $10,000,000.00 and $25,000,000.00.
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • KO CONTRACTING DIVISION 4735 EAST MARGINAL WAY SOUTH
  • SEATTLE , WA 98134-2329
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Apr 4, 2025[Sources Sought (Original)] Repair Fire Suppression Systems, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.
Jun 4, 2025[Presolicitation (Original)] Repair Fire Suppression Systems, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.
Jul 8, 2025[Solicitation (Original)] Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.
Aug 4, 2025[Solicitation (Updated)] Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.
Aug 7, 2025[Solicitation (Updated)] Repair Fire Suppression System, Hangars 3 and 4 on McChord Field, Joint Base Lewis-McChord (JBLM), WA.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.