Project Description: The project includes the following work: Base Bid: Temporary Site Security, Access, and Temporary Erosion Control; Select Earthwork including Materials Salvage and Outhaul, Excavation, and Trenching; Site Utilities including Irrigation Systems, Storm Drainage, and Subsurface Drainage; Chain Link Fencing and Ball Control Netting Systems; Permeable Aggregates and Synthetic Turf Surfacing; Asphalt Pavement Treatments, Base Aggregates, and Hot Mix Asphalt Paving; Ahtletic Field Sodding; Native Shrub and Groundcover Plantings; Landscape Restoration; and Final Cleaning & Demobilization.
Alternate Bid Item 1: Remove & Dispose of existing metal halide light fixtures & brackets on existing 100' poles, remove existing wiritng harnesses and ballast/enclosures, provide new LED floodlights, brackets, wiring harnesses, and LED drivers and enclosoures, connect to existing lighting circuit, replace lighting controller in existing enclosure at the adjacent facility electrical room, provide testing & commissioning, aiming, and post-installation adjustments as needed to meet performance & spill requirements.
Questions: Questions about this project should be directed in writing to:
A/E Name: D.A. Hogan & Associates, Inc.
Contact Person: Dave Anderson, PE
Phone Number: 206-485-0040
Email:
davea@dahogan.com
Copy:
ericg@dahogan.com
Pre-Bid Site Meeting: The Project site is available for inspection by prospective bidders at a pre-bid site meeting and walk-through at 10:00am on April 30, 2025 at Husky Soccer Stadium SW Entrance.
Bid Documents: Bid documents, plans, specifications and addenda are available to view at: https://university-of-washington.public-portal.us.workdayspend.com/

With GovernmentContracts, you can:
...temporary traffic bypasses and or road closures, removal of the existing fish barriers, ...
State Government of Washington
Bid Due: 7/16/2026
..., earthwork above and below ordinary high water, structure and wall construction, roadway...
State Government of Washington
Bid Due: 7/07/2027
...traffic bypasses, removal of the existing fish barriers, earthwork above and below ordinary ...
State Government of Washington
Bid Due: 12/23/2026
...Division 03 - Concrete Division 31 - Earthwork Division 32 - Exterior Improvements ...