2026 LRA Traffic Signal Replacement

Location: Georgia
Posted: Nov 5, 2026
Due: Nov 16, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: PE-66598-NONST-2026-000000007
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-66598-NONST-2026-000000007 2026 LRA Traffic Signal Replacement Gray, City Of
Nov 05, 2026 @ 08:27 AM
Nov 16, 2026 @ 04:30 PM
2026 LRA Traffic Signal Replacement

Start Date: Nov 05, 2026 @ 08:27 AM ET

End Date:
Nov 16, 2026 @ 04:30 PM ET

Event ID: PE-66598-NONST-2026-000000007
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: city
Fiscal Year: 2026


Description


The City of Gray is seeking a qualified company to replace the traffic signals at the intersection of West Clinton St. and Washburn Dr. consisting of 10 vertical three face traffic signals and two vertical four face traffic signals, complete municipal cabinet, and four-hundred foot of spanner wire.

NIGP Codes
Code Description
96882 Traffic Signal Installation
BuyerContact:

Cheyenne Morgan
c.morgan@grayga.us

478-508-4571

Attachment Preview

Section 2 - General Instructions
Section 1 Introduction & Project Overview
1.1
Purpose
The City of Gray ("Owner") is requesting proposals to select a qualified company ("Contractor" or "Proposer")
to replace the existing traffic signal at the intersection of West Clinton St. and Washburn Dr, as shown in Exhibit 1.
The purpose of this Request for Proposals is to solicit pricing and qualifications from qualified companies interested
in and experienced in providing the services requested herein. Funding for this project will be provided through the
Local Maintenance Improvement Grant (LMIG) from the Georgia Department of Transportation.
1.2
Scope of Work
The work to be completed shall consist of furnishing all labor, equipment, and materials necessary to and
all appurtenances necessary to provide a complete installation. The work consists of replacing 12 traffic signals, cabinet,
and four hundred feet of spanner wire.
Permits -None Required:
1.3
CITY OF GRAY 2

Section 2 - General Instructions
Exhibit 1
City of Gray, GA 3

Section 2 - General Instructions
Section 2 General Instructions
2.1 Submittal Instructions
Sealed proposals will be received until November 16, 2026 at 4:30 PM, the sealed bids
will be opened at 6:00 p.m. on November 16, 2026 at Gray City Hall, Attn:
Cheyenne Morgan, 109 James Street, Gray, GA 31032. One (1) original paper
copy shall be submitted.
Requests for Information (RFI's) shall be submitted in writing via email to Cheyenne
Morgan at c.morgan@grayga.us . RFI's will be accepted until 4:30 PM on November16,
2026. An Addendum, if needed, will be issued by 12:00 PM on November13, 2026.
Proposals will be evaluated by the OWNER and ENGINEER based on cost (60%), ability
to complete the project in a timely manner (workdays) (20%) and experience with similar
projects (20%). Any Proponent submitting shall have a complete minimum of five (5)
similar projects equal to or greater in size specified herein.
2.2
Submittal Format and Organization
Proposals shall be typed in an 11-point font size minimum on 8.5x11 paper and shall
be submitted in a sealed envelope. The proposal shall be organized in the following manner:
a. Transmittal Letter
A letter describing the method or approach the Contractor will use, the work days
needed to complete the work, and the Contractor's available start date to the OWNER.
The letter shall be signed by an officer of the company who has the authority to execute
the Cost Proposal Form.
b. Cost Proposal
Complete the Cost Proposal Form (Appendix) in its entirety.
c. Certificate of Insurance
The Proposer shall include proposed certificates of insurance with the Proposal. Such
certificates are subject to review and negotiation with Owner. Owner and Engineer
shall be listed as additional insured upon contract award.
d. Affidavits
Complete the Noncollusion Affidavit.
Complete the Contractor Affidavit and Agreement.
Complete the SAVE Affidavit.
e. Contractor's License
Enclose a copy of the Contractor's License and the Utility Manager's Certification.
City of Gray, GA 4

Section 2 - General Instructions
f. References
PROPONENTS shall present a list of similar projects that have been completed
within the previous seven (7) years. The list shall contain a minimum of five (5)
projects completed equal to or greater in size and complexity specified herein. If less
than five (5) projects, so state and give reasons why. Provide the address and Owner
contact information and the installation date for each installation.
City of Gray, GA 5

Section 3 - General Terms and Conditions
Section 3 General Terms and Conditions
3.1 Examination of RFP Document and Site
The Contractor shall thoroughly examine the RFP document to ensure that it understands
the scope of services to be provided. Any discrepancies, errors, or conflicts shall be brought
to the attention of the Engineer immediately.
3.2 Compliance with the RFP
Proposals must be in strict compliance with this RFP. Failure to comply with all provisions
of the RFP may result in disqualification.
3.3 Interpretations and Addenda
If a Proposer discovers any ambiguity, conflict, discrepancy, omission, or other error in the
RFP or any document attached to, incorporated into or referenced by the RFP, they shall
immediately notify the Engineer of such error in writing and request modification or
clarification of the document as outlined herein. Requests for Information (RFI's) shall be
submitted in writing via email to Cheyenne Morgan at c.morgan@grayga.us . If needed, an
Addendum addressing any questions will be issued.
3.4 Required Performance Outcomes/Functional Specifications
Asphaltic pavement shall meet the requirements of the State of Georgia Department of
Transportation (GDOT) Standard specifications, Articles 820; 802; 883; 828; and 882.
3.5 Payment for Completed Work
Payment will not be paid until all work has been completed and the Statutory Affidavit
included in the Appendix has been executed.
3.6 No Gratuities or Favors
CONTRACTOR shall not offer any gratuities and/or favors to any member of the OWNER
or ENGINEER. Any attempt by the CONTRACTOR to influence the selection process
shall be grounds for exclusion from the selection process.
3.7 Accurate Information
CONTRACTOR shall provide accurate information in its proposal. Any CONTRACTOR
who provides false or misleading information in their proposal shall be excluded from the
selection process.
3.8 Proposal Costs
The Owner will not be liable in any way for any costs incurred by any Proposer in the
preparation of its proposal in response to this RFP, nor for the presentation of its proposal
and/or participation in any discussions or negotiations.
City of Gray, GA 6

Section 3 - General Terms and Conditions
3.9 Termination of Project
The OWNER reserves the right to cancel this project at any time without cause.
Cancellation of the project by the OWNER after the CONTRACTOR has been issued a
purchase order by the OWNER will be subject to any costs incurred by the CONTRACTOR
for work completed up to the date of cancellation.
3.10 Confidentiality
All proposals shall be held confidential to the extent allowable by law until after the
selection process is complete.
3.11 OWNER and ENGINEER Rights
Owner reserves the right to reject any or all Proposals, to waive informalities and to re-
advertise, including without limitation, the rights to reject any or all nonconforming,
nonresponsive, unbalanced or conditional Proposals and to reject the Proposals of any
Proposer if Owner believes that it would not be in the best interest of the Project to make an
award to that Proposer, whether because the Proposal is not responsive or the Proposer is
unqualified or of doubtful financial ability or fails to meet any other pertinent standard or
criteria established by the Owner.
The Owner and Engineer reserve the right to evaluate the qualifications submitted; waive
any irregularities therein; request more detailed information; request clarifications or
corrections to proposals, accept any submittal or portion of a submittal; and/or reject any or
all proposals should it be in the best interest of the Owner.
3.12 Acceptance of Proposals
The Owner may accept proposals that are submitted properly and are not rejected for any
reason. However, the Owner reserves the right to request clarifications or corrections to
proposals.
3.13 Validity of Proposals
All proposals shall be valid for a period of 60 days from submission except as provided by
State Law.
3.14 Proposer Responsibilities
The Proposer will be required to follow contract requirements in accordance with all
conditions of the Contract (Purchase Order), provide a responsible project manager, assign
qualified persons to the work, provide the equipment required to do the assigned task or
accomplish the work, maintain records of expenditures, deliverables and progress, submit
required reports on schedule, maintain compliance with required permits, and maintain a
clear line of communication for prompt resolution of problems.
City of Gray, GA 7

Section 3 - General Terms and Conditions
3.15 Owner's Right to Research Proposer's Experience
The Owner, prior to or after receipt of the Proposer's proposal, shall have the right to
research work performed by the Proposer and to contact any and all references to obtain,
without limitation for the purpose of evaluating the Proposers qualifications, information
regardless of Proposer's performance on the listed jobs. This research effort will be
conducted by Owner personnel, and their representatives as deemed appropriate by the
Owner, which may include interviews with anyone involved with such projects.
3.16 Terms and Conditions of Contract
A contract resulting from this RFP shall be in the form of a Purchase Order. A W-9
Taxpayer Identification Number and Certification will also be required along with the
necessary Georgia Security and Immigration Compliance Act Affidavits included in the
Appendix.
3.17 Nondiscrimination
It is the policy of the Owner not to discriminate on the basis of age, race, sex, color, national
origin or disability in its hiring and employment practices, or in admission to, access to, or
operation of its programs, services and activities. With regard to all aspects of this Project,
Proposer certifies and warrants it will comply with this policy.
3.18 CONTRACTOR Guarantee
The CONTRACTOR certifies, by submission of its proposal, that neither it nor its
subcontractors is presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from participation in any transaction with a public agency
in the State of Georgia.
City of Gray, GA 8

Evaluation Factor
Cost to the Owner 60
Work days needed to complete work/Start date 20
Experience with similar projects 20

Section 4 - Proposal Evaluation and Contractor Selection
Section 4 Proposal Evaluation and Contractor
Selection
4.1. Method of Contractor Selection
The Owner is using the Competitive Sealed Proposals method of Contractor selection, in
accordance with Georgia law (OCGA 36-91-20, et seq).
Proposals will be evaluated using the criteria stated in the RFP. Once the evaluation is complete,
all responsive Proposers will be ranked from most advantageous to least advantageous to the
Owner, considering the evaluation factors stated in the RFP. Short-listing and interviews may or
may not be a part of this evaluation and ranking process. The Owner will then negotiate a
contract with the highest ranked Proposer. If a satisfactory contract cannot be agreed upon,
negotiations may be conducted, in the sole discretion of the Owner, with the second, and then the
third, and so on, ranked Proposers. If the Owner is unsuccessful in its first round of negotiations,
it may reopen negotiations with any Proposer with whom it previously negotiated. The scope of
the work may be changed during this negotiation process at the discretion of the Owner in an
effort to reduce the cost and/or to benefit the project in any manner.
An award, if made, will be made to the responsible and responsive Proposer whose proposal is
most advantageous to the Owner, taking into consideration the evaluation factors set forth in this
RFP and the referenced documents that are attached and hereby made a part of this solicitation.
When these documents are reviewed, the Proposer acknowledges he has been provided sufficient
detail to understand and respond to the Scope of Work to be provided by the Proposer to
satisfactorily provide the specified service.
4.2. Projected Timetable
This project is urgent and should be completed within thirty (30) working days of Notice to
Proceed and approval of Shop Drawings.
4.3. Proposal Evaluation Panel and Evaluation Factors
A panel appointed by the Owner will evaluate proposals. Consultants of the Owner may, at the
sole discretion of the Owner, evaluate the proposals and/or Proposers. The factors to be
considered by the panel in the evaluation of proposals are listed below.
The Owner will consider responses to the following items in its evaluation of proposals and
Proposers, listed in order of importance to the Owner in their evaluation process.
Evaluation Factor
Cost to the Owner 60
Work days needed to complete work/Start date 20
Experience with similar projects 20
City of Gray, GA 9

Appendix - Cost Proposal Form & Affidavits
Appendix
Cost Proposal Form & Affidavits
City of Gray, GA 10
Ross St, North St & Dixie Street Re-Surfacing

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract

DEPT OF DEFENSE

Bid Due: 11/18/2026

Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 11/25/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006

State Government of Georgia

Bid Due: 11/23/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047

State Government of Georgia

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.