| Location: | Federal |
|---|---|
| Posted: | Jun 10, 2025 |
| Due: | Jul 10, 2025 |
| Agency: | San Antonio Water System |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PS-00185-JP |
| Publication URL: | To access bid details, please log in. |
The San Antonio Water System (SAWS) is pursuing a Request for Qualifications (RFQs) for professional engineering services for the 2025 Water Storage Tank Rehabilitation Design Services Contract(“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with the project, which will require the scope of services to be performed by qualified professional engineering firms (Consultants). The selected professional engineering firm shall provide engineering services entailing engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, and overall project management services for the design and construction of the Project.
The services will include, but not limited to, project management and coordination, civil, structural and electrical engineering services, instrumentation and controls, surveying, permitting, subsurface utility engineering, preliminary engineering and studies, design, scheduling, cost estimating, construction management and other services as necessary for the Project.
SAWS anticipates awarding a contract to more than one Consultant as a result of this RFQ to provide professional engineering design and construction phase services for the Project. Under this contract several projects may be issued on an "as-needed" basis.
June 23, 2025 at 10:00 AM (CDT)............. Non-Mandatory Pre-Submittal Conference
June 25, 2025 by 4:00 PM (CDT)........................... Receipt of Written Questions Due
June 30 2025 by 4:00 PM (CDT)......................................... Q & A Posted to Website
July 10, 2025 by 10:00 AM (CDT)............................................................ SOQs Due
July/August 2025........................................................................... SOQs Evaluated
July/August 2025............................................................... Interviews (If necessary)
August/September 2025......................................................... Contract Negotiations
October 7, 2025............................................ SAWS Board Consideration and Award
October 2025.............................................................. Non-Selection Notices Mailed
October 2025..................................................................... Authorization to Proceed
October 2025......................................................................................... Start Work
The dates listed above are subject to change without notice.
|
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
|
|
|
Evaluation Criteria Forms - Word Version Jun. 10, 2025 Note: You must be logged in to access this document. |
|
Questions? Please contact
Janie Powell
at 210-233-2443
|
Receive Email Updates
|
Registration Agreement

With GovernmentContracts, you can:
..., and/or construction services for larger or more complex projects. Larger or more ...
DEPT OF DEFENSE
Bid Due: 6/09/2026
...engineering, design, and/or construction services for larger or more complex projects. Larger or ...
DEPT OF DEFENSE
Bid Due: 6/05/2026