Provision of Firefighter Turnout Gear

Location: Georgia
Posted: Oct 1, 2026
Due: Oct 9, 2026
Agency: Gwinnett County
Type of Government: State & Local
Category:
  • 42 - Fire Fighting, Rescue, and Safety Equipment
  • 84 - Clothing, Individual Equipment, and Insignia
Solicitation No: RP025-26 INV
Publication URL: To access bid details, please log in.
  • RP025-26 INV

    Provision of Firefighter Turnout Gear

    Buyer Contact : Diana.Turner@GwinnettCounty.com

    Opening Date : 10/09/2026 03:00 PM EST

    Virtual Bid Opening

    Addendum : RP025-26 AD2 , RP025-26 AD1 (1)

  • Attachment Preview

    August 28, 2026
    REQUEST FOR PROPOSAL
    RP025-26
    The Gwinnett County Board of Commissioners is soliciting competitive sealed proposals from qualified suppliers
    RfPo0r1 5t-h2e4 IPnvr o- vvi2s -io n of Firefighter Turnout Gear on an Annual Contract with four (4) options to renew for the
    FirDee cpoamrmtmenetns t& o Df WFiRre c aomndm eEnmtse.drgoecxncy Services.
    Proposals must be returned in a sealed container marked on the outside with the Request for Proposal number
    and Company Name. Proposals will be received until 2:50 P.M. local time on October 7, 2026, at the Gwinnett
    County Financial Services - Purchasing Division - 2nd Floor, 75 Langley Drive, Lawrenceville, Georgia 30046. Any
    proposal received after this date and time will not be accepted. Proposals will be publicly opened and only names
    of submitting suppliers will be read at 3:00 P.M. The opening will be virtual ONLY. To access the opening virtually,
    click here or dial +1 323-676-6170 and enter conference ID 915 995 558#. A list of suppliers submitting proposals
    will be available the following business day on our website www.gwinnettcounty.com.
    A pre-proposal conference is scheduled for 10:00 A.M. local time on September 23, 2026, at Gwinnett County
    Fire and Emergency Services Headquarters, 408 Hurricane Shoals Road, Lawrenceville, GA 30046. Fittings will
    be conducted at pre-proposal conference. All suppliers are urged to attend. Questions regarding proposals
    should be directed to Diana Turner, Purchasing Associate II, at Diana.Turner@GwinnettCounty.com no later than
    3:00 P.M. local time on September 28, 2026. Proposals are legal and binding upon the supplier when submitted.
    One (1) unbound single-sided original, five (5) exact bound copies, and one (1) electronic copy on a USB flash
    drive should be submitted.
    A fitting session will be conducted following the pre-proposal conference. Further information and instructions
    are included within the specifications.
    Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or
    activities. Any requests for reasonable accommodations required by individuals to fully participate in any open
    meeting, program or activity of Gwinnett County Government should be directed to the ADA Coordinator at the
    Gwinnett County Justice and Administration Center, 770-822-8165.
    The written proposal documents supersede any verbal or written prior communications between the parties.
    Selection criteria are outlined in the request for proposal documents. Gwinnett County reserves the right to
    reject any or all proposals, to waive technicalities, and to make an award deemed in its best interest.
    Award notification will be posted after award on the County website, www.gwinnettcounty.com, and suppliers
    submitting a proposal will be notified via email.
    We look forward to your proposal and appreciate your interest in Gwinnett County.
    Diana Turner
    Purchasing Associate II
    The following pages should be returned as part of your proposal package:
    Delivery ARO Response, Pages 17-18
    Supplier Information, Page 19
    References, Page 20
    Code of Ethics, Page 26
    Contractor Affidavit and Agreement, Page 27

    RP025-26 Page 2
    I. GENERAL
    A. Scope
    The Gwinnett County Board of Commissioners (The County) is seeking proposals from qualified
    suppliers for the provision of protective clothing worn by Firefighters engaged in fire suppression
    activities. It is the intent of this Request for Proposal (RFP) to select a supplier that delivers the
    best overall value to The County, considering the evaluation factors in this RFP by demonstrating
    best performance, guaranteed availability and delivery, customer service excellence,
    accountability, knowledge, experience and cost. The protective clothing will be evaluated by users
    in live-fire scenarios and other activities related to job tasks detailed in attachment A.
    B. Adherence to Specifications
    The specifications set forth in this proposal are not designed to be restrictive. However, these
    specifications should be used to guide suppliers through the process of selecting and proposing
    turnout gear that will best suit the County needs. Statements using "must," "will," or "shall" are
    non-negotiable and failure to comply with these requirements may result in a low score given in
    the "Understanding and Adherence to Specifications" portion of scoring criteria. All exceptions to
    specifications must be clearly spelled out in the proposal submission.
    II. PRICING
    A. Prices shall remain firm for 12 months after award. This contract has four (4) optional renewals.
    Renewal of this contract will be based on the following: 1) terms, conditions and pricing remain
    the same (or as indicated in the original pricing schedule); 2) service is satisfactory; 3) both
    parties are willing to renew; and 4) Board of Commissioners' approval, if required.
    III. AWARD
    A. Recommendation to award the highest scoring supplier will be submitted to the Gwinnett County
    Board of Commissioners at the completion of the evaluation process. Contract to begin upon
    award.
    B. Awarded supplier must deliver a complete fitter line by the contract effective date to the user
    department. Fitter line must be clearly marked with "RP025-26 Fitter Line" and include a packing
    slip of garments in the shipment. Shipped to:
    Gwinnett County Department of Fire and Emergency Services
    450 Hosea Rd
    Lawrenceville GA 30046
    C. Requirements of Successful Supplier After Award
    1. It is the intention of the County to place an order upon award of this contract. This gear is
    required to replace the County's safety stock and replacement of our fitter line and
    recruits; therefore, the successful supplier will be required to provide gear no more than
    30 days after receipt of the purchase order. The purchase order will be for gear with
    common sizes and sizes will be specified at the time of order.
    2. The manufacturer should have in place a computer-maintained traceability program that
    provides for the assignment of a production control number for each garment. The
    traceability program should be capable of tracing the garment through production, from
    the bolts of cloth used in all three layers of the garment composite construction, to the
    assignment of the garment to the individual firefighter. This production control number
    should be visibly located on the garment label and on other protected areas of garment.

    RP025-26 Page 3
    3. To ensure a perfect fit, sizing should be based on actual measurements taken of the
    firefighter by a trained measurement specialist, or sizing try-ons, or both. Fittings/sizing
    measurements are to be provided during normal business hours of 8:00 a.m. - 5:00 p.m.,
    Monday-Friday at designated location (Resource Management Warehouse: 450 Hosea Rd,
    Lawrenceville GA 30046 or Fire Academy: 3608 Braselton Hwy, Dacula, GA 30019). The
    successful supplier should be responsible for measuring Gwinnett County employees for
    proper fit as required per department and maintain record for each employee fitted
    regardless of order quantity or total price. The successful supplier should also train
    Resource Management personnel in the proper method for measuring Gwinnett County
    employees for proper fit as required per department.
    IV. PROPOSAL SUBMITTAL INSTRUCTIONS
    A. Suppliers are invited to submit their latest design that meets or exceeds these specifications.
    B. Suppliers may submit more than one product, however suppliers must have a separate proposal
    for each product proposed addressing criteria requested under Section VI of the RFP "Preparation
    of Proposals". All samples submitted are at NO cost to The County. Samples must be submitted
    for each product proposed.
    V. FITTINGS/SAMPLES
    A. Suppliers will provide samples according to sizing obtained at the pre-proposal conference.
    These samples will undergo tests as per Attachment A.
    B. Samples must be provided at no cost and must be sized specifically to the employee.
    C. The samples will be evaluated in real-life scenarios and may be damaged.
    D. Samples may be returned at the Supplier's expense after the evaluation is completed or the
    supplier has been eliminated from the process.
    E. The fittings process for the nine (9) samples will be conducted directly following the pre-proposal
    conference. If suppliers are unable to attend the pre-proposal conference, contact Diana Turner
    to schedule fittings. Fittings should be completed by September 25, 2026.
    F. The wear test will be done as a blind product test. Evaluators will be assigned an identifying
    number. Short-listed suppliers moving on to phase 2 will be assigned an alphabet letter when
    wear test sets are requested. The suppliers are to cover the NFPA label with a piece of fabric
    made of the same liner material labeled with the supplier alphabet assignment and assigned
    evaluator number.
    G. Short-listed proposers have 6 weeks from the date of request to deliver the nine (9) samples to
    Gwinnett County Fire & Emergency Services. Samples are to be sent separately and directly to:
    Gwinnett County Fire & Emergency Services
    ATTN: Rob Medina
    450 Hosea Road
    Lawrenceville, GA 30046.
    Failure to deliver the nine (9) samples by the close of business on the dates specified in the
    request may be cause for rejection of proposal.
    H. All samples must be submitted in sealed boxes clearly marked with the RP#, company name, and

    Approximately 25 recruits ordered twice per year Delivery ARO:
    Approximately 90 second sets of gear ordered once at the beginning of the calendar year Delivery ARO:
    Approximately 100 sets of gear to replace expirations ordered once at the beginning of the calendar year Delivery ARO:
    Replacement sets as needed Delivery ARO:

    RP025-26 Page 4
    "SAMPLES".
    I. All samples will be subject to performance exercise testing in conjunction with the use of SCBA,
    boots, helmets and gloves as may be required.
    J. Samples submitted for evaluation shall represent what the supplier is offering to The County.
    VI. PREPARATION OF PROPOSALS
    Cover Letter
    At the beginning of the proposal, provide a cover letter to include description of the supplier's history,
    and the manufacturer's facility and scope of operations
    PHASE 1: TECHNICAL EVALUATION
    A. Delivery Terms
    The manufacturer should provide a user information guide for the garments, which complies with
    user information requirements of NFPA 1970 Standard on Protective Ensembles for Structural
    and Proximity Firefighting, Work Apparel, Open-Circuit Self-Contained Breathing Apparatus
    (SCBA) for Emergency Services, and Personal Alert Safety Systems (PASS) 2025 Edition
    (hereinafter referred to as NFPA 1970). Topics should include, but not necessarily be limited to:
    pre-use information, preparation for use, inspection frequency and details, don/doff, use
    consistent with NFPA 1500 Standard on Fire Department Occupational Safety, Health, and
    Wellness Program 2021 Edition (hereinafter referred to as NFPA 1500) and NFPA 1851, Standard
    on Selection, Care, and Maintenance of Structural Fire Fighting Protective Ensembles, 2020 Edition
    (hereinafter referred to as NFPA 1851), maintenance and cleaning, and retirement and disposal
    criteria and considerations. This document should be packaged with each garment along with a
    specification summary sheet describing garment custom options, sizing and production details.
    Supplier shall state the Delivery ARO in the format below for the given ordering scenarios. Given
    quantities are estimates and could change based on County needs and the allocation/availability
    of funds. Please specify whether or not Delivery ARO will change based on the scenario and
    provide additional information as needed. Suppliers may include additional sheets in the proposal
    submission to cover this information.
    Approximately 25 recruits ordered twice per
    Delivery ARO:
    year
    Approximately 90 second sets of gear ordered
    Delivery ARO:
    once at the beginning of the calendar year
    Approximately 100 sets of gear to replace
    expirations ordered once at the beginning of Delivery ARO:
    the calendar year
    Replacement sets as needed Delivery ARO:
    B. References
    Suppliers should include a list of references as part of the proposal submission. Suppliers are
    required to demonstrate successful performance of the proposed turnout gear and customer
    service level by submitting references from three (3) user departments during the past three (3)
    years. The supplier should provide references from user departments of similar size, climates,
    with comparable number of employees, similar call type and volume.
    Name and contact numbers must be for a liaison within the respected Fire Department who has

    RP025-26 Page 5
    an intimate working knowledge of the performance and wear/tear of the proposed turnout gear.
    References should be provided as part of the initial proposal. Reference checks are part of the
    technical evaluation for all suppliers. Please ensure references are prepared to respond timely.
    C. Understanding and Adherence to Specifications
    Include a section in the proposal that demonstrates the supplier's understanding of the basic
    scope of services and performance requirements stated in the RFP. Include in this section
    information on service and FOB delivery terms.
    Scoring the composite makeup of PPE gear and the level of thermal insulation provided will be
    based on the adherence to specs and the overwhelming factor of safety. It is the County's
    preference that no materials that may contribute to a loss of protective performance over time
    and/or after exposure to heat, sweat, etc., should not be used in the construction of the PPE
    garment composite.
    Submit a comprehensive and detailed description of the proposed product. Include
    manufacturing materials, procedures, testing, specifications, diagram, drawings and/or photos.
    Describe your company's process for fitting and sizing throughout the contract period. Any
    exception or variation in construction, materials, performance, testing, or items of equipment
    between this specification and the proposal shall be detailed and submitted on a separate
    sheet(s) along with the proposal in sequence, citing page and item number. Suppliers must
    explain in detail and with full supporting data how the proposed deviation meets or exceeds the
    specifications.
    1. Gear Misc.
    i. Coat and pants shall be manufactured by the same company to ensure uniformity,
    complete protection and compatibility. NO EXCEPTIONS.
    ii. The composite sizing available will be scored. Include the available size increments
    for both men and women and detail the percentage of gradation for the proposed
    product.
    iii. This request for proposal defines the minimum requirements for blood borne
    pathogen resistant (BPR) firefighter personal protective equipment (PPE) to provide
    limited protection to fire fighters against adverse environmental effects during
    structural firefighting operations and certain other emergency operations where there
    is a threat of fire or where certain physical hazards are likely to be encountered, such
    as during non-fire-related rescue operations, emergency medical operations, and
    victim extraction, as defined by NFPA 1970. In the absence of comment on a particular
    point, industry standard practice should be presumed to prevail. Workmanship and
    material should be first quality throughout. Supplier must provide documentation for
    minimum THL and TPP in Coat and Pants and minimum CCHR in knees and shoulders.
    In the absence of comment to a specific point, the supplier is required to furnish a
    wholly compliant garment.
    iv. The protective gear as a set (coat & pant) shall meet the NFPA 1970. Supplier should
    include in the response the THL and TPP overall composite of the proposed gear.
    v. Protective gear shall meet NFPA 1970 Cleaning Shrinkage Resistance Test. Supplier
    should include in the response the Cleaning Shrinkage Resistance Test results.

    RP025-26 Page 6
    vi. Current NFPA standards applicable to this product specification express values for
    measurement requirements in SI (metric-based) units, followed by US (inch-pound)
    approximate equivalents in parentheses. For the convenience of the fire department,
    this product specification reverses the order and presents the more familiar US
    approximation first, followed by the SI requirement in parentheses.
    vii. Labels shall be permanently and integrally printed onto materials that meet all the
    requirements for labels of NFPA 1970. The garment shall be clearly labeled to fully
    identify the material content of all three layers: outer shell, moisture barrier and
    thermal liner.
    viii. Labels on each separable part of the garment should include a standard style
    interleaved 2 of 5 barcode containing (at a minimum) an individualized serial number
    for asset tracking purposes.
    ix. The manufacturer should furnish, free of charge, reasonable quantities of NFPA
    1970-certified thread, materials and other supplies to allow the department to manage
    its own ongoing internal maintenance efforts. Also, the manufacturer should provide
    on call at no charge, during normal business hours, a liaison for the repair department
    to assist the Fire Department on a telephone consultation basis, on all maintenance
    or repair questions that might arise. Additionally, the manufacturer should agree to
    expedite, on its own cost-only basis, all repairs that must be performed at the
    manufacturer's plant, rather than in department, over the life of the contract. All
    thread used in structural seams should be Nomex(R) or approved equivalent of
    minimum Tex size T-70. Thread should match the fabric as close as possible.
    x. Reinforcements made of Ara-Shield or approved equivalent shall be provided at cuffs,
    knees and pockets and should meet the requirements of NFPA 1970.
    a. For cuff reinforcements only: Manufacturer must provide cuff reinforcements
    made of Ara-Shield or approved equivalent material at no additional cost. If the
    purchaser specifies reinforcements made of materials other than outer shell
    material, the manufacturer should identify any additional cost for the specified
    material.
    b. For pocket reinforcements only: Ara-Shield or approved equivalent material
    must be used in the reinforcement of the pocket.
    c. For Knee reinforcements only: Ara-Shield or approved equivalent material must
    be used to reinforce knee area of pants.
    xi. Excluding where required by NFPA standard, necessary for functionality, or specifically
    called out in the custom option sections, all materials used in the construction of the
    garments should be breathable and all moisture barrier material must be as specified
    in the following materials section.
    xii. The breathability requirement includes but is not limited to collar, chinstrap, storm
    shield, fly, water wells, front coat facings and reinforcement cushioning where
    applicable.
    xiii. Areas where non-breathability is allowed (absent Custom Features specifications):
    trim, hook and loop fastening, hardware or hardware backing, and external pocketing.

    RP025-26 Page 7
    xiv. All points of stress shall be reinforced with sturdy heavy duty bar tacks or approved
    equivalent. Rivets are not acceptable because of their potential for rust and electrical
    or heat conduction.
    xv. All Hook and Loop material used for closures shall have finished edges. Unfinished
    edges will not be accepted.
    xvi. To assure maximum freedom of movement and reduced kinetic resistance, the coat
    and pants ensemble should provide comfort and mobility during EMS / firefighting
    activities and be natural shaping to promote free movement of arms and legs.
    xvii. Coat construction should be designed in an ergonomic cut to limit physiological stress
    on the wearer and so as not to interfere with movement while wearing SCBA over coat.
    xviii. Pants should follow this ergonomic cut design to not interfere with movement of legs
    while bending crawling stooping or walking during wear.
    xix. The Gwinnett County Department of Fire & Emergency Services has determined that
    the following are the preferred combinations of materials to be used which provide
    desired data on the THL, TPP, RET, and other protective measures outlined in the NFPA
    1970.
    a. Outer Shell
    Flex7 (TM) Powered by PBI with FreeFAS Durable Water Repellent (DWR) finish
    produced by TenCate Protective Fabrics: 6.9 oz/yd2, Kevlar(R)/PBI(R), Gold color
    or approved equivalent determined by department
    b. Thermal Lining
    Titanium(R) SL2 produced by TenCate Protective Fabrics: 7.7 oxy (260 gsm);
    Aramid, FR Rayon, Nylon; Woven Facecloth Quilted to Non-Woven Batting or
    approved equivalent determined by department
    c. Moisture Barrier
    Stedair 4000 produced by Stedfast Advanced Barrier Technologies; woven 3.2
    oz/yd2 meta-aramid pajama check substrate with an enhanced bi-component
    membrane or approved equivalent determined by department
    xx. If exterior pockets are specified in either the COAT CUSTOM FEATURES
    SPECIFICATIONS & PLACEMENT or in the PANT CUSTOM FEATURES
    SPECIFICATIONS & PLACEMENT section, the following requirements should apply to
    all such custom option specified exterior pockets:
    a. All pockets and flaps shall be reinforced at the top corners with heavy duty bar
    tack or approved equivalent stitching or approved equivalent.
    b. All pockets shall have enlarged tabs or rolled edge for easier grip with a gloved
    hand.
    c. All pockets shall be reinforced with an extra layer of NFPA-certified outer shell,
    moisture barrier, or other NFPA-certified reinforcement material for extra
    durability. The exact location of the reinforcements shall be identified in the
    custom features specification section(s) as indicated above.

    RP025-26 Page 8
    d. All pockets shall have a means to drain water and should have a means of
    closure.
    e. All pocket closures shall be made either with hook and loop fastener tape a
    minimum of 1.5 inches (3.8 cm) wide, with a flap, or with snaps. The specific
    placement of the closure system should be declared at the time of order.
    xxi. Particulate blocking shall be included in the construction of the Coat cuffs and cuffs
    of the pants only. The particulate blocking material shall not be included at the waist
    of the coat. Each particulate barrier shall be constructed of material that is at least
    90% efficient at blocking .1-.01-micron size particles at each interface. The closures
    on each interface should be constructed in a manner to which they will inhibit the
    products of combustion from entering into the ensemble through the coat cuffs, coat
    and pant interface and the cuffs of the pants. The installed system shall be tested to
    be compliant with NFPA 1970 for particle inward leakage testing on the entire PPE
    ensemble.
    2. Coat Custom Features Specifications & Placement
    i. The coat composite (all layers) should not gap when the firefighter is bending,
    crawling or climbing. Gapping should be determined as defined by NFPA 1500 with
    both arms fully extended overhead and wearer bending to rear, sides and front. The
    actual length of coats (shorter or longer) will be determined by each individual's torso
    length. Coat must interface properly with standard height pants.
    ii. Garments should feature a tailored ergonomic cut design throughout the outer shell,
    moisture barrier and thermal liner layers. Garments featuring alternative assembly or
    construction will be evaluated but care should be taken not to create irritation to the
    wearer while wearing an SCBA. To facilitate individual tailoring needs, the major A & B
    seams joining the one-piece back to the right and the left front body panels (outer shell
    and all interior layers) should be located at the most lateral position when the coat is
    laid flat for inspection.
    iii. Specifications as stated within this section will supersede any previous specification
    as long as the required certifications are not compromised.
    a. Coat cuffs should be reinforced with Ara-Shield or approved equivalent
    material
    b. Liner label should be configured as an inside liner pocket.
    c. Trim pattern should be Project FIRES style, Lime Yellow 2-Tone Scotchlite or
    approved equivalent. All trim shall be attached with lock stitching.
    d. An embroidered American Flag patch shall be sewn on the right shoulder with
    stars facing forward and shall be made of FR material
    e. Provide a sewn-on lettering back patch made from black Kevlar/Nomex or
    approved equivalent outer shell material with sewn on, three-inch, Lime Yellow
    Scotchlite or approved equivalent letters: "GWINNETT"

    RP025-26 Page 9
    f. Centered on the bottom rear of the coat provide a replaceable, snap attached,
    made from two layers of black Kevlar/Nomex or approved equivalent outer
    shell material. There should be four snaps, one at each corner to help secure
    the patch. Each patch should have sewn on, Lime Yellow, two-inch Scotchlite
    or approved equivalent letter: "FF LAST NAME" or "1st INITIAL + LAST NAME"
    which will be indicated at the time of order. The patch will be provided by the
    gear manufacturer.
    g. Outside storm flap closure should be by means of four evenly spaced snap
    hooks and "D" rings with the inner facings closure accomplished by use of an
    YKK or approved equivalent zipper with an oversized zipper pull.
    h. On the lower front coat facings provide outer shell material half hi bellows
    pockets that are approximately 7" H x 9" W x 1.5" D lined on all four sides with
    8-ounce Kevlar 2/1 twill. Pocket flaps should close by means of 1.5-inch hook
    and loop, full hook across the top leading edge of the pocket body with three
    vertical strips of hook and loop pile evenly spaced beneath the pocket flaps.
    Flaps should have a rolled edge or pull tab for ease of use with a gloved hand.
    On the right-hand pocket, there shall be placed a metal D-style attachment to
    clip accessories onto the pocket. The D-style metal attachment shall be
    rivetted on the bottom front corner of the pocket.
    i. Hand warmer pockets shall be provided behind each bellows pocket and lined
    with Nomex fleece or approved equivalent.
    j. There shall be an outer shell radio pocket positioned on the right chest
    approximately 9"H x 4.5" W x 3" D with the pocket flap notched towards the
    wearer's right. The radio pocket shall be divided into two segments, one
    measuring 1" wide and the other 3.5" wide. The height shall be full height of
    the pocket.
    k. Center a 0.5" H x 2.5" W outer shell mic tab above the radio pocket.
    l. On the left chest there should be a large downward facing snap hook on an
    outer shell patch which is then sewn to the coat. Place an outer shell w/hook
    and loop flashlight strap below the snap hook.
    m. On the left chest center a another 0.5"H x 2.5" W mic tab above the snap hook
    and even with the mic tab on the right chest.
    iv. A firefighter Drag Rescue Device shall be installed in each coat, which shall comply
    with the requirements of NFPA 1970. The design and functionality of the DRD of the
    proposed gear should be large enough to fit a gloved hand in the loop.
    v. Wherever garment linings are specified, including but not limited to thermal linings and
    moisture barriers, each such lining layer should be tailor-graded to fit within the overall
    garment composite of all layers without causing bunching or binding when the
    garment is worn.
    vi. The liner system should incorporate snaps at the lower right front body panel to allow
    for field inspection of the "internal" condition of the moisture barrier membrane, seam
    sealing and thermal insulating layer / quilt stitching.

    RP025-26 Page 10
    vii. The moisture barrier/thermal liner shall be completely detachable from the outer shell
    for ease of cleaning by the use of snaps. There should be a zipper down each front
    facing, snaps along the neck to interface with collar as well as snaps at each sleeve
    end. No hook and loop will be accepted in sleeve ends.
    Liner sleeves should be attached at the outer shell cuff by means of snaps on two (2)
    sets of outer shell fabric tabbing strips per cuff. These snaps should be isolated by
    the tabbing material so that they will not abrade against the outer shell. Hook and loop
    attachments will not be accepted in the cuffs of the coat.
    To provide continuous moisture protection and pathogen protection at the neck, the
    liner should be positioned so that it is sandwiched between an outer-facing pathogen
    shield and an inside facing of the specified outer shell material, both folded over and
    sewn in at the neck seam.
    The liner system design should not allow products of combustion or other
    contaminants to move into the liner interior between the moisture barrier and thermal
    liner. For instance, separately hemmed and bar tacked liner and moisture barrier with
    open edge designs would not be acceptable.
    Attachment should be by means of four (4) glove straps or zipper attachment that
    penetrates only the layer of the attachment facing towards the liner, so that metal
    contact at a wearer's neckline is completely eliminated.
    viii. The collar should be of layered construction, which meets or exceeds the minimum
    requirements set forth in the NFPA 1970. Please describe the construction of the
    proposed gear's collar in the proposal submission.
    ix. There should be no vertical or horizontal seams or stitching in the body of the collar,
    since this may weaken collar integrity. Left outside of collar should have a sewn piece
    of 3-inch x 5-inch (7.6-cm x 12.7-cm) hook and loop fastener hook tape to ensure
    maximum adjustability when engaging chinstrap-to-collar closure. Each collar should
    be graded to individual coat sizes.
    x. Chinstrap should be 8" long across the top corners, 11" long across the bottom
    corners, and a minimum 4" vertical height measured at the center. The chinstrap
    should be mounted to the collar by means to allow the chinstrap to be adjustable to
    accommodate different neck sizes and provide proper coverage.
    xi. An 80-pound (36.3 kg) tear strength hang-up loop should be provided at the interior
    collar seam. The loop should be constructed of triple layers of the specified outer shell
    material, lock stitched to the coat. Webbing is not acceptable.
    xii. To prevent stove piping, sleeves should be individually graded by coat size and sleeve
    length. For maximum freedom, sleeve design should feature extra full cut one-piece
    outer shell set-in sleeves with built-in bellows. To reduce the chances of possible top
    seam failure in that high thermal exposure area, the sleeve Major A seam should follow
    the underside of the arm and should not cross over the outside of the elbow joint.
    Sleeve seam and sleeve attachment to coat body in all layers should be 100% double
    feld and double stitched for maximum strength.

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Event ID Event Title Government Entity Start Date (ET) End Date (ET) 46700-eRFQ-002167-2027

    State Government of Georgia

    Bid Due: 11/20/2026

    Invitation to Bid The Elbert County Board of Commissioners is seeking sealed bids

    Elbert County

    Bid Due: 12/10/2026

    Bid Number: 27011 Bid Title: Old Fire Station #2 Redevelopment Category: Financial Services

    City of Gainesville

    Bid Due: 1/13/2027

    Bid Number: 027-45 Bid Title: Sheriff Uniform Supply Annual Contract - REBID Category:

    Hall County

    Bid Due: 6/27/2027

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.