August 12, 2026
INVITATION TO BID
BL119-26
The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified contractors
for the Purchase and Installation of Batting Cages at Lenora Park for the Gwinnett County Department of Parks
& Recreation.
Bids should be typed or submitted in ink and returned in a sealed container marked on the outside with the BL#
and Company Name. Bids will be received until 2:50 P.M. local time on August 28, 2026 at the Gwinnett County
Financial Services - Purchasing Division – 2nd Floor Financial Services, 75 Langley Drive, Lawrenceville, Georgia
30046. Any bid received after this date and time will not be accepted. The bid opening will be virtual ONLY. To
access
the
bid
opening,
visit
the
following
link
(https://teams.microsoft.com/meet/275271324510202?p=rGCMk4gvxdamV7dnwT) and use Meeting ID 275
271 324 510 202 and Passcode 9XC77uj3. Bids will be publicly opened and read at 3:00 P.M. Apparent bid
results will be available the following business day on the website www.gwinnettcounty.com.
A pre-bid conference is scheduled for 10:00 a.m. on August 19, 2026 at Lenora Park Baseball Complex located
at 4515 Lenora Church Rd., Snellville, GA 30058. All contractors are urged to attend. Questions regarding bids
should be directed to Jake Scarpone, Purchasing Associate II, at jake.scarpone@gwinnettcounty.com or by
calling 770-822-8722, no later than 3:00 P.M. local time on August 20, 2026. Bids are legal and binding upon
the bidder when submitted.
Successful contractor(s) will be required to meet insurance requirements. The Insurance Company should be
authorized to do business in Georgia by the Georgia Insurance Department and must have an A.M. Best rating
of A-7 or higher.
Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or
activities. Any requests for reasonable accommodations required by individuals to fully participate in any open
meeting, program or activity of Gwinnett County Government should be directed to the ADA Coordinator at the
Gwinnett County Justice and Administration Center, 770-822-8165.
The written bid documents supersede any verbal or written prior communications between the parties.
Award will be made to the supplier submitting the lowest responsive and responsible bid. Gwinnett County
reserves the right to reject any or all bids to waive technicalities and to make an award deemed in its best
interest. Bids may be split or awarded in entirety. Gwinnett County reserves the option to negotiate terms,
conditions, and pricing with the lowest responsive, responsible bidder(s) at its discretion.
Award notification will be posted after award on the County website, www.gwinnettcounty.com and companies
submitting a bid will be notified via email.
We look forward to your bid and appreciate your interest in Gwinnett County.
Jake Scarpone, CPPB
Purchasing Associate III
The following pages should be returned in duplicate as your bid:
Bid Schedule, Pages 6-7
References, Page 8
Code of Ethics, Page 9
Contractor Affidavit, Page 10
BL119-26
Page 2
SPECIFICATIONS
PURCHASE AND INSTALLATION OF BATTING CAGES AT LENORA PARK
I. SCOPE AND EXPERIENCE
1. Gwinnett County Department of Parks and Recreation is soliciting competitive bids from
qualified contractors for the installation of commercial batting cages at Lenora Park Baseball.
The successful contractor shall furnish all labor and materials required to install new batting
cage systems. Photo of Batting cage layout is attached.
2. All work MUST be completed by December 4, 2026, or an alternate date as determined by the
Gwinnett County Parks and Recreation Representative.
II.DESCRIPTION OF WORK
1. Gwinnett County shall be responsible for removing existing cage systems, clearing overgrowth,
and grading the area flat, leaving the site clear for contractor access.
2. The contractor shall furnish and install the following:
a. Four (4) batting cages measuring 65’ long x 14’ wide x 12’ tall located behind the center field
fence at Field #1.
b. All cages to be constructed using NOVA30 netting with sewn rope perimeter, 65’ length x 12’
width x 13’ height, with NOVA301.75” SQ netting, made to exact size and pulled tight with no
extra height, width, or length.
c. A door flap entry for each cage.
d. Framing systems designed for each batting cage, delivered and installed on-site.
e. Protective padding shall be BULLETJRBB black padding with Bulletz screen panels, or
approved equivalent, installed on framing.
3. Surfacing and foundation requirements:
a. Contractor shall deliver and install M10 aggregate base
b. Contractor shall deliver and install a 36 oz. 5mm padded turf in green, with a Baseball Hitting
Mat Pro Clay colored insert as designated
c. Contractor shall install a pressure treated ground rating timber wood border surrounding all
cages.
4. All work shall comply with manufacturer installation requirements and all applicable codes.
III. MATERIALS
1. The contractor shall provide the following materials:
a. NOVA30 netting, sewn rope perimeter, exact dimensions as noted
b. NOVA301.75” SQ netting
c. BULLETJRBB black padding with Bulletz screen
d. M10 aggregate base
e. 36 oz. 5mm padded turf (outdoor rated), green with Baseball Hitting Mat Pro Clay colored
hitting area
f. Wood border
i. Excavation/Subgrade: Excavate to 6’ x 6’ pressure treated timber depth; compact subgrade
to 95% Standard Proctor.
ii. Stone Base: Provide 4” compacted M10 base beneath wood border. Match turf base grade.
iii. Forms: Set true to line/grade.
BL119-26
Page 3
iv. Dimensions:
• Wood border cross-section: 6” wide x 12” deep minimum.
• Top elevation: flush with turf surface or ½” above finished turf as directed.
• Placement: Place concrete continuously; consolidate to remove voids.
• Finish: Light broom finish with ¼” radius edges.
• Turf Interface: Ensure top of wood border provides clean edge for AstroTurf termination
and anchoring.
• Curing: Apply curing compound per ASTM C309. Protect from loads for 7 days.
• Integration with Posts:
o Contractor to coordinate wood border installation with batting cage post
foundations.
o Posts shall be set in separate concrete footings (minimum 12” diameter x 36” deep,
3,500 psi concrete).
o Ensure wood border ties neatly around posts.
o All framing hardware and posts required for complete cage installation.
2. No substitutions shall be made without the prior written approval of Gwinnett County. Any
proposed substitution must be submitted with the bid package and must include specifications,
warranty, and product data for review.
IV. INSTALLATION
1. Batting cage netting and frames shall be installed to manufacturer-recommended specifications,
tensioned to exact dimensions, with no sagging or slack.
2. Padding and screens shall be securely attached to the framing and meet all applicable safety
standards.
3. Turf surfacing shall be installed over the M10 base with appropriate adhesives or fastening
systems, per manufacturer instructions. Turf seams must be secure, level, and free of wrinkles.
4. The wood border shall be installed around the perimeter of all batting cages, level and properly
anchored.
5. Contractor shall coordinate with the County for final site grading requirements to ensure a level
and properly compacted base before installation.
V. SPECIAL CONDITIONS
1. Contractor shall take all necessary precautions to protect surrounding fields, fencing, and
infrastructure during the installation.
2. Any damage caused by the contractor to adjacent structures or grounds shall be the contractor’s
responsibility to repair.
3. Contractor shall coordinate with County staff to maintain site security, safety barriers, and
access control during installation.
4. Contractor shall provide at least one employee who can effectively communicate with onsite
staff.
VI. WORK CONSTRAINTS
1. The affected area will be closed to the public, but the remainder of Lenora Park will remain open.
2. Contractor must provide temporary barricades, cones, and signage to protect park users and
staff from hazards associated with the installation.
3. Contractor shall visit the site prior to bidding to verify all measurements and site conditions. No
change orders will be accepted for incorrect measurements after contract award.
BL119-26
Page 4
4. Working hours shall be coordinated with County staff, generally 7:30 AM to 4:00 PM Monday
through Friday.
VII. GENERAL REQUIREMENTS
1. Work Site Cleanliness
a. Contractor shall maintain the work site in a clean, safe, and orderly manner throughout the
duration of the project.
b. At project completion, the contractor shall remove all tools, debris, materials, and waste from
the project site, and restore disturbed areas to their original condition.
2. Safety Precautions
a. Contractor shall implement proper fire safety and accident prevention measures.
b. Barricades and signs must meet all applicable safety codes and OSHA requirements.
c. Contractor shall notify the County immediately if conditions are discovered which present a
hazard.
3. Warranty
a. Contractor shall provide a minimum one (1) year warranty on all labor and materials. This
warranty is in addition to manufacturer warranties.
4. References
a. Contractor shall submit at least three (3) references demonstrating successful completion of
projects of similar size and scope within the past five years.
VIII. LOCATION
1. Contractors are responsible for verifying all measurements and site conditions prior to bid
submission
Lenora Park Baseball Complex
4515 Lenora Church Road
Snellville, GA 30058
BL119-26
Cage Locations and Layouts:
• Four (4) 65’ cages behind the center field fence at Field #1
Page 5
• Layout for four (4) 65’ cages behind center field fence at Field #1