| Location: | Maryland |
|---|---|
| Posted: | Jan 8, 2026 |
| Due: | Jan 27, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912DR26BA001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The USACE Baltimore District intends to solicit for an award a James Island is an ecosystem restoration project (part of the Mid-Chesapeake Bay Island Ecosystem Restoration project, commonly referred to as Mid-Bay) located in the middle Chesapeake Bay in Dorchester County, Maryland, approximately 72 miles south-southeast of the Port of Baltimore and two miles west of Hoopers Island. This contract will include the construction of multiple features at James Island that facilitate the restoration efforts: (1) Construction of dikes; and (2) dredging and stockpiling of sand materials. Dikes (approximately 10,000 linear feet): this feature will include the installation of stone, geotextile and sand materials to create a perimeter dike structure. Stone and geotextile materials will be shipped to the site and installed. Sand materials will be dredged from a local borrow area. Sand Stockpiling (approximately 3,000,000 cubic yards): this feature will include the excavation of substantial sand materials from a local borrow area with placement occurring within the newly constructed dikes (containment area) for future dike construction. The borrow area for sand material excavation (dredging) is located immediately adjacent to the construction area. All work will be performed adjacent to James Island in the Chesapeake Bay, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The magnitude of construction is between $100,000,000 and $250,000,000.00. The construction duration is approximately 1095 calendar days from the Notice to Proceed. ***Amendment 0001, dated 21 November 2025, the purpose of this amendment is to provide the correct period of performance to 540 calendar days, update clauses 52.211-12, 52.211-10 and 52.217-7, update provision 52.204-8, remove clause 52.226-1 and to include clauses 52.219-16, 52.242-5, 252.219-7000 and 252.219-7003. All other terms and conditions of the solicitation remain unchanged.****Amendment 0003 dated 18 December 2025, The purpose of this amendment is to provide clarifications from the RFI responses; 1. The Government will not be extending the RFI period for this solicitation. No further RFIs will be accepted. 2. Draft conditions for the permits were provided in Amendment 0002. The Government does not expect any substantive change in conditions between the draft language provided and the final permits. The Government will provide final permits to all bidders upon receipt, 3. CLIN 0003AK Type A Geotextile quantity changed to 10,026 SY. All other terms and conditions of this solicitation remain unchanged.******Amendment 0004, dated 22 December 2025, The purpose of this amendment is to change the bid opening date from 13 January 2026 at 1100 am (EST) to 27 January 2026 at 1100 am (EST) and to provide an updated wage determination MD20250005 dated 12 December 2025. All other terms and conditions of this solicitation remain unchanged.*****Amendment 0005, dated 07 January 2026, the purpose of this amendment is to provide the Tidal Wetlands License and Water Quality Certification and to provide updated wage determination MD20260005 dated 02 January 2026. All other terms and conditions of this solicitation remain unchanged. *****
| Sep 30, 2025 | [Presolicitation (Original)] Mid-Bay James Island Ecosystem Restoration |
| Oct 14, 2025 | [Presolicitation (Updated)] Mid-Bay James Island Ecosystem Restoration |
| Nov 12, 2025 | [Solicitation (Original)] Mid-Bay James Island Phase 1 Ecosystem Restoration |
| Nov 21, 2025 | [Solicitation (Updated)] Mid-Bay James Island Phase 1 Ecosystem Restoration |
| Dec 10, 2025 | [Solicitation (Updated)] Mid-Bay James Island Phase 1 Ecosystem Restoration |
| Jan 20, 2026 | [Solicitation (Updated)] Mid-Bay James Island Phase 1 Ecosystem Restoration |
| Feb 5, 2026 | [Solicitation (Updated)] Mid-Bay James Island Phase 1 Ecosystem Restoration |
| Feb 23, 2026 | [Solicitation (Updated)] Mid-Bay James Island Phase 1 Ecosystem Restoration |
| Mar 23, 2026 | [Award Notice (Original)] Mid Bay James Island Ph 1 Restoration |

With GovernmentContracts, you can:
Project: Harford Waste Disposal Center Landfill Gas Extraction Well and Condensate Drilling and
Maryland Environmental Service
Bid Due: 6/26/2026
Follow Portable Nitrogen Generators Active Contract Opportunity Notice ID 1301374061 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 6/08/2026
Follow Notice of Intent to Sole Source for AMERGINT softFEP-9000 renewal for annual
COMMERCE, DEPARTMENT OF
Bid Due: 6/10/2026
Follow 113th MXG Machine Maintenance Repair Services (CNC & OMAX) Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 6/05/2026