| Location: | Kentucky |
|---|---|
| Posted: | Oct 5, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | Louisville & Jefferson County Metropolitan Sewer District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 17387 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project provides for replacement-in-kind of the Muddy Fork Pump Station Generator, to be located outside the existing building on an elevated platform. The contract provides for the installation of a generator and fuel tank on an elevated platform; fabrication and installation of the platform; placement of shallow foundations; all electrical work associated with installation of the generator and associated systems; all earthwork required; selective structure demolition and disposal of demolished materials; and restoration of exterior site features associated with the work.

With GovernmentContracts, you can:
...Project: Kirby Lane Pump Station Elimination Ref. #: 17047 Type: ITB Status: Open ...
Louisville & Jefferson County Metropolitan Sewer District
Bid Due: 11/04/2026
...for replacing the existing feeder conductors from the Southwestern Pump Station (SWPS) to ...
Louisville & Jefferson County Metropolitan Sewer District
Bid Due: 11/12/2026
...feet reach. The attachment is a dual pump, priority flow hydraulic brush grinder ...
State Government of Kentucky
Bid Due: 11/04/2026
...attachment is a dual pump, priority flow hydraulic brush grinder with a 46 ...
State Government of Kentucky
Bid Due: 11/04/2026