| Location: | California |
|---|---|
| Posted: | Aug 27, 2025 |
| Due: | Sep 15, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project generally consists of the construction of an approximate 70-footlong retaining wall at MP 2.12 and an approximate 120-foot-long retaining wall at MP 2.19 on Fairfax Bolinas Road in unincorporated Fairfax. Construction will generally include the following work activities: soldier pile retaining wall with concrete lagging, tiebacks, minor concrete, shoring, temporary structures, earthwork, pier drilling, erosion and sediment control, roadway paving, striping, minor drainage improvements, traffic control, guardrail installation, and rock slope protection.
See PROJECT NO. ER-15J9(190) Fairfax Bolinas Rd Slide Repair MP 2.12 & 2.19 for full details.

With GovernmentContracts, you can:
...control, demolition, earthwork and grading, minor concrete (curbs, sidewalks, and gutters) , AC ...
City of Turlock
Bid Due: 6/17/2026
...control, demolition, earthwork and grading, minor concrete (curbs, sidewalks, and gutters) , AC ...
City of Turlock
Bid Due: 6/17/2026
...Qualifications: Class "A" - General Engineering or "C-12" - Earthwork and Paving Contractors ...
Tehachapi city
Bid Due: 6/09/2026
.... Typical work includes General Engineering, Earthwork, Landscaping, Electrical, Concrete, Paving, Plumbing...
Auburn city
Bid Due: 6/15/2026