| Location: | California |
|---|---|
| Posted: | Aug 27, 2025 |
| Due: | Sep 15, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project generally consists of the construction of an approximate 70-footlong retaining wall at MP 2.12 and an approximate 120-foot-long retaining wall at MP 2.19 on Fairfax Bolinas Road in unincorporated Fairfax. Construction will generally include the following work activities: soldier pile retaining wall with concrete lagging, tiebacks, minor concrete, shoring, temporary structures, earthwork, pier drilling, erosion and sediment control, roadway paving, striping, minor drainage improvements, traffic control, guardrail installation, and rock slope protection.
See PROJECT NO. ER-15J9(190) Fairfax Bolinas Rd Slide Repair MP 2.12 & 2.19 for full details.

With GovernmentContracts, you can:
...Basic Information Title Trash capture devices, MVPs, MGS, erosion control, and Mod lighting...
State Government of California
Bid Due: 9/17/2026
...Basic Information Title Install anchored double twisted wire mesh system and erosion control...
State Government of California
Bid Due: 8/25/2026
...Requirements; Installation and Maintenance of Erosion and Sediment Control Measures; Clearing... and Maintenance ...
Paradise Irrigation District
Bid Due: 8/28/2026
...Flood Control Agency (WSAFCA/Agency) is soliciting proposals from qualified firms or individuals... to ...
City of West Sacramento
Bid Due: 8/04/2026