| Location: | California |
|---|---|
| Posted: | Aug 27, 2025 |
| Due: | Sep 15, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project generally consists of the construction of an approximate 70-footlong retaining wall at MP 2.12 and an approximate 120-foot-long retaining wall at MP 2.19 on Fairfax Bolinas Road in unincorporated Fairfax. Construction will generally include the following work activities: soldier pile retaining wall with concrete lagging, tiebacks, minor concrete, shoring, temporary structures, earthwork, pier drilling, erosion and sediment control, roadway paving, striping, minor drainage improvements, traffic control, guardrail installation, and rock slope protection.
See PROJECT NO. ER-15J9(190) Fairfax Bolinas Rd Slide Repair MP 2.12 & 2.19 for full details.

With GovernmentContracts, you can:
...Project ID: 2026-RFB-0049 Title: Erosion Control Services Addenda: 0 Release Date: 5/14/2026 Due... ...
Sacramento County
Bid Due: 6/11/2026
..., hydroseeding, placement of erosion control measures, and reestablishment of an existing drainage ...
Contra Costa County
Bid Due: 6/09/2026
...Senior Center Parking Lot Improvement The work consists in general of mobilization, erosion... ...
City of Turlock
Bid Due: 6/17/2026
...Senior Center Parking Lot Improvement The work consists in general of mobilization, erosion... ...
City of Turlock
Bid Due: 6/17/2026