| Location: | District of Columbia |
|---|---|
| Posted: | Aug 13, 2026 |
| Due: | Sep 10, 2026 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-26-25658 |
| Publication URL: | To access bid details, please log in. |
IFB-26-25658: Reconditioning of Hydrostatic Pumps and Motors, IAD
NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide for the transportation, disassembly, inspection and reconditioning of Sauer-Dan Foss Hydrostatic Series 90 Pumps and Series 51 Motors at Washington Dulles International Airport (IAD). The support services will also include the prototyping and subsequent deliveries of a system upgrade.
Solicitation Issue Date: August 13, 2026
Due Date for Submissions: September 10, 2026
Amendments Issued: None
SLBE Requirement: None
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
...the selection of software architecture and software development tools that will be required ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 10/15/2026
.... This strategy will provide FHWA an acquisition tool with the flexibility to ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 4/01/2029
...Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide...
Metropolitan Washington Airports Authority
Bid Due: 9/22/2026
..., STRIDES Morocco also aims to digitize a risk assessment tool. This includes ...
FHI 360
Bid Due: 9/23/2026