| Location: | Missouri |
|---|---|
| Posted: | Sep 10, 2026 |
| Due: | Sep 16, 2026 |
| Agency: | HEALTH AND HUMAN SERVICES, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 75F40126Q00371 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
OPQR has a requirement to obtain an advanced dynamic light scattering detector to enhance characterization capabilities for emerging pharmaceutical products and complex biologics. For a quoter's detector to be deemed acceptable, the following salient characteristics shall be met:
3.4 Deliverables
Ref
Description
Quantities Required
Due Date
3
Quasi-Elastic Light Scattering Unit for FFF
1
120 days after award
3
Installation, instrument qualification and training
1
120 days after contract award.
Detector hardware with all necessary cables, connectors, and mounting hardware for integration with existing FFF system. Software licensing and installation files compatible with current chromatography software version. User manuals, technical specifications, and standard operating procedure templates provided in digital format via download or physical media (CD/DVD). CD, DVD and hard copies of deliverables shall not be required to be returned to the Contractor. Deliverables are delivered to the following address:
U.S Food and Drug Administration
Center for Drug Evaluation and Research / Office of Pharmaceutical Quality / Office of Pharmaceutical Quality Research
Attn: TBD
645 S Newstead Avenue
St. Louis, M0 63110
3Schedule: Delivery shall be no later than 120 days after contract award.
Vendor is responsible for coordination with FDA staff for installation and integration with existing FFF system. FDA staff will provide access to laboratory space and existing instrumentation for installation activities.
3.6 Maintenance and Technical Support: At minimum the contractor must:
Partial acceptance is made upon delivery of all the parts. Full acceptance is made after completion of Installation and Operational Qualification (IQ/OQ) by the contractor that the system meets all the specifications and requirements.
Fixed Term License: FDA shall the ability to purchase a new subscription after the original subscription expires to continue the use of the software and to gain access to technical support and product upgrades.
The period of performance is 12 months from the installation date of the system. The delivery of the entire system with accessories as outlined in the SOW should be completed within 120 days of award. Instrument installation and qualification should be completed within 120 days of award. Instrument familiarization and training should be completed on the day of installation.
None
The order type is firm-fixed-price.

With GovernmentContracts, you can:
...Digital ID can take up to five business days, and it is highly ...
Great Rivers Greenway
Bid Due: 9/24/2026
..., Missouri. To obtain DIGITAL Plans and Specifications, please log on to www.amce.com ...
City of Joplin
Bid Due: 9/17/2026
...-refundable $25 charge. Processing your Digital ID can take up to five business ...
Great Rivers Greenway
Bid Due: 9/24/2026
...S. 4th Street , Ste. Genevieve , MO 63670 Complete digital project bidding ...
Missouri Department of Transportation(MDOT)
Bid Due: 10/07/2026