| Location: | California |
|---|---|
| Posted: | Jul 22, 2026 |
| Due: | Aug 4, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CASS AND EL DORADO STREET CURB RAMP AND ROAD REHABILITATION (CIP2604C)
Addenda: 3
Release Date: 6/3/2026
Due Date: 8/4/2026
In general, the work consists of, but is not limited to, the demolition, earthwork, and construction for concrete curbs, gutters, sidewalks, driveways, ADA-compliant curb ramps, pavement, and storm drainage improvements. Pavement rehabilitation work includes milling, the placement of hot mix asphalt (HMA), rubberized hot mix asphalt (RHMA-G), stress absorbing membrane interlayer (SAMI), the application of pavement seal coats, and Class 2 Aggregate Base, per plan. Additional improvements include the installation of street lighting, electrical, permanent signage, striping, and curb painting, as well as the adjustment of utility structures to grade and the implementation of all required stormwater protection and traffic control measures.

With GovernmentContracts, you can:
...Evaluators (IEs) qualified to review and assess electrical corporation implementation... of their approved ...
State Government of California
Bid Due: 11/02/2026
...Follow P283 Electrical Infrastructure, On-Site Generation, and Microgrid Improvements at Marine..., testing, and ...
DEPT OF DEFENSE
Bid Due: 10/14/2026
...includes all associated mechanical, electrical, plumbing, structural, controls, and roofing work required... adapters, ...
Lynwood Unified School District
Bid Due: 10/20/2026
...Control Center RFP Issue Date: RFP Submittal Deadline: 7/31/2026 09/18/2026 Introduction The Northern..., ...
Northern California Power Agency
Bid Due: 9/18/2026