| Location: | California |
|---|---|
| Posted: | Jul 22, 2026 |
| Due: | Aug 4, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CASS AND EL DORADO STREET CURB RAMP AND ROAD REHABILITATION (CIP2604C)
Addenda: 3
Release Date: 6/3/2026
Due Date: 8/4/2026
In general, the work consists of, but is not limited to, the demolition, earthwork, and construction for concrete curbs, gutters, sidewalks, driveways, ADA-compliant curb ramps, pavement, and storm drainage improvements. Pavement rehabilitation work includes milling, the placement of hot mix asphalt (HMA), rubberized hot mix asphalt (RHMA-G), stress absorbing membrane interlayer (SAMI), the application of pavement seal coats, and Class 2 Aggregate Base, per plan. Additional improvements include the installation of street lighting, electrical, permanent signage, striping, and curb painting, as well as the adjustment of utility structures to grade and the implementation of all required stormwater protection and traffic control measures.

With GovernmentContracts, you can:
...where technically feasible rather than perform unnecessary demolition or complete replacement... retrofit solutions ...
DEPT OF DEFENSE
Bid Due: 10/08/2026
...District Water Reclamation Facility. The Work includes, but is not limited to, demolition ...
Valley Sanitary District
Bid Due: 10/08/2026
...of demolition, excavation, trenching, installation of electrical conduit, backfill, fencing, cast in place... ...
State Government of California
Bid Due: 10/20/2026