| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 25, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | Pittsburgh Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2023-100-106-2 (2025-156) |
| Publication URL: | To access bid details, please log in. |
Project Description: Pittsburgh Water is requesting bids for a full structural rehabilitation of the Clarified Water Conduit with Carbon Fiber Reinforced Polymer (CFRP) which includes the installation of isolation gates on the upstream of the Clarified Water Conduit within the clarifier flume, the replacement of the 84-in butterfly bypass valve, and the installation of slide gates within the Filter Influent Structure on the downstream of the Clarified Water Conduit.

With GovernmentContracts, you can:
Header Information Bid Number: B2627212 Description: OEM Water Bid Opening Date: 10/31/2026 11:59:00
City of Philadelphia
Bid Due: 10/31/2026
Header Information Bid Number: B2626551 Description: 6x4 CNG Truck with 20HD Compactor Body
City of Philadelphia
Bid Due: 10/07/2026
Project: Parking Garage Development & Elevated Pedestrian Walkway Ref. #: Lehigh-Northampton Airport Authority,
PennBid
Bid Due: 10/07/2026
Project: Main Pump House and Dewatering Improvements Ref. #: Lehigh County Authority, PA
PennBid
Bid Due: 10/16/2026