| Location: | Federal |
|---|---|
| Posted: | Apr 14, 2026 |
| Due: | Apr 29, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912WJ26QA086 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THE WORK CONSISTS OF:
Furnish all materials, equipment, and labor necessary to apply a systematic aquatic herbicide to control Fanwort, Eurasian Milfoil, and Spiny Naiad in approximately 24.24 acres of Buffumville Lake. Charlton, MA. Granular Fluridone shall be the herbicide used to treat approximately 21.52 acres of Fanwort, split between two applications. Liquid Diquat Dibromide shall be the herbicide used to treat Spiny Naiad one time at the south end of the lake totaling approximately 2.72 acres. Furnish all labor and equipment necessary to conduct a full lake comprehensive invasive plant species survey with a detailed final report.
In addition, furnish all materials, equipment, and labor necessary to conduct a partial river, all inclusive, invasive aquatic plant species survey on approximately 3.3 river miles of the French River, from Greenbriar Park to Hodges Village Dam, Oxford, MA, as well as hand removal of all Water Chestnut found. A final comprehensive report and maps of the presence of all aquatic invasive plant species will be submitted.
This procurement is set-aside for small business vendors. The applicable NAICS code is 541990 with a Small Business Size Standard of $19.5 Million.
ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
| Mar 27, 2026 | [Presolicitation (Original)] Control of Aquatic Invasive Plant Species and Aquatic Surveys, Buffumville Lake, Charlton, MA and Hodges Village Dam, Oxford, MA |
| Apr 24, 2026 | [Solicitation (Updated)] Control of Aquatic Invasive Plant Species and Aquatic Surveys, Buffumville Lake, Charlton, MA and Hodges Village Dam, Oxford, MA |
| May 8, 2026 | [Award Notice (Original)] Control of Aquatic Invasive Plant Species and Aquatic Surveys, Buffumville Lake, Charlton, MA and Hodges Village Dam, Oxford, MA |

With GovernmentContracts, you can:
...San Antonio Water System Central Cooling Plant Open House Tour June 17, 2026 ...
San Antonio Water System
Bid Due: 6/16/2026
...automation, controls, and instrumentation to optimize plant operation and performance Associated site... filter ...
San Antonio Water System
Bid Due: 8/03/2026
...for pH Control and Nutrient Recycling (KSC-TOPS-94) Active Contract Opportunity Notice ID T2P-KSC... ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 7/17/2026
...Digital Instrumentation and Control Systems in Nuclear Power Plants Attachments/Links Contact...
NUCLEAR REGULATORY COMMISSION
Bid Due: 7/06/2026