| Location: | Alabama |
|---|---|
| Posted: | Sep 8, 2026 |
| Due: | Sep 16, 2026 |
| Agency: | City of Tuscaloosa |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Name | End Date | Issued By |
|
Bid - Woolsey Finnell Bridge Utility Relocation Const OCA-25-1145 |
September 16, 2026, 2:00 PM | Water and Sewer Department |
CITY OF TUSCALOOSA
ADVERTISEMENT FOR BIDS
Project Name: Utility Relocation for ALDOT Project No. DEMOF-RPF-NHF-PRF-A210(943)
Woolsey Finnell Bridge Replacement and Approach on SR-6 (US-82) over the Black Warrior
River, City of Tuscaloosa, Alabama
File Number:OCA-25-1145 Engineering Project Number: 2024.729.001
Sealed Bid Proposals will be received by the City of Tuscaloosa, at the Council Chamber of City
Hall, 2201 University Boulevard, on September 16, 2026, at 2:00 p.m., local time for this project,
at which time bids will be opened and read.
Pre-Bid Conference: Attendance at the MANDATORY Pre-Bid Conference is required in order for
a General Contractor to submit a bid on this Project. The Pre-Bid Conference will be held at the
Council Chamber of City Hall, 2201 University Boulevard, on September 9, 2026, at 2:00 p.m.,
local time. Parking and Entry to City Hall: Free visitor parking is provided in the Intermodal Facility
(parking deck) at 2230 7th Street. Access City Hall through the 4th-floor skywalk entrance to
Security.
Project Scope: Utility relocation of existing water and sanitary sewer including approximately
4,238 linear feet of water main (2-inch to 36-inch), 292 linear feet of water main flex ring (24-
inch), 2,557 linear feet of water main carrier pipe (8-inch to 36-inch), 1,920 linear feet of water
main jack and bore (16-inch to 48-inch encasement), 146 linear feet of water main open cut (30-
inch encasement), 11 valves, control valve assembly, 774 linear feet of gravity sewer main (8-inch
to 18-inch), 264 linear feet of sewer force main (16-inch), 324 linear feet of gravity sewer pipe
flex ring (18-inch), 978 linear feet of sewer main carrier pipe (8-inch to 18-inch), 867 linear feet
of sewer main jack and bore (16-inch to 30-inch encasement), 131 vertical linear feet of precast
concrete manhole (48-inch), 220 square yards of asphalt patching, pipe bridge, wastewater flow
control, landscaping, and miscellaneous appurtenances necessary to complete the work.
Award of the contract will be made within sixty (60) calendar days from the date of the bid
opening.
Plans and Specifications: Plans and specifications and all related Contract Documents are open
for public inspection at the office of the Tuscaloosa Sewer Department at the Hillard N. Fletcher
Water Resource Recovery Facility, located at 4010 Reese Phifer Avenue, Tuscaloosa, AL 35401
and plans, specifications and other elements of the contract documents may be obtained
from the office of the Engineer Hazen and Sawyer, designated as the office of the awarding
authority for this purpose, located at 1490 Northbank Parkway, Suite 240, Tuscaloosa, AL 35406.
The contact person for the project is Brian Green, P.E. He can be reached at (659)202-0013 or by
email at RBGreen@hazenandsawyer.com.
Official Bid Documents can also be downloaded at www.centralbidding.com. Electronic Bids can
be submitted at www.centralbidding.com. For any questions about the electronic bidding
process, please contact Central Bidding at 225-810-4814 or support@centralbidding.com.

With GovernmentContracts, you can:
...2027 Annual Contract for Cured-In-Place Pipe Rehabilitation of Large Diameter Sanitary Sewer Mains... ...
Mobile Water Service System(MAWSS)
Bid Due: 10/05/2026
...Follow Traffic Control Devices Request For Quotation PIPE-Traffic Engineering 03500 , 09500 , ...
City of Montgomery
Bid Due: 9/17/2026
...: 9/29/2026 Follow DEMOLITION OF 1611 NORTHGATE DRIVE PIPE-Inspections 91240 Project ID: CP ...
City of Montgomery
Bid Due: 9/29/2026
...For Proposal PIPE-Planning 20885 Project ID: 2026-RFP-058 Release Date: Wednesday, August 19, 2026...
City of Montgomery
Bid Due: 9/21/2026