Request for Bid: Somerset Sidewalk Repairs

Location: Illinois
Posted: Jul 20, 2026
Due: Aug 4, 2026
Agency: Glen Carbon village
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: Request for Bid: Somerset Sidewalk Repairs
Category: Administrative Services
Status: Open
Description:

This is a Request for Bids (RFB) from the Village of Glen Carbon for removal and replacement of sidewalk panels in Somerset Subdivision.

Request for Bid: Somerset Sidewalk Repairs

1. General Information

• Issuer: Village of Glen Carbon

• Issuing Department: Street Department

• Point of Contact:

Scott Slemer, P.E. – Director of Public Works

• Site Address: Glen Carbon, Illinois

• Proposal Submission Address: 151 N. Main Street, Glen Carbon, IL 62034

• Email: For security reasons, you must enable JavaScript to view this E-mail address.

• Proposal Due Date: August 4, 2026, at 3:00 P.M.

Publication Date/Time:
7/20/2026 8:00 AM
Closing Date/Time:
8/4/2026 3:00 PM
Contact Person:
Scott Slemer at saslemer@glencarbonil.gov
Related Documents:

Attachment Preview

SOMERSET SIDEWALK REPAIRS REQUEST FOR BIDS
GLEN CARBON STREET DEPARTMENT
This is a Request for Bids (RFB) from the Village of Glen Carbon for removal and
replacement of sidewalk panels in Somerset Subdivision.
Request for Bid: Somerset Sidewalk Repairs
1. General Information
* Issuer: Village of Glen Carbon
* Issuing Department: Street Department
* Point of Contact:
Scott Slemer, P.E. - Director of Public Works
* Site Address: Glen Carbon, Illinois
* Proposal Submission Address: 151 N. Main Street, Glen Carbon, IL 62034
* Email: saslemer@glencarbonil.gov
* Proposal Due Date: August 4, 2026, at 3:00 P.M.
2. Introduction
The Village of Glen Carbon is committed to preserving and maintaining its street
infrastructure and seeks proposals from qualified and licensed contractors to remove and
replace miscellaneous sidewalk panels found within the Somerset Subdivision. The
selected contractor will ensure that the sidewalks are removed with minimal damage to
surrounding property and that replaced panels meet ADA guidelines.
3. Scope of Work
The successful proposer shall furnish all labor, equipment, tools, parts, and materials
required to perform the following services. All work must be completed prior to December
1, 2026.
3.1. Initial Assessment and Site Visit
An initial site visit is recommended for all interested vendors to evaluate the extent of the
1 | Page

project. The site visit should be completed by July 28, 2026, schedule it with
Operations Manager, Steve Kalert at skalert@glencarbonil.gov or (618) 288-2663.
* Confirmation of approximate square footage of areas as listed below:
113 Somerset 4'x22' 88 SF
116 Somerset 4'x12' 48 SF
128 Somerset 4'x19' 76 SF
136 Somerset 4'x6' 24 SF
141 Somerset 4'x5' 20 SF
148 Somerset 4'x10' 40 SF
10 Bristol Ct 4'x18' 72 SF
164 Somerset 4'x12' 48 SF
172 Somerset 4'x24' 96 SF
181 Somerset 4'x13' 52 SF
184 Somerset 4'x9' 36 SF
23 Rose Ct 4'x8' 32 SF
19 Rose Ct 4'x14' 56 SF
15 Rose Ct 4'x15' 60 SF
9 Rose Ct 4'x5' 20 SF
5 Rose Ct 4'x18' 72 SF
22 Rose Ct 4'x8' 32 SF
26 Rose Ct 4'x12' 48 SF
30 Rose Ct 4'x8' 32 SF
27 Rose Ct 4'x20' 80 SF
34 Rose Ct 4'x28' 112 SF
207 Somerset 4'x8' 32 SF
212 Somerset 4'x8' 32 SF
2801 Bristol Way ADA Ramp 25 SF
2808 Bristol Way 4'x6' 24 SF
2812 Bristol Way 4'x5' 20 SF
2816 Bristol Way 4'x5' 20 SF
2819 Bristol Way 4'x12' 48 SF
2901 Bristol Way 4'x8' 32 SF
115 Walden 4'x10' 40 SF
119 Walden 4'x16' 64 SF
123 Walden 4'x11' 44 SF
127 Walden (Inc Apron) 4'x20' 80 SF
136 Walden 4'x7' 28 SF
140 Walden (inc Apron) 4'x14' 56 SF
116 Windover 4'x8' 32 SF
2 | Page

132 Windover 4'x8' 32 SF
Estimated Total Square Footage 1753 SF
* Review of existing condition of sidewalk.
* Identification of any extenuating circumstances.
3.2. Coordination
* Prior to beginning work in a specific location, the contractor will notify adjacent
property owners of the proposed work and request that they identify any sprinkler
lines and heads that may be in the vicinity of the sidewalk. Any lines or heads found
within the ROW will need to be relocated by the homeowner prior to sidewalk
removal.
* Sump drains or downspout pipes in the vicinity of the work will need to be relocated
by the owner prior to removal of sidewalk. The contractor will provide a letter to the
property owner regarding the requirements as provided by the village.
3.3. Traffic Control
* The contractor will provide all traffic control as necessary for the work following
Illinois Department of Transportation Standards.
* Sidewalk Closure signs will be required as appropriate.
3.4. Sidewalk Removal and Replacement
* All JULIE requirements shall be met prior to removal of sidewalk.
* Construction shall follow Section 424 of the Standard Specifications for Road and
Bridge Construction.
* Sidewalk shall be removed with minimal damage to surrounding turf and adjacent
infrastructure. Concrete saw shall be used to cut the concrete at the nearest joint.
Sidewalk shall be broken into manageable pieces and disposed of by the bidder.
* Excavated area shall be protected with orange construction fencing until sidewalk
has cured and is ready to be opened to the public for use.
3 | Page

* Subgrade shall be removed to allow for 4" of subgrade granular material to be
placed and compacted below the new sidewalk panel. Subgrade granular material
shall be compacted tightly with a plate compactor.
* Sidewalk panels shall be formed using wood or metal forms. Forms shall be set to
ensure sidewalk meets ADA compliance. Joint spacing should match existing
conditions.
* Portland cement concrete shall be used for the sidewalk with a maximum slump of
4". Concrete shall be leveled and smoothed with a light broom finish applied to the
surface.
* Any new concrete panel placed by the bidder that exceeds 2.0% cross slope will be
removed and replaced by the bidder at his/her expense. If existing panel exceeds
2.0%, contractor will match existing slopes over a 2' transition length.
* Concrete poured after November 1 shall have protective coat applied per IDOT
specifications.
3.5. Site Refurbishment
* Once concrete has cured, adjacent property shall be backfilled with clean dirt.
* Area shall be seeded with a lawn mix and strawed for erosion control.
4. Method of Measurement
* Approximate lengths and widths of the sidewalk panels to be replaced are as listed
in Section 3.1 equaling 1753 square feet.
* Total bid price shall include the cost of all labor, materials, and equipment
necessary to provide the work as listed in Sections 3.2 through 3.5, including
coordination, removal, replacement, and disposal of materials, and site
remediation.
* Basis of bid is the Total Lump Sum Price per the areas as shown in Section 3.1. Unit
Price shall be included in bid only for pricing if additional sidewalk panels are
requested to be replaced.
4 | Page

5. Proposal Requirements
Proposals must be submitted in a sealed envelope clearly marked "RFB: Somerset
Sidewalk Repairs" and addressed to Scott Slemer, P.E., Director of Public Works.
Submissions must include:
1. Cover Letter: A brief letter expressing interest and confirming the proposer's ability
to meet all requirements.
2. Proposed Pricing: Total price to complete the work using the approved bid sheet.
3. References: A minimum of three professional references from similar or closely
related work, or IDOT prequalification.
4. Proposal Guaranty
6. Proposal Guaranty
Each proposal shall be accompanied by a bank cashier's check or a properly certified
check for not less than five percent (5%) of the bid amount.
Check's accompanying proposals shall be made payable to the Village of Glen Carbon.
The proposal guaranty checks of all, except the two lowest responsible, will be returned
promptly after the proposals have been checked, tabulated, and the relation of the
proposals established. Proposal guaranty checks of the two lowest bidders will be
returned as soon as the contract of the successful bidder has been properly executed and
approved.
7. Submission Deadline
All proposals must be received by August 4, 2026, at 3:00 P.M. turned into Village Hall
Finance Office in an envelope marked RFB: Somerset Sidewalk Repairs. Late
proposals will not be accepted. Bids will be opened and publicly read aloud on August
4, 2026, at 3 P.M. at Village Hall-151 N. Main St. Glen Carbon, IL 62034.
8. Evaluation and Award
The Village of Glen Carbon reserves the right to reject any or all proposals and to waive any
informalities. The Village intends to award the contract to the lowest responsive bid,
dependent on qualifications.
5 | Page

9. Additional Information
The Village of Glen Carbon is a municipality of the State of Illinois. A copy of the most
recently adopted Prevailing Wage ordinance is available for review on Illinois Department
of Labor Department's official website. In the performance of this contract, the contractor
is hereby put on notice that the contractor may be required to comply with the Prevailing
Wage ordinance of the Village of Glen Carbon, and it is the responsibility of the contractor
to ensure full compliance with the Prevailing Wage ordinance as may be required.
The Contractor is advised that the prevailing rate of wages may be revised by the Illinois
Department of Labor and such revisions are available on the Department's official website.
IT IS THE DUTY OF THE CONTRACTOR TO PAY PREVAILING RATE OF WAGES AS MAY BE
REVISED FROM TIME TO TIME.
That the Project Labor Agreement ("Agreement") will be used by all contractors doing
business with the Village on any construction project, except those projects that are
estimated to be less than $20,0000 or financed with Motor Fuel Tax ("MFT") funds. A copy
of the most recently adopted resolution is available for review in the office of the village
clerk.
The bid shall be awarded through a Service Contract with the contractor and Village. All
requirements of the Service Contract, including insurance requirements must be met to
proceed. If the apparent low bidder is unable to meet the requirements of the Service
Contract, the village shall offer the project to the next lowest bidder.
For any questions regarding this RFB, please contact Scott Slemer, P.E., Director of Public
Works at saslemer@glencarbonil.gov or (618) 288-2606.
6 | Page

SOMERSET SIDEWALK REPAIRS
Somerset Subd. Sidewalk Unit Price/SF Total Lump Sum Price
$_____________ $_____________________
Contractor's License No.:_______________________________ Evidence of Bidder's ability to
obtain a State Contractor's License and a covenant by Bidder to obtain said license within
the time for acceptance of bids.
Bidder accepts all of the terms and conditions of the RFB. This Bid will remail subject to
acceptance for 60 days after the bid opening, or for such longer period of time that Bider
may agree to in writing upon request of Owner.
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a Service
Contract with Owner in the form included in the RFB to perform all work as specified or
indicated in the RFB document for the price and within the time indicated in this Bid.
By: (Bidding Entity) ________________________________________________________________
[Signature] _________________________________________________
[Printed name] ______________________________________________
(If Bidder is a corporation, a limited liability company, a partnership, or a joint venture,
attach evidence of authority to sign.)
Attest:
[Signature] _________________________________________________
[Printed name] _____________________________________________
Title: ______________________________________________________
Submittal Date:____________________________________________
7 | Page

SERVICE CONTRACT
THIS AGREEMENT made and concluded this ____ day of ________ , 2026
between the Village of Glen Carbon acting by and through its President and Board of
Trustees, hereinafter known as Village, and ______________________ his/her executors,
administrators, successors or assigns, hereinafter known as Contractor.
WITNESSETH: That for and in consideration of the payment of and agreements
mentioned in the proposal hereto attached, the Contractor shall furnish all labor and
materials to complete the work or project which is the subject of said attachment as
described in the Contract, Bid or Proposal attached hereto and made a part hereof.
WITNESSETH: It is also understood and agreed that the attached Service Contract, Bid
or Proposal, together with all specifications contained therein and all other documents
relevant to this project, for the SOMERSET SIDEWALK REPAIRS PROJECT for
the Village of Glen Carbon, Illinois, together with all of the obligations and agreements
hereinafter set forth are all essential elements of the Agreement between the parties. In
the event that any provision hereinafter set forth conflicts with any provision contained in
the Contract, Bid or Proposal attached hereto the provisions hereinafter set forth shall
prevail. Those provisions are as follows:
1. Compensation/Payments. The Village shall pay for goods and services provided
by the Contractor pursuant to the Agreement a sum not to exceed ____________
for the proposal. Payments will be made in accordance with the Village Accounts
Payable cycle. The Village shall not be required to pay any interest or late charges on any
amount owed to Contractor.
2. INSURANCE. Before starting the work or activity which is the subject of this
agreement, (including delivering any Goods), _____________ shall procure and
maintain at its own cost and expense insurance coverage set forth below
Commercial General Liability coverage (equivalent in coverage to ISO form CG 00 01)
of not less than:
Each Occurrence Limit $1,000,000
Personal Advertising Injury Limit $1,000,000
Products/Completed Operations Aggregate $2,000,000
General Aggregate Limit $2,000,000
(other than Products/Completed Operations)
The policy must include:
A. Premises and Operations coverage with no explosions, collapse, or
underground damage exclusion (XCU).
1

B. Products and Completed Operations coverage. Subcontractor agrees to
maintain this coverage for the greater of ten (10) years following
completion of its work or the longest applicable statute of limitations and
the statue of repose during which any action may be filed against the
primary insured or additional insured.
C. Standard ISO CG 00 01 Contractual Liability coverage, or its equivalent,
and a Separation of Insureds clause. The policy shall not include an Insured
vs. Insured exclusion.
D. An Additional Insured Endorsement (ISO form CG 20 10 and CG 20
37) providing ongoing and completed operations coverage naming as
additional insured: "Village of Glen Carbon, including its officials,
employees, and authorize volunteers."
E. There shall be no exclusions for continuing or progressive losses not known
to exist prior to policy inception.
F. Coverage must be on an "occurrence" form. "Claims Made" and "Modified
Occurrence" forms are not acceptable.
G. Such coverage as is afforded by this policy for the benefit of the additional
insured(s) is primary and any other coverage maintained by such additional
insured(s) shall be non-contributing with the coverage provided under this
policy.
H. The CGL policy may not be subject to a self-insured retention (SIR) or
deductible that exceeds $10,000. Any and all SIRs must be susceptible of
being satisfied under the CGL policy through payments made by additional
insureds, co-insurers, and/or insureds other than the First Named Insured.
3. Termination. This Agreement may be terminated at any time upon the mutual
written consent of both parties with no penalty. In addition to the foregoing, the Village
may, at its sole discretion, terminate this Agreement with no penalty if: (1) Contractor
fails to provide services required pursuant to this Agreement within the time specified by
the Village, or any extension granted by same; or (2) Contractor fails to perform any of
the provisions of this Agreement.
4. Limitation of Liability. Any provision in the Agreement that limits the liability of
Contractor, whether limiting direct damages, economic damages, non-economic
damages, consequential damages or otherwise, is null and void. Furthermore, any
provision that disclaims any warranties, whether express or implied, is null and void.
The Contractor shall be liable for any damages at law or equity.
5. Taxpayer ID. The Contractor's federal employer identification number (FEIN) is
___________________.
2

6. Taxes. The Village shall not be required to pay any taxes associated with the
Agreement, and any provision requiring the Village to pay such taxes is null exempt
documents.
7. Indemnification. The Village shall not indemnify Vendor against any action, or
inaction, of the Village, its agents, employees, officers or representatives.
8. Hold Harmless and Indemnity Agreement. The Contractor agrees to save and
keep the Village of Glen Carbon, including its Officials, Agents and Employees, free and
harmless from all liability including but not limited to, losses, damages, costs, attorneys'
fees, expenses, causes of action, claims or judgments resulting from claimed injury,
death, damage to property or loss of use of property or any person or legal entity arising
out of or in any way connected with the performance of work or work to be performed
under this Contract to complete the SOMERSET SIDEWALK REPLACEMENT
PROJECT except as to the negligence of the Village of Glen Carbon or its employees as
to which this Hold Harmless and Indemnity Agreement shall not apply. The Contractor
shall indemnify the Village of Glen Carbon for any costs, expenses, judgements and
attorneys' fees paid or incurred, by or on behalf of the Village of Glen Carbon, its
Officials, Agents or Employees or by agents of the Village of Glen Carbon acting
pursuant to insurance policies or self-insurance policies provided for the benefit of the
Village of Glen Carbon.
The Contractor shall further hold harmless the Village of Glen Carbon, its Officials,
Agents and Employees from liability or claims for any injuries to or death of the
Contractor's employees or Subcontractor's employees, arising out of or in any way
connected with the work and work to be performed under this Contract, including
protection against any claim of the Contractor or Subcontractor for any payments under
any worker's compensation law or any expenses of or any payments made by any
worker's compensation insurance carrier on behalf of said Contractor or Subcontractor
and the Contractor shall indemnify the Village of Glen Carbon for any costs, expenses,
judgments and attorneys' fees with respect to any above referenced worker's
compensation claim incurred or paid by the Village of Glen Carbon or paid on its behalf
or behalf of its Officials, Agents or Employees by insurance purchased or self-insurance
provided by the Village of Glen Carbon.
In the event the Village of Glen Carbon's machinery or equipment is used by the
Contractor or any Subcontractor in the performance of the work to be performed under
this Contract, such machinery or equipment shall be considered as being under the sole
custody and control of the Contractor or Subcontractor during the period of such use by
the Contractor or Subcontractor, and if any person or persons in the employ of the Village
of Glen Carbon should be used to operate said machinery or equipment, during the period
of such use, such person or persons shall be deemed to be an employee or employees of
the Contractor of Subcontractor.
The Village of Glen Carbon is a municipality of the State of Illinois. By state statute, the
Village of Glen Carbon is required to adopt a Prevailing Wage ordinance each year. A
copy of the most recently adopted Prevailing Wage ordinance is available for review in
the office of the village clerk. In the performance of this contract, the contractor is hereby
put on notice that the contractor may be required to comply with the Prevailing Wage
3

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow 88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS-

DEPT OF DEFENSE

Bid Due: 9/16/2026

DEPARTMENT OF WATER MANAGEMENT Construction 76305 1334862 1334862: Block Level Lead Service Line

City of Chicago

Bid Due: 10/01/2026

Project: C26FI103384111 - Request for Proposals (RFP) for Construction Services for the Red

Chicago Transit Authority

Bid Due: 10/07/2026

Project: Mechanical Engineering Design Services Ref. #: 214619 Department: Purchasing Type: Other Status:

Metra Rail

Bid Due: 9/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.