| Location: | Florida |
|---|---|
| Posted: | Oct 19, 2025 |
| Due: | Oct 28, 2025 |
| Agency: | Pinellas County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0946-ITB-C |
| Publication URL: | To access bid details, please log in. |
Project ID: 25-0946-ITB-C
Title: Madonna Blvd over Pine Key Cutoff Bridge #154700 (REBID) (PID 003678A)
Addenda: 0
Release Date: 10/17/2025
Due Date: 10/28/2025
Pinellas County is replacing the Madonna Boulevard Bridge. Pinellas County is proposing a 180-foot-long bridge with three (3) equal spans of 60 feet to help improve water flow and reduce scour through the canal. The proposed bridge will have an overall width of 49-feet, 8-inches, providing two (2) 12-foot lanes, shoulders, and a 6-foot sidewalk on both sides.
The preliminary engineering report performed in 2020 determined the existing bridge, constructed in 1957, should be replaced. The study examined the condition of the bridge and scour evaluations were performed. The study found the superstructure to be in good condition due to the deck replacement in 2005; however, the 14” piles exhibit excessive section loss, and the bridge was determined scour critical. Due to the time in which the bridge was originally designed, the shear capacity of the existing concrete beams is unknown, and the bridge is functionally obsolete.

With GovernmentContracts, you can:
Follow Building 101 (B101) Component Strip Shop Repairs Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 6/11/2026
Follow USCG Base Miami Beach C5I Tower Training 2026 Active Contract Opportunity Notice
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/10/2026
Solicitation Details You can review the detailed information about the solicitation here. If
Manatee County
Bid Due: 7/07/2026
Title JSO-ISM-FARGO RENEWALS (90824) Solicitation Type ITQ Status Active Buyer Pearl Mitchell Email
City of Jacksonville
Bid Due: 6/10/2026