| Location: | Florida |
|---|---|
| Posted: | Oct 19, 2025 |
| Due: | Oct 28, 2025 |
| Agency: | Pinellas County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0946-ITB-C |
| Publication URL: | To access bid details, please log in. |
Project ID: 25-0946-ITB-C
Title: Madonna Blvd over Pine Key Cutoff Bridge #154700 (REBID) (PID 003678A)
Addenda: 0
Release Date: 10/17/2025
Due Date: 10/28/2025
Pinellas County is replacing the Madonna Boulevard Bridge. Pinellas County is proposing a 180-foot-long bridge with three (3) equal spans of 60 feet to help improve water flow and reduce scour through the canal. The proposed bridge will have an overall width of 49-feet, 8-inches, providing two (2) 12-foot lanes, shoulders, and a 6-foot sidewalk on both sides.
The preliminary engineering report performed in 2020 determined the existing bridge, constructed in 1957, should be replaced. The study examined the condition of the bridge and scour evaluations were performed. The study found the superstructure to be in good condition due to the deck replacement in 2005; however, the 14” piles exhibit excessive section loss, and the bridge was determined scour critical. Due to the time in which the bridge was originally designed, the shear capacity of the existing concrete beams is unknown, and the bridge is functionally obsolete.

With GovernmentContracts, you can:
...and are critical for controlling condenser cooling water flow, facilitating reverse-flow... Unit 3 ...
JEA
Bid Due: 7/28/2026
...Project: Van Dyke Flow Diversion (Pump Station and Pipeline) Ref. #: RPS-26-00282 Type: ...
Hillsborough County
Bid Due: 8/21/2026
...the EEP, which provides chilled water services to nearby attractions and resort facilities. ...
State Government of Florida
Bid Due: 9/18/2026
...Project: Water and Wastewater Parts, Repairs, and Maintenance Services Ref. #: SS-26-00347 Type... ...
Hillsborough County
Bid Due: 7/29/2026