Advertisement for Engineering Services Municipal Engineer Bryn Mawr Ext

Location: Pennsylvania
Posted: Aug 14, 2026
Due: Sep 8, 2026
Agency: Newtown Township
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • R - Professional, Administrative and Management Support Services
Publication URL: To access bid details, please log in.
Bid Title: Advertisement for Engineering Services Municipal Engineer Bryn Mawr Ext
Category: Bids
Status: Open
Description:

NEWTOWN TOWNSHIP

STATEMENT OF INTEREST

Engineering Consultant Services

Newtown Township Multi-Use Trail

SR 252 (S Newtown Street Road) at Troop Farm Road to SR 3 (West Chester Pike) at Bryn Mawr Avenue

via an Easement through Dunwoody Village

Delaware County, Pennsylvania

Design and easement surveys of Extension of Pedestrian and Bike trail/lanes from Route 252 (S Newtown Street Road) and Troop Farm Road to Route 3 (West Chester Pike) and Bryn Mawr Avenue through an easement on Dunwoody Village Property.

Statement of Interest Due by Tuesday September 8, 2026 2:30 PM.

Email proposal and price quotes to:

For security reasons, you must enable JavaScript to view this E-mail address. – George Sharretts, Newtown Township,

Public Works Director

Publication 93 (12-22)  |  Modified/Enhanced Modified Selection Procedures  |  Section 905, Commonwealth Procurement Code

1.   Introduction and Project Overview

Newtown Township is issuing this request to solicit a Statement of Interest (SOIs) from qualified engineering consulting firms to provide comprehensive professional services for the planning, survey, environmental review, design, and construction phase support for a new shared-use walking and bicycle trail in Newtown Township, Delaware County, Pennsylvania.  This project is being funded under TIP funding and will need to follow all Penn DOT Policies and Procedures.

1.1  Project Description

The project consists of the full development of a shared-use path (walking and bicycling) extending from the intersection of State Route 252 (S Newtown Street Road) at Troop Farm Road to SR Route 3 (West Chester Pike) at Bryn Mawr Avenue in Newtown Township. The corridor passes through an easement on the grounds of Dunwoody Village, a continuing care retirement community located at 3500 West Chester Pike, Newtown Square, PA 19073.

The trail is intended to provide a safe, accessible, non-motorized transportation and recreation corridor connecting existing and planned pedestrian and bicycle facilities along SR 252 (S Newtown Street Road) and SR 3 (West Chester Pike). The project will serve residents of Newtown Township and the broader Delaware County active transportation network.

1.2  Key Project Constraints
  • The alignment traverses an easement through Dunwoody Village. The selected consultant will be responsible for reviewing easement documents and coordinating closely with Dunwoody Village management throughout all phases of design.
  • The trail termini are at intersections with a state route (SR 252) and a state route (SR 3/West Chester Pike), requiring traffic engineering analysis and PennDOT highway occupancy coordination at both ends.
  • The corridor may pass through areas with environmental sensitivities including wetlands, floodplain, mature tree canopy, and stormwater management requirements under Chapter 105 and Chapter 102 regulations.
  • The trail must meet ADA accessibility standards and AASHTO guidelines for shared-use paths throughout its length.
  • Coordination with SEPTA and adjacent land uses along the corridor will be required.

1.3  Governing Procedures

This SOI is issued under Modified/Enhanced Modified Selection Procedures as defined in Publication 93 (12-22), Chapter 2. The procurement is governed by Section 905 of the Commonwealth Procurement Code.

1.4  Question and Submittals

All questions and Submittal will be submitted through email to For security reasons, you must enable JavaScript to view this E-mail address. .  All questions and answers will be posted on the Townships Website on the Current Bids and RFP page.  All questions must be submitted by Wednesday August 26, 2026.  All answers will be posted by September 1, 2026.     All submittals need to be submitted by email no later than 2:30 PM on September 8, 2026.

2.   Scope of Work

The following tasks represent the anticipated scope of professional services. This section provides a summary for SOI preparation purposes.  The project will be broken into three parts; the Preliminary Design, Final Design (including Construction Letting) and Construction Management.  The tasks include but are not limited to as follows:

2.1  Task 1 — Project Management and Coordination
  • Develop and maintain a project schedule.
  • Conduct and document regular project status meetings with Newtown Township and as needed with the PennDOT District Project Manager.
  • Coordinate with Dunwoody Village management and legal counsel regarding easement conditions, access, and phased construction activities.
  • Coordinate with adjacent property owners, for any additional easement requirements, design and construction activities as well as with municipal officials from Newtown Township, Delaware County Planning Department, and utility companies.
  • Prepare and maintain a project communication plan.

2.2  Task 2 — Survey and Mapping
  • Conduct a topographic survey of the full project corridor including both trail termini and all easement areas.
  • Establish horizontal and vertical control consistent with PennDOT survey requirements.
  • Prepare base mapping at appropriate scale for design.
  • Locate all utilities within the project corridor. Coordinate with utility companies for field verification.
  • Prepare an existing conditions plan and profile sheets.
2.3  Task 3 — Environmental Review and Permitting
  • Conduct environmental screening and prepare appropriate NEPA documentation (Categorical Exclusion or equivalent) in coordination with the PennDOT District Environmental Manager.
  • Conduct Section 106 cultural resources review in coordination with SHPO.
  • Evaluate Section 4(f) and Section 6(f) applicability.
  • Conduct wetlands delineation and prepare Chapter 105 permit application if wetland impacts are identified.
  • Prepare NPDES/Chapter 102 Erosion and Sediment Control permit application.
  • Identify floodplain impacts and coordinate with FEMA and Township floodplain administrator as needed.
  • Review and document environmental commitments.

2.4  Task 4 — Geotechnical Investigation
  • Perform subsurface investigation along the trail corridor as warranted by site conditions.
  • Prepare geotechnical report with recommendations for pavement design, drainage structures, retaining walls, and any areas of poor soils.
  • Coordinate with PennDOT District Geotechnical Engineer for review and approval.

2.5  Task 5 — Easement and Right-of-Way Plans
  • Review existing easement documents for the Dunwoody Village corridor and identify any conditions or restrictions affecting trail design.
  • Prepare right-of-way and easement exhibit plans for any additional temporary construction easements or permanent easements required beyond the existing easement limits.
  • Coordinate with the Township.
  • Prepare property descriptions and exhibits as required.

2.6  Task 6 — Preliminary Design
  • Evaluate trail alignment alternatives within the easement corridor, considering grades, drainage, tree preservation, and constructability.
  • Recommend preferred alignment and typical sections for PennDOT and easement holder concurrence.
  • Prepare preliminary plan and profile sheets.
  • Design terminal intersections at SR 252/Troop Farm Road and SR 3/Bryn Mawr Avenue, including pedestrian signals, crosswalk markings, ADA curb ramps, and signing.
  • Prepare preliminary drainage design and stormwater management concept.

2.7  Task 7 — Final Design
  • Incorporate Township and PennDOT review comments from preliminary design submission.
  • Prepare complete plan and profile sheets, cross-sections, drainage plans, and detail sheets per PennDOT standards.
  • Design trail pavement structure, edge treatments, drainage appurtenances, fencing, signage, and pavement markings per AASHTO and PennDOT guidelines.
  • Design ADA-compliant features throughout, including rest areas and accessible connections at termini.
  • Prepare final stormwater management plans and supporting calculations.
  • Prepare utility relocation plans and coordinate with utility companies.
  • Prepare highway occupancy permit support materials for SR 252 and SR 3 crossing/connection points.
  • Prepare construction staging and traffic control plans.
  • Prepare final construction cost estimate.
  • Prepare final bid-ready PS&E documents for Project Construction letting.

2.8  Task 8 — Construction Phase Services
  • Provide shop drawing and submittal review.
  • Respond to requests for information (RFIs) and contractor inquiries.
  • Attend pre-construction meeting and periodic site visits as directed by the Township Project Manager.
  • Prepare design change documents as needed during construction.
  • Provide record drawing support at project completion.

3.  Statement of Interest (SOI) Requirements

Newtown Township is accepting competitive price proposals from civil engineers to produce land surveys for permanent easements necessary to construct and maintain the Bryn Mawr Avenue Trail Extension and produce a Statement of Interests that provides a fair evaluation of candidates based on price of itemized services, qualifications of service providers and quality references from previous work.

It is anticipated that the successful design team will provide a competitive bid for the project and 3 examples of SOIs from projects of a similar size and scope of work. The successful respondent will be identified by a combination of: 1) price for outlined items; 2) schedule of work; and 3) quality of work submitted with price quote.

3.1  General Requirements
  • SOIs must be submitted electronically through email.
  • All attachments must be in PDF format.
  • Resumes included with the SOI must be targeted to this advertisement, identifying project-specific individuals at the manager or technical expert level relevant to trail design, environmental services, surveying, and easement coordination.
  • The SOI must identify the complete proposed consultant team, including all subconsultants and their roles.
  • Any firm visiting the site needs to be respectful of private property by not trespassing, etc.

3.2  Required Content — Selection Criteria Responses

The SOI must directly address each of the five (5) selection criteria listed in Section 4 of this SOI. Responses should be specific and project-relevant. Generic or boilerplate language that does not directly address the criteria for this project will be evaluated accordingly.

3.3  Required Content — Qualifications
  • Firm qualifications and relevant project experience for the prime consultant and all subconsultants, with emphasis on: shared-use path / trail design, easement corridor projects, environmental permitting in Delaware County and southeastern Pennsylvania, ADA-compliant pedestrian and bicycle infrastructure, and at-grade crossing design on state and US routes.
  • Resumes of key personnel proposed for this project, including at minimum: Project Manager, Lead Trail Designer, Environmental Project Manager, Survey Manager, and Traffic/Intersection Engineer.

3.4  Required Content — Project-Specific QA/QC Plan (Conceptual)

A conceptual Project-Specific QA/QC Plan must be included per Section 2.7.1 of Publication 93 (12-22). The conceptual plan should address at a project overview level:

  • Key deliverables and milestone dates
  • Key project personnel and their accountability
  • Communication plan including stakeholders (Dunwoody Village, Terrazza), easement holder, and public involvement approach
  • Decision-making and issue resolution steps
  • Quality assurance responsibilities and monitoring approach
  • Quality control procedures for design criteria, calculations, and deliverable review

4.  Selection Criteria

The Township Consultant Selection Committee (TCSC) will evaluate all responsive SOIs against the following five (5) criteria. The criteria are listed in order of importance as established by the TCSC. The TCSC will rank the top three consultants directly from the SOI submissions.

#

Criterion

Max Weight

1

What will the team do to ensure that a proper application of design principles results in cost-effective construction solutions for the trail infrastructure, applying design flexibility with consideration of the adjacent residential and commercial land uses (including Dunwoody Village), all transportation modes, and the physical constraints of the easement corridor?

30%

2

Use and experience of subconsultants, how subconsultants are planned to be incorporated into the project, and how they will be managed to ensure deliverables are timely and meet quality standards. Special consideration will be given to demonstrated experience with trail and shared-use path design, environmental permitting, and easement coordination.

25%

3

How will the team manage the design of the project and minimize future maintenance? Responses must include specific — not general — commitments to minimize scope creep and construction cost growth, including design solutions suited to the conditions.

20%

4

How will the team pursue project delivery in relation to developing and meeting design and construction project schedules, including coordination with the easement holder, adjacent property owners, utility companies, and regulatory agencies?

15%

5

How did the team perform on past projects? Provide specific examples of completed trail, shared-use path, or active transportation projects noting scope, client, schedule adherence, and any challenges on projects involving easements or third-party property coordination.

10%

6.   SOI as Technical Proposal — Requirements for the Top-Ranked Firm

Under Modified/Enhanced Modified Selection Procedures, the SOI submitted by each consultant serves as the abbreviated Technical Proposal for selection purposes. Following Final Ranking approval, the top-ranked consultant will be provided access to the published Scope of Work (SOW) in ECMS and will participate in a Scope Clarification Meeting before submitting a Price Proposal. The following requirements apply to the top-ranked firm's SOI/Technical Proposal content.

6.1  Technical Approach
  • Address the published selection criteria with project-specific responses. Because the SOI serves as the abbreviated Technical Proposal under these procedures, responses must be complete and definitive — the IO must be able to obtain all information needed for Final Ranking solely from the SOI. Generic or boilerplate language will be evaluated accordingly.
  • Identify and address the key technical challenges of this project, particularly easement coordination with Dunwoody Village, environmental permitting, ADA accessibility compliance, and at-grade intersection design at SR 252 and SR 3.

6.2  Staffing and Organization
  • Provide a project organization chart identifying prime and subconsultant roles.
  • Confirm key personnel proposed in the SOI and note any changes with justification.
  • Provide a staffing plan indicating the assignment of personnel to the anticipated project tasks described in Section 2 of this SOI.

6.3  Project Schedule
  • Provide a project schedule showing major milestones from NTP through PS&E submittal and construction phase services.
  • The schedule must reflect a realistic assessment of regulatory review timelines, easement holder coordination, and PennDOT review cycles.

6.4  Final QA/QC Plan

The final selected consultant (top-ranked firm) shall refine the conceptual QA/QC Plan submitted with the SOI into a comprehensive final Project Specific QA/QC Plan per Section 2.7.1 of Publication 93 (12-22). The final plan shall include a comprehensive schedule with milestone dates, a communication plan, specific QA/QC procedures for all deliverables, and a project team protocol.

6.5  Worker Protection and Investment Certification

All firms on the final ranked team must attach signed copies of the Worker Protection and Investment Certification Form to the SOI submission. Under Modified/Enhanced Modified procedures the SOI serves as the Technical Proposal. Failure to attach the completed form will result in a non-responsiveness determination. The Township will request Penn DOT to verify that no final ranked firm appears on the Pennsylvania Department of Labor and Industry's public list of non-compliant businesses prior to contract award.

7.   Price Proposal and Negotiation

Following Final Ranking approval and publication, the top-ranked consultant will participate in a Scope Clarification Meeting with the Township Consultant Selection Committee (TCSC). The purpose of this meeting is to establish mutual expectations for project scope, deliverables, timelines, and level of effort for each SOW task. No discussion of work-hours is permitted during the Scope Clarification Meeting. Following this meeting, the top-ranked consultant will submit a Price Proposal to the Township.

7.1  Price Proposal Content

The Price Proposal must be developed in accordance with Publication 93 (12-22), Section 3.6, and must include:

  • Work-hour estimates by task and personnel classification
  • Distribution of hours across prime and subconsultants
  • Average payroll rates by classification
  • Applicable overhead rate (office or field, as determined during Scope Clarification Meeting per Section 2.10.1 of Publication 93 (12-22))
  • Fixed fee calculation
  • Direct costs other than payroll
  • Direct costs of services and work by others
  • Project schedule and escalation factors as applicable

8.   Disqualification Provisions

The following conditions will result in disqualification of an SOI:

  • Failure to adhere to the General Requirements attached to the advertisement.
  • Submission after 4:30PM on the applicable due date.
  • Submission in a format other than PDF.
  • Any material misrepresentation in the SOI.
9.   Ethical Requirements and Conflict of Interest

This procurement is a qualification-based selection (QBS) process. The following ethical requirements apply to all parties:

  • All Township Consultant Selection Committee members who have a potential conflict of interest with any submitted firm — or whose immediate family members have such a conflict — must immediately notify the rest of the TCSC in writing and may not participate in the review.
  • A fair and impartial evaluation of all consultant submissions is a fundamental requirement of the QBS process.
  • Shortlisting and Final Ranking decisions are confidential until voted on by the Board of Supervisors.
  • Consultants must not communicate directly with the Township related to this project involving Questions and Responses forum during the active advertisement and selection period.
  • All Selection Committee members must sign documentation certifying: 'By signing this selection documentation I am certifying that neither I nor any members of my immediate family have a potential conflict of interest with any of the submitted firms.'

10.   General Conditions10.1  Right to Reject

Newtown Township and PennDOT reserve the right to reject any and all SOIs, to waive informalities, and to re-advertise the project if it is determined to be in the best interest of the Township and the Commonwealth.

10.2  Agreement Terms and Conditions

The executed agreement will incorporate by reference the following terms, conditions, and provisions, which will become legally binding upon execution:

  • Publication 442, Bureau of Design and Delivery Specifications for Consultant Agreements
  • Department's Standard Agreement Special Requirements
  • Standard Method of Payment Special Provisions (Cost Plus Fixed Fee)
  • Technical Proposal / SOI (as finalized per Modified/Enhanced Modified procedures)
  • Price Proposal (as negotiated and accepted)

10.3  Federal Aid Requirements

This project may be federally aided. If so, Federal Highway Administration (FHWA) requirements will apply, and FHWA approval may be required for specific agreement components prior to advertisement. All work must comply with applicable federal regulations including 23 CFR Part 172 (Administration of Engineering and Design Related Service Contracts).

10.4  Subconsultant Requirements

All subconsultants proposed by the prime must be ECMS Registered Business Partners. The prime consultant is responsible for all work performed by subconsultants and must ensure compliance with all terms and conditions of the agreement.

10.5  Right-of-Way Acquisition

If right-of-way acquisition services are required beyond the existing Dunwoody Village easement, such services will be procured in accordance with Section 2.2.1 of Publication 93 (12-22) and WBS Code 2.10.7. The District Right-of-Way Administrator must be involved in scoping any right-of-way acquisition tasks.

10.6  Photogrammetric Services

Any photogrammetric products or services included in the agreement require a workload analysis completed by the BODD Photogrammetry and Surveys Section (PSS) and written consent of PSS prior to CMD processing the agreement per Section 2.2.2 of Publication 93 (12-22).

Publication Date/Time:
8/14/2026 12:00 AM
Closing Date/Time:
9/8/2026 2:30 PM
Related Documents:

Attachment Preview

WEST(SC.RH.E0S0T03E)R PIKE
BRYN(MS.ARW. 1R03A2V)E
0
150'
300'
NOT FOR CONSTRUCTION
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
PROJECT
NWTPX06004
DATE
DRAWING SCALE
DRAWN BY
APPROVED BY
2023-03-22
1"=150'
RG
LB
CM1001-1
SHEET
1 OF 4
370
EXISTING
STREAM
HUNTERS RUN
INTERPRETIVE
SIGNAGE
355
STREAM
CROSSING
355
MAINTAIN 4-6%
SLOPE AND
REGRADE AS
NECESSARY.
HUNTERS RUN
INTERPRETIVE
SIGNAGE
MATCH LINE - SHEET CM1001-3
FUTURE PEDESTRIAN
CONNECTION
380
375
PROPOSED CURB BUMPOUT
WITH RAMP REPLACEMENTS
HIGH VIS
CROSSWALK (TYP.)
WEST(SC.RH.E0S0T03E)R PIKE
PROPOSED LIGHT
FIXTURE ON EXISTING
375
UTILITY POLE
WAYFINDING
SIGNAGE
365
WAYFINDING
SIGNAGE
370
PROPOSED
PEDESTRIAN
ISLAND
BRYN(MS.ARW. 1R03A2V)E
BRYN MAWR AVE R/W EXTENSION
15' WIDE MULTI-USE
ASPHALT TRAIL
© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
0
50'
100'
NOT FOR CONSTRUCTION
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
PROJECT
NWTPX06004
DATE
DRAWING SCALE
DRAWN BY
APPROVED BY
2023-03-22
1"=50'
RG
LB
CM1001-2
SHEET 2 OF 4
MATCH LINE - SHEET CM1001-2
350
60.00'
345
HUNTERS RUN
INTERPRETIVE
SIGNAGE
EXISTING
STREAM
CURVE FOR DOWNHILL
TRAFFIC CALMING
STREAM
CROSSING
EXISTING
FOOT BRIDGE
(TO BE REMOVED)
HUNTERS RUN
INTERPRETIVE
SIGNAGE
345
350
EXISTING LIGHT
POST. (TYP.)
360
PROPOSED
RETAINING WALL
3-5 FT HEIGHT
"CYCLISTS
DISMOUNT"
SIGN
RESTRIPE
CROSSWALK
360
WAY FINDING
SIGNAGE
PROPOSED CURB
7" HIGH RAISED
CROSSWALK/
SPEED TABLE
WATCH FOR
CYCLISTS SIGN
2 GREEN BACK
SHARROWS
MATCH LINE - SHEET CM1001-4
© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
0
50'
100'
NOT FOR CONSTRUCTION
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
PROJECT
NWTPX06004
DATE
DRAWING SCALE
DRAWN BY
APPROVED BY
2023-03-22
1"=50'
RG
LB
CM1001-3
SHEET 3 OF 4
MATCH LINE - SHEET CM1001-3
© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
RESTRIPE
CROSSWALK
2 GREEN BACK
SHARROWS
RESTRIPE
CROSSWALK
TRAFFIC CALMING
NECK-DOWN
20' CARTWAY
4' BIKE CUT THROUGH
RESTRIPE
CROSSWALK
NARROW TURN
LANE BEGINS
AT CURB
PROPOSED CURB BUMPOUT
WITH RAMP REPLACEMENTS
PROPOSED LIGHT FIXTURE
ON EXISTING UTILITY POLE
WAY FINDING
SIGNAGE
PROPOSED PEDESTRIAN
ISLAND WITH NEW PUSH
BUTTON
2 GREEN BACK
SHARROWS
PROPOSED CURB
MEETS EXISTING
CURB WITH RAMP
REPLACEMENT
NEW PEDESTRIAN LIGHTING
TO TIE INTO EXISTING
WAY FINDING
SIGNAGE
PROPOSED CURB BUMPOUT
WITH RAMP REPLACEMENTS
PROPOSED
CURB RAMP
NEW HIGH VIS
CROSSWALK
TRAFFIC CALMING
NECK-DOWN
20' CARTWAY
4' BIKE CUT THROUGH
RE-STRIPE
CROSSWALKS
PROPOSED
CURB RAMP
TRAFFIC CALMING
NECK-DOWN
20' CARTWAY
4' BIKE CUT THROUGH
© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
0
50'
100'
NOT FOR CONSTRUCTION
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
PROJECT
NWTPX06004
DATE
DRAWING SCALE
DRAWN BY
APPROVED BY
2023-03-22
1"=50'
RG
LB
CM1001-4
SHEET 4 OF 4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...professional services work for the Borough of Carlisle for a Tree Inventory & ...

Carlisle borough

Bid Due: 10/08/2026

...residents. Contents primarily consist of woody debris such as tree branches, tree trunks ...

PennBid

Bid Due: 9/29/2026

..., and restoration along High Street, N 3rd Street, and S 2nd Street ...

PennBid

Bid Due: 9/29/2026

...Street in Langhorne Borough. The work to be performed under this Contract includes..., ...

PennBid

Bid Due: 9/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.