Hydrogen-Based Zero-Emission On-Road Mobile Source Related Technology Development, Demonstration, Deployment, Workforce Development, and Air Quality Impact Projects

Location: California
Posted: Oct 2, 2026
Due: Nov 13, 2026
Agency: South Coast Air Quality Management District
Type of Government: State & Local
Category:
  • A - Research and development
  • D - Automatic Data Processing and Telecommunication Services
  • R - Professional, Administrative and Management Support Services
Solicitation No: P2027-05
Publication URL: To access bid details, please log in.
Bid Number Title Bidder's Conference Closing Date Contact Person Document
P2027-05 Hydrogen-Based Zero-Emission On-Road Mobile Source Related Technology Development, Demonstration, Deployment, Workforce Development, and Air Quality Impact Projects None 11/13/2026
02:00 PM
Maryam Hajbabaei
(909) 396-2341
Vasileios Papapostolou
(909) 396-2254
P2027-05

Attachment Preview

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
REQUEST FOR PROPOSALS
For Hydrogen-Based Zero-Emission On-Road Mobile Source
Related Technology Development, Demonstration,
Deployment, Workforce Development, and Air Quality Impact
Projects
P2027-05
South Coast Air Quality Management District (South Coast AQMD) requests proposals
for the following purpose according to terms and conditions attached. In the preparation
of this Request for Proposals (RFP) the words "Proposer," "Contractor," "Consultant,"
"Bidder" and "Firm" are used interchangeably.
PURPOSE
Hydrogen based zero-emission technologies can play an important role in improving air
quality, particularly in sectors where diesel engines remain difficult to replace, including
heavy-duty transportation, freight movement, port operations, off-road equipment and
backup power generation. Although hydrogen fuel cell technologies continue to advance,
broader deployment remains constrained by the cost of hydrogen production and
compression/liquification, storage, transfer and dispensing losses, transportation and
delivery challenges, fueling infrastructure, and the cost of fuel-cell vehicle and equipment
powertrains. These challenges can be overcome through technologies that can be
demonstrated under this RFP along with increasing the scale of hydrogen usage,
improving workforce training and safety, and better understanding of hydrogen levels in
the atmosphere as related to sources, sinks, and potential impacts on criteria or
greenhouse gases.
Strategic and targeted investments can help achieve economies of scale in hydrogen
production, reduce delivered fuel costs, improve storage efficiency, minimize hydrogen
losses, strengthen distribution and fueling networks, and accelerate the deployment of
practical zero-emission applications. These applications may include the repowering or
replacement of transit buses, heavy-duty trucks, off-road equipment, and other diesel-
powered vehicles and machinery with hydrogen fuel-cell technologies.
The purpose of this RFP is to solicit projects that advance the use of hydrogen through
projects such as hydrogen production with offtake pathways, advanced on-site hydrogen
production, technologies that reduce hydrogen losses by minimizing boil-off gas,
improving storage functionality, hydrogen distribution, delivery and dispensing systems,
expanding applications for fuel cell powertrains and equipment, and conduct studies that
quantify associated air quality and community benefits. This RFP also focuses on
incorporating enhanced hydrogen safety and workforce training to support a skilled
workforce for hydrogen fueling stations, production, and powertrains. Lastly, this RFP is
focused on: 1) supporting the advancement of technologies that may reduce the
production cost of hydrogen using renewable resources; 2) developing and demonstrating
Page 1 of 40

P2027-05
new storage and dispensing processes; 3) developing new powertrains and/or
investigating the benefits of retrofit fuel cell technologies; and 4) studying the
measurements of hydrogen and corresponding atmospheric levels and air quality
benefits.
Priority will be given to projects that demonstrate scalability and commercialization
pathways, committed end-use applications, cost-share, incorporate research and
workforce development, and/or provide measurable or reasonably anticipated air quality
benefits. As appropriate to the project type and stage of development, projects should
include an assessment of potential diesel-related emission reductions (e.g., NOx and PM)
or other factors that support the advancement and deployment of zero-emission
technologies.
INDEX - The following are contained in this RFP:
Section I Background/Information
Section II Contact Person
Section III Schedule of Events
Section IV Participation in the Procurement Process
Section V Statement of Work/Schedule of Deliverables
Section VI Required Qualifications
Section VII Proposal Submittal
Section VIII Proposal Submission
Section IX Proposal Evaluation/Contractor Selection
Section X Funding
Section XI Sample Contract
Attachment A Participation in the Procurement Process
Attachment B Certifications and Representations
SECTION I: BACKGROUND INFORMATION
South Coast AQMD is a regional governmental agency responsible for meeting air quality
health standards in Orange County and the urban portions of Los Angeles, Riverside, and
San Bernardino counties.
South Coast AQMD has a longstanding history of supporting research development,
demonstration, and deployment projects that advance clean fuels, low- and zero-
emission vehicles, and associated infrastructure. These investments are intended to
achieve significant NOx and PM emission reductions, accelerate the commercialization
of advanced zero-emission technologies, and support attainment of federal and state air
quality standards.
Through its Clean Fuels Program, South Coast AQMD has supported technologies
across a range of technology readiness levels, including advanced vehicles, fueling and
charging infrastructure, fuel cells, batteries, hydrogen production and fueling systems
and other mobile- and stationary source technologies. More recently, South Coast

P2027-05
AQMD's technology advancement efforts have placed increasing emphasis on zero-
emission technologies and the supporting infrastructure necessary for their successful
deployment. This focus is consistent with the 2022 South Coast AQMD Air Quality
Management Plan (AQMP), which identifies substantial NOx emission reductions as
essential to attaining applicable air quality standards and improving public health
throughout the South Coast Air Basin.
Hydrogen and fuel cell technologies represent an important component of South Coast
AQMD's zero-emission technology portfolio, particularly for applications that are difficult
to electrify through batteries alone. These applications may include heavy-duty
transportation, drayage and freight operations, transit vehicles, off-road equipment,
marine applications and stationary or backup power generation. Fuel cells offer a zero-
emission alternative to higher-polluting internal combustion engines, while on-going
technology demonstrations continue to address barriers related to infrastructure
availability, system durability, operational reliability, cost and commercial deployment.
Although hydrogen technologies offer significant opportunities to reduce emissions,
deployment remains constrained by several technical and economic barriers. These
include the cost and limited scale of hydrogen production, storage and delivery losses,
boil-off gas management, fueling infrastructure reliability and availability, high delivered
hydrogen costs, and the cost and availability of fuel cell powertrains and related
equipment. Additional demonstration and deployment activities are therefore needed to
validate scalable hydrogen production pathways, reduce production and delivered-fuel
costs, improve storage and distribution efficiency, increase fueling reliability and
accelerate practical end-use applications such as fuel cell powertrains, repowering or
conversion of existing transit buses and heavy-duty vehicles and the development and
demonstration of advanced fuel cell vehicles and equipment.
The purpose of this solicitation is to support projects that advance hydrogen-based zero-
emission technologies and have the potential to immediately or once fully developed
provide measurable air-quality and public health benefits. Eligible projects may include,
but are not limited to:
* Hydrogen production pathways that increase production scale, improve
efficiency, and reduce costs;
* On-site or distributed hydrogen production systems that strengthen the
connection between hydrogen supply and committed end users;
* Hydrogen storage technologies that reduce losses and improve boil-off gas
capture, recovery, management, or beneficial use;
* Improvements to hydrogen transportation, distribution, delivery, compression,
and dispensing systems;
* Technologies that improve the reliability, availability, throughput, and cost-
effectiveness of hydrogen refueling infrastructure;

P2027-05
* Development, integration, demonstration, or deployment of fuel cell powertrains
for heavy-duty vehicles, transit buses, off-road equipment, marine applications,
or stationary power or backup systems;
* Repowering or conversion of existing buses, trucks, or other diesel-powered
vehicles and equipment with hydrogen fuel cell systems; and
* Air quality, emissions, exposure or health impact studies that quantify the benefits
and potential impacts associated with hydrogen production, distribution, fueling
and end-use application including studies that better understand the levels,
measurements, atmospheric chemistry, and sources of hydrogen into the
atmosphere.
* Development of Hydrogen safety and workforce training procedure
Consistent with South Coast AQMD program objectives, priority may be given to projects
that provide direct and measurable emission reductions in overburdened communities,
particularly communities affected by freight movement, port operations, warehouses,
industrial facilities, transit operations, and other concentrated sources of diesel
emissions. Projects should clearly identify the communities and source categories that
will benefit and describe the methods that will be used to quantify reductions in NOx and
PM emissions, and community exposure as applicable.
Additional evaluation considerations may include project location, use of renewable or
zero-emission hydrogen production pathways, anticipated hydrogen production or
dispensing throughput, committed fleet demand and hydrogen offtake, technology
implementation readiness, infrastructure scalability, cost effectiveness, operational
reliability, public accessibility, commercialization potential, and the ability to leverage
public or private co-funding. Projects that integrate hydrogen supply, infrastructure, and
end-use demand into a coordinated and scalable deployment pathway may receive
additional consideration.
SECTION II: CONTACT PERSON
Questions regarding the content or intent of this RFP or on procedural matters should
be addressed to:
Technical:
Maryam Hajbabaei, Ph.D.
Program Supervisor, Technology Demonstration
Tel: (909) 396-2341
E-Mail: mhajbabaei@aqmd.gov
Vasileios Papapostolou, Sc.D.
Technology Demonstration Manager
Tel: (909) 396-2254
E-mail: vpapapostolou@aqmd.gov

DATE EVENT
October 2, 2026 RFP Released
November 13, 2026 Proposals received by South Coast AQMD - No Later Than 02:00 p.m. PST
November 17 to December 11, 2026 Proposal Evaluations
February 2027 Recommended Awards to Governing Board
April 2027 Anticipated Contract Execution

P2027-05
Administrative:
Anish Pathak
Procurement Manager
Tel: (909) 396-2430
E-mail: apathak@aqmd.gov
SECTION III: SCHEDULE OF EVENTS
DATE EVENT
October 2, 2026 RFP Released
Proposals received by South Coast AQMD -
November 13, 2026
No Later Than 02:00 p.m. PST
November 17 to December
Proposal Evaluations
11, 2026
February 2027 Recommended Awards to Governing Board
April 2027 Anticipated Contract Execution
SECTION IV: PARTICIPATION IN THE PROCUREMENT PROCESS
It is the policy of South Coast AQMD to ensure that all businesses including minority
business enterprises, women business enterprises, disabled veteran business
enterprises and small businesses have a fair and equitable opportunity to compete for
and participate in South Coast AQMD contracts. Attachment A to this RFP contains
definitions and further information.
SECTION V: STATEMENT OF WORK/SCHEDULE OF DELIVERABLES
A. Objective
The objective of this solicitation is to support hydrogen-based zero emission technology
projects that reduce barriers to commercialization, lower hydrogen production and
delivery costs, improve storage and system efficiency, expand hydrogen fuel cell end-use
applications and provide measurable air quality benefits within, or directly benefiting, the
South Coast AQMD jurisdiction.
B. Statement of Work
Eligible projects may include but are not limited to, hydrogen production, hydrogen
storage and boil-off gas reduction, hydrogen transportation, delivery and fueling
improvements, fuel cell powertrain development and integration, vehicle or equipment
repowering, and air quality, emissions, or exposure impact studies as defined in the

Project Category Funding Cap Minimum cost share %
1. Hydrogen production $7 million 20%
2. Hydrogen storage, transportation, delivery, fueling, boil-off gas reduction technologies $5 million 20%
3. Fuel Cell Powertrain development, integration, vehicle or equipment repowering $3 million 20%
4. Air quality, emission or exposure impact studies $1 million 5%*
5. Development of Hydrogen safety and workforce training procedure $1 million 5%*

P2027-05
background section of this RFP. Proposers may submit proposals addressing one or
more project categories based on their technical qualifications, project readiness,
implementation capacity, and anticipated air quality benefits. The funding cap for projects
with combined categories is $9 million. A minimum cash cost share is 20%, including up
to 5% in-kind for all projects except project category 4 and 5.
Project Main Categories:
Project Category Funding Cap Minimum cost
share %
1. Hydrogen production $7 million 20%
2. Hydrogen storage, transportation, $5 million 20%
delivery, fueling, boil-off gas reduction
technologies
3. Fuel Cell Powertrain development, $3 million 20%
integration, vehicle or equipment
repowering
4. Air quality, emission or exposure impact $1 million 5%*
studies
5. Development of Hydrogen safety and $1 million 5%*
workforce training procedure
*2.5% cash cost share and 2.5% in kind
Task 1: Project Work Plan and Kickoff Meeting
Contractors shall prepare a comprehensive project workplan that defines the project
scope, objectives, technical approach, schedule, milestones, deliverables, budget, and
reporting requirements.
Contractors shall identify all project partners and describe their respective roles,
responsibilities, technical contributions, and financial commitments.
Contractors shall identify applicable permitting, environmental review, site-access, utility-
interconnection, safety, workforce training and regulatory requirements, as appropriate to
the proposed project.
Contractors shall describe the proposed data collection, quality assurance, performance
monitoring, and reporting approaches.

P2027-05
Contractors shall participate in a project kickoff meeting with South Coast AQMD and
other designated project partners to review the approved scope of work, schedule,
deliverables, responsibilities, and administrative requirements.
Task 2: Technology Description and Readiness Level, and Baseline Assessment
Contractors shall provide a detailed description of the proposed hydrogen technology,
project category, intended application, current Technology Readiness Level (TRL), and
anticipated pathway toward deployment or commercialization.
Contractors shall establish a defined baseline against which project performance and
benefits will be evaluated. The baseline may include existing fleet or equipment
performance, current hydrogen production or delivered-fuel costs, energy consumption,
storage or distribution losses, fueling limitations, diesel fuel use, criteria pollutant
emissions, or other applicable conditions.
Contractors shall tailor the baseline assessment to the proposed project type. Contractors
proposing hydrogen production projects shall describe the production pathway,
feedstock, production capacity, energy requirements, anticipated utilization and expected
cost or efficiency improvements. Contractors proposing storage projects shall quantify
existing storage losses and describe anticipated reductions in boil-off gas or other
hydrogen losses. Contractors proposing repowering projects shall describe the existing
vehicle or equipment, baseline engine or powertrain, duty-cycle, fuel use, and proposed
fuel system. Contractors proposing analytical or air quality studies shall define the
analytical baseline, data sources, assumptions, geographic scope, and evaluation
methodology.
Task 3: Project Design, Engineering, and Methodology
Contractors shall complete the technical design, engineering, analytical methodology,
and implementation planning necessary to successfully carry out the approved project.
Contractors shall develop design documentation appropriate to the project type and level
of technology readiness. Such documentation may include engineering drawings,
process-flow diagrams, equipment specifications, system architecture, interface control
documents, modeling methods, testing protocols, deployment plans, commissioning
procedures, safety plans, permitting documentation, data management plans or study
methodologies.
Contractors shall identify key technical, schedule, cost, supply-chain, permitting, safety,
and operational risks and describe the measures that will be implemented to avoid,
mitigate, or manage those risks.
Contractors shall demonstrate that the proposed design or methodology is technically
feasible, scalable, and aligned with the project's performance, emissions reduction, and
commercialization objectives.

P2027-05
Task 4: Demonstration, Deployment, Analysis, or Implementation
Contactors shall implement the approved project scope in accordance with the final work
plan, schedule, budget, technical specifications, and applicable regulatory and safety
requirements.
Contractors shall complete all activities necessary to execute the proposed project, which
may include equipment procurement and installation, site preparation, system fabrication
and integration, testing and commissioning, pilot demonstration, field deployment, vehicle
or equipment repowering, operation of a hydrogen production, storage, delivery, or fueling
system, data collection, air-quality modeling, emissions analysis, or other approved
technical activities.
Contractors shall coordinate with South Coast AQMD, project partners, fleet operators,
site hosts, technology providers, permitting agencies, utilities, fuel suppliers, and other
relevant entities throughout project implementation.
Contractors shall document operational performance, implementation challenges, system
modifications, downtime events, maintenance requirements, safety incidents, and
corrective actions throughout the demonstration or analytical period.
Task 5: Performance, Cost, and Emissions Evaluation
Contractors shall evaluate project performance relative to the established baseline,
approved project objectives and applicable performance targets.
Contractors shall evaluate metrics applicable to the proposed project, which may include
hydrogen production volume and capacity, production and delivered-fuel cost per
kilogram, energy and water consumption, system efficiency, storage losses, boil-off gas
capture, recovery, or reduction, hydrogen delivery volume, fueling throughput, station or
system uptime, refueling time, vehicle or equipment availability, range, fuel economy,
payload capability, diesel displacement, and maintenance requirements.
Contractors shall quantify criteria pollutant emission reductions, including NOx and PM,
where applicable. Contractors shall also quantify reductions in community exposure, and
other air quality or public health benefits when supported by the project scope and
available data.
Contractors shall evaluate project cost effectiveness, scalability, operational feasibility,
and potential to support future deployment or commercialization.
Task 6: Reporting, Meetings, and Final Recommendations

P2027-05
Contractors shall participate in periodic progress meetings, technical reviews and other
coordination meetings requested by South Coast AQMD.
Contractors shall submit periodic progress reports that summarize work completed,
milestones achieved, expenditures, performance results, upcoming activities, project
risks, schedule or budget variances, and corrective actions.
Contractors shall promptly notify South Coast AQMD of material technical, financial,
permitting, safety, or schedule issues that may affect successful completion of the project.
Contractors shall prepare and submit a comprehensive final report documenting the
project background, objectives, methodology, design, implementation activities,
performance results, costs, emission and air quality benefits, challenges, corrective
actions, lessons learned, and recommendations.
Contractors shall include recommendations addressing future technology development,
system optimization, cost reduction, replication, scalability, deployment, and
commercialization.
Contractors shall provide all final data, calculations, supporting documentation,
photographs, diagrams, and other materials required by South Coast AQMD to verify
project results and communicate project outcomes.
C. Eligible Project Areas
Eligible projects may include, but are not limited to:
* Scalable, efficient, and lower-cost hydrogen production pathways;
* On-site or distributed production linked to committed hydrogen users;
* Storage technologies that reduce losses and improve boil-off gas
management;
* Improved hydrogen transportation, delivery, compression, and dispensing
systems;
* More reliable, higher-throughput, and cost-effective refueling infrastructure;
* Fuel-cell powertrains for heavy-duty, transit, off-road, marine, and stationary
applications;
* Conversion or repowering of diesel vehicles and equipment with fuel-cell
systems; and

P2027-05
* Studies evaluating air quality, emissions, exposure, and health impacts.
D. Schedule of Deliverables
Specific deliverables and time schedules for task completion will be established by the
Deputy Executive Officer, or his designee, in writing when each task is authorized.
Deliverables may include but not be limited to one or more of the following: written and/or
oral technical reports, spreadsheets containing calculations and technical evaluation of
projects, data analysis of emissions inventory, newsletters, articles, draft position papers,
language for control measures, attendance at meetings with follow-up reports, etc.
SECTION VI: REQUIRED QUALIFICATIONS
A. Proposers must demonstrate the experience, technical expertise, professional
qualifications, and organized capacity necessary to successfully perform the
services described in the Statement of Work. At a minimum, the proposer and
proposed key personnel shall have demonstrated experience performing projects of
similar scope and complexity and shall possess any licenses, certifications,
education, or other professional qualifications applicable to the work.
1. Proposer shall provide sufficient documentation to demonstrate compliance with
these requirements, including resumes, or statement of qualifications for key
personnel, descriptions of relevant projects and experience, representative
clients, and/or references, and a summary of the Proposer's overall
qualifications, personnel, and resources available to perform the work.
SECTION VII: PROPOSAL SUBMITTAL REQUIREMENTS
Submitted proposals must follow the format outlined below and all requested information
must be supplied. Failure to submit proposals in the required format will result in
elimination from proposal evaluation. South Coast AQMD may modify the RFP or issue
supplementary information or guidelines during the proposal preparation period prior to
the due date. Please check our website for updates (http://www.aqmd.gov/grants-bids).
The cost for developing the proposal is the responsibility of the Contractor and shall not
be chargeable to South Coast AQMD.
Each proposal must be submitted in three separate volumes:
* Volume I - Technical Proposal
* Volume II - Cost Proposal
* Volume III - Certifications and Representations included in Attachment B to this
RFP, must be completed and executed by an authorized official of the Contractor.
A separate cover letter, including the name, address, and telephone number of the
contractor, and signed by the person or persons authorized to represent the Firm should
accompany the proposal submission. Firm contact information as follows should also be
included in the cover letter:

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow UPDATE Request for Bids for Food Trucks at Rodeo Beach within Golden

INTERIOR, DEPARTMENT OF THE

Bid Due: 12/31/2026

GFO-26-302 - Food Production Investment Program 2026 Solicitation Type Grant Funding Opportunity Solicitation

California Energy Commission

Bid Due: 12/17/2026

Opportunity ID 224081 Organization City of Los Angeles Department Transportation Stage Open Contact

City of Los Angeles

Bid Due: 12/10/2026

Project ID: Title: 2026 Sewer Rehabilitation Project Addenda: 0 Release Date: 9/17/2026 Due

City of American Canyon

Bid Due: 1/12/2027

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.