Multiple Fence Repairs - Moody AFB - Amendment (0002)

Location: Georgia
Posted: Aug 7, 2025
Due: Aug 13, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • S - Utilities and Training Services
Solicitation No: FA483025R0010
Publication URL: To access bid details, please log in.
Follow
Multiple Fence Repairs - Moody AFB - Amendment (0002)
Active
Contract Opportunity
Notice ID
FA483025R0010
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
AIR COMBAT COMMAND
Office
FA4830 23 CONS CC
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Aug 07, 2025 02:37 pm EDT
  • Original Published Date: May 01, 2025 08:24 am EDT
  • Updated Date Offers Due: Aug 13, 2025 10:00 am EDT
  • Original Date Offers Due: May 15, 2025 10:00 am EDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Aug 28, 2025
  • Original Inactive Date: May 30, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: S216 - HOUSEKEEPING- FACILITIES OPERATIONS SUPPORT
  • NAICS Code:
    • 561730 - Landscaping Services
  • Place of Performance:
    Moody AFB , GA
    USA
Description View Changes

Amendment 0001 is to update the Statement of Work, and to extend the date offers are due to the date of 13 August 2025.



Amendment 0002 is to add the Questions and Answers to the solicitation.



This is a 100% Small Business Set-Aside. Moody AFB is looking for a company that can conduct the repair and replacement of damaged fences across multiple locations at Moody AFB and Grassy Pond, as detailed in the Statement of Work (SOW), which were damaged due to Hurricane Helene. The objective is to restore the fences to their pre-damage condition, ensuring safety, functionality, and aesthetics. The estimated magnitude of this construction project is between $25,000 and $100,000, in accordance with FAR 36.204(b).



Statement of Work

Replace Damaged Fences – 23d FSS

1. Scope

The project involves the replacement of two (2) fences located across Moody AFB and one (1) fence at Grassy Pond (Lake Park, GA). The damage was incurred during Hurricane Helene, necessitating the replacement of all or portions of three (3) total fences. The objective of the project is to restore the structural integrity, functionality, safety, and aesthetics of the fences at Moody AFB and Grassy Pond.

2. Background

23d FSS strives to meet the needs of our customer base. The outfield fence at the Softball Field (Moody AFB) has a 6’ chain link fence that needs to be replaced; the Tennis Courts (Moody AFB) has a 10’ chain link fence that needs to be replaced; and, the Maintenance Yard (Grassy Pond) has a long L-section of 6’ chain link fence that needs to be replaced. Neither Moody AFB nor Grassy Pond can fully supply the demand for our activities to our customers due to the fence damage sustained by Hurricane Helene. This has a direct, negative impact on the health of the MWRF. Replacing these three (3) fences will allow Moody AFB/Grassy Pond to recover these lines of income in support of the MWRF.

3. Requirements

3.1 Softball Field Chain Link Fence Repair (Moody AFB)

o Overall Dimensions of Section Needing to be Repaired

 Height: 6’

 Length: 535 LF (entire outfield fence)

o Material

 Galvanized steel to match the existing fence

 Mesh Size: 2” diamond mesh

 Gauge: 9-gauge

 10’ sections between posts

 Posts buried 3’ in the ground

 Reattach protective barrier on top of fence

 Install bottom tension wire to eliminate ability to push bottom of the fence in and gain access to the area.

 Stretch and secure material using tension bars and/or bands at terminal posts

o Site Preparation and Demolition

 Remove and dispose of existing chain link fence and associated hardware into contractor provided dumpster(s).

 Prep the site for the line posts utilizing concrete footings for stability

 Concrete footings to be minimum 3’ deep and properly cured before installation.

 Level and plumb the fence section

3.2 Tennis Courts Chain Link Fence Repair (Moody AFB)

o Overall Dimensions of Entire Fence Needing to be Replaced

 Height: 10’

 Length: 122 LF x 112 LF x 122LF

o Material

 Galvanized steel to match the existing fence

 Mesh Size: 2” diamond mesh

 Gauge: 9-gauge

 Ensure proper spacing: 10’ on center

 Secure connections with appropriate fittings

 Install bottom tension wire to eliminate the ability to push the bottom of the fence in and gain access to the area.

 New privacy screen to cover the entire fence.

• Privacy screens need to be secured with hog rings or comparable hardware

• Color of privacy screen to be chosen post-award

o Site Preparation and Demolition

 Remove and dispose of existing chain link fence and associated hardware into contractor provided dumpster.

 Prep the site for the line posts utilizing concrete footings for stability

 Concrete footings to be minimum 3’ deep and properly cured before installation.

 Level and plumb the fence sections

3.3 Maintenance Yard Chain Link Fence (Grassy Pond)

o Overall Dimensions of Section Needing to be Repaired

 Height: 6’

 Length: 215’ L-Section

o Material

 Galvanized steel to match the existing fence

 Mesh Size: 2” diamond mesh

 Gauge: 9-gauge

 Ensure proper spacing: 10’ on center

 Secure connections with appropriate fittings

 Install bottom tension wire to eliminate ability to push bottom of the fence in and gain access to the area.

o Site Preparation and Demolition

 Remove and dispose of damaged chain link fence and associated hardware into contractor provided dumpster.

 Prep the site for the line posts utilizing concrete footings for stability

 Concrete footings to be minimum 2’-3’ deep and properly cured before installation.

 Level and plumb the fence sections

Standard 1-year warranty to be provided by Contractor.

3.4 Equipment Requirements

 All Equipment Required to Complete the Fences in Their Entirety Shall Be Supplied by the Contractor



Evaluation Criteria



In accordance with FAR 52.212-2, evaluation of offers will be based on the following factors:





  • Technical Capability: The contractor’s ability to meet the requirements as described in the Statement of Work (SOW).




  • Price: The lowest price technically acceptable.




  • Action Plan Requirement: Offerors are required to include a detailed action plan with their proposal. The action plan must clearly outline how the contractor will complete the work, the steps involved, and the timeline for each phase of the project.





Additional Information





  • This is a Firm-Fixed-Price contract.




  • All work must comply with applicable safety regulations.




  • The contractor is required to provide all necessary equipment, including PPE for the project, and dumpsters for proper disposal of material.




  • The contractor will also need to provide a portable restroom if necessary for the site.





Questions due 05 August 2025 @1000.



Point of Contact



For questions or concerns please contact:

Name: Darien Savage

Phone: (229) 257-2827


Attachments/Links
Contact Information
Contracting Office Address
  • ADMIN ONLY NO REQTN CP 229 257 2737 4380 B ALABAMA RD BLDG 932
  • MOODY AFB , GA 31699-1700
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

May 1, 2025[Solicitation (Original)] Multiple Fence Repairs - Moody AFB
May 6, 2025[Solicitation (Updated)] Multiple Fence Repairs - Moody AFB
May 13, 2025[Solicitation (Updated)] Multiple Fence Repairs - Moody AFB
Jul 29, 2025[Solicitation (Updated)] Multiple Fence Repairs - Moody AFB
Jul 30, 2025[Solicitation (Updated)] Multiple Fence Repairs - Moody AFB - Amendment (0001)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Solicitation Number: FA8533-11-R-33345 Notice Type: Solicitation Synopsis: Added: May 04, 2011 1:58 pm

Department of the Air Force

Bid Due: 10/14/2047

Concession Stand with Restrooms at Parks Mill Auburn, Georgia Posted: Friday, July 25,

Georgia Local Government Access

Bid Due: 8/19/2047

DATE: May 1, 2026 Fire Station #9 - Demolition & New Exterior Metal

Troup County

Bid Due: 6/09/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66523-NONST-2026-000000022

State Government of Georgia

Bid Due: 6/05/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.