| Location: | New York |
|---|---|
| Posted: | Dec 24, 2024 |
| Due: | Jan 17, 2025 |
| Agency: | The City of New York |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
PIN#Wharf 2/3 Pier 2 Dock Due: 1/17/2025 4:00 PM
Brooklyn Bridge Park seeks to hire a qualified General/Marine Contractor for the rehabilitation of the floating dock at Pier 2 within the Park as well as the wharf between Pier 2 and Pier 3. The Floating Dock, measures 20 ft by 40 ft, and is connected to north side of Pier 2 by a 38-ft long gangway and two guide piles. As part of this scope of work two additional piles are to be installed to stabilize the dock, and repairs to the concrete platform are required. The 275-ft long, 25-ft wide wharf between Piers 2 and 3 requires necessary routine repairs. This includes (12) pile repairs, concrete spall and fascia repairs.
It is important to note that the work scope outlined in this RFP will be taking place in completed sections of the park which are open and populated by the public. Convenience and safety of the public is a priority for BBP.

With GovernmentContracts, you can:
54 Title: Docks and Breakwater Replacement at Canoe Point Note: bid opening via
The New York State Contract Reporter
Bid Due: 7/01/2026