Chavez High School Theater Stage Update Project- IFB 26-09 ADDENDUM #2

Location: California
Posted: Apr 13, 2026
Due: Apr 17, 2026
Agency: Stockton Unified School District
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
Publication URL: To access bid details, please log in.
  • Chavez High School Theater Stage Update Project- IFB 26-09

    ADDENDUM #2 Cesar Chavez Theater

    ADDENDUM #1 Chavez Theater

    Project Manual Chavez Theater

    Plans - Drawings Chavez Theater

    Project Labor Agreement

    Chavez Theater Job Walk Sign In

  • Attachment Preview

    John Sergio Fisher & Associates Inc.
    5567 Reseda Blvd. Suite 209
    Los Aneles, CA 91356
    818.344.3045
    Fax 818.344.0338
    ADDENDUM #2
    jsfa
    Project:
    Date:
    Owner:
    Architect:
    CESAR CHAVEZ H.S. THEATRE RENOVATION
    2929 Windflower Lane
    Stockton, CA 95212
    April 13, 2026
    Stockton Unified School District
    1944 El Pinal Drive
    Stockton, CA 95212
    John Sergio Fisher & Associates
    5567 Reseda Boulevard, Suite 209
    Los Angeles, CA 91356
    A. This Addendum of clarifications, modifications, changes, additions, and/or deletions contained
    herein shall be considered part of the Bid Documents for the above referenced Project as
    though it had been issued at the same time and shall be incorporated integrally with the
    Construction Documents for the project. Where provisions of the following supplementary
    data differ from those of the Original Bid Documents, this Addendum shall govern and take
    precedence.
    B. Bidders are hereby notified that they shall make any adjustments in their estimates as a
    result of this Addendum. It will be understood that each bidder's proposal is submitted with
    full knowledge of all modifications and supplemental data specified herein.
    1. CHANGES AND ADDITIONS TO THE BID DOCUMENTS
    SPECIFICATIONS:
    Item No. 2.01 Section 01 64 00 OWNER-FURNISHED PRODUCTS
    sub-section 2.02 FURNISHED MATERIALS AND EQUIPMENT - REVISED
    Item No. 2.02 Section 2.4.6 in the PLA covers specialized See attached exhibit H
    Item No. 2.03 Federal Byrd anti-lobbying is not required for this project.
    Item No. 2.04 AV Systems: The Sure SLXD1 and SLXD2 have been replaced by the
    SLXD1+ and the SLXD2+, respectively, by the manufacturer.
    Cesar Chavez Theatre Renovation
    Addendum 1
    Page 1 of 1
    DOCUMENT 01 64 00
    OWNER-FURNISHED PRODUCTS
    PART 1 GENERAL
    1.01 RELATED DOCUMENTS AND PROVISIONS
    All Contract Documents should be reviewed for applicable provisions related to the
    provisions in this document, including without limitation:
    A.
    General Conditions;
    B.
    Special Conditions; and
    C. Materials and Equipment.
    1.02 SECTION INCLUDES
    A.
    Requirements for the following:
    (1) Installing Owner-furnished materials and equipment.
    (2) Providing necessary utilities, connections and rough-ins.
    1.03 DEFINITIONS
    A.
    Owner: District, who is providing/furnishing materials and equipment.
    B.
    Installing Contactor: Contractor, who is installing the materials and
    equipment furnished by the Owner.
    1.04 PRODUCT DELIVERY, STORAGE, AND HANDLING
    A.
    Receive, store and handle products in accordance with the manufacturer’s
    instructions.
    B.
    Protect equipment items as required to prevent damage during storage and
    construction.
    PART 2 PRODUCTS
    2.01 GENERAL PRODUCT REQUIREMENTS
    A.
    Installing Contractor’s Responsibilities:
    (1) Verify mounting and utility requirements for Owner-furnished materials
    and equipment items.
    (2) Provide mounting and utility rough in for all items where required.
    STOCKTON UNIFIED SCHOOL DISTRICT
    OWNER-FURNISHED PRODUCTS
    DOCUMENT 01 64 00-1
    (a) Rough in locations, sizes, capacities, and similar type items
    shall be as indicated and required by product manufacturer.
    B.
    Owner and Installing Contractor(s) Responsibilities:
    (1) Owner-Furnished/Contractor Installed (“OFCI”): Furnished by the
    Owner; installed by the Installing Contractor.
    (a) General: Owner and Installing Contractor(s) will coordinate
    deliveries of materials and equipment to coincide with the
    construction schedule.
    (b) Owner will furnish specified materials and equipment delivered
    to the site. Owner/vendor’s representative shall be present on
    Site at the time of delivery to comply with the contract
    requirements and Specifications Section 01 43 00, Materials
    and Equipment, Article 1.04.
    (c) The Owner furnishing specified materials and equipment is
    responsible to provide manufacturer guarantees as required by
    the Contract to the Installing Contractor.
    (d) The Installing Contractor shall:
    1) Review, verify and accept the approved manufacturer’s
    submittal/Shop Drawings for all materials and
    equipment required to be installed by the Installer
    Contractor and furnished by the Owner. Any
    discrepancies, including but not limited to possible space
    conflicts, should be brought to the attention of the
    Project Manager and/or Program Manager, if applicable.
    2) Coordinate timely delivery. Installing Contractor shall
    receive materials and equipment at Site when delivered
    and give written receipt at time of delivery, noting
    visible defects or omissions; if such declaration is not
    given, the Installing Contractor shall assume
    responsibility for such defects and omissions.
    3) Store materials and equipment until ready for
    installation and protect from loss and damage.
    Installing Contractor is responsible for providing
    adequate storage space.
    4) Coordinate with other bid package contractors and field
    measurement to ensure complete installation.
    5) Uncrate, assemble, and set in place.
    6) Provide adequate supports.
    7) Install materials and equipment in accordance with
    manufacturer’s recommendations, instructions, and
    STOCKTON UNIFIED SCHOOL DISTRICT
    OWNER-FURNISHED PRODUCTS
    DOCUMENT 01 64 00-2
    Shop Drawings, supply labor and material required, and
    make mechanical, plumbing, and electrical connections
    required to operate equipment.
    8) Be certified by equipment manufacturer for installation
    of the specific equipment supplied by the Owner.
    9) Provide anchorage and/or bracing as required for
    seismic restraint per Title 24, UBC Standard 27-11 and
    all other applicable codes.
    10) Provide the contract-required warranty and guarantee
    for all work, materials and equipment, and installation
    upon its completion and acceptance by the District.
    Guarantee includes all costs associated with the
    removal, shipping to and from the Site, and re-
    installation of any equipment found to be defective.
    C. Compatibility with Space and Service Requirements:
    (1) Equipment items shall be compatible with space limitations indicated
    and as shown on the Contract Documents and specified in other
    sections of the Specifications.
    (2) Modifications to equipment items required to conform to space
    limitations specified for rough in shall not cause additional cost to the
    District.
    D. Manufacturer’s printed descriptions, specifications, and instructions shall
    govern the Work unless specifically indicated or specified otherwise.
    2.02 FURNISHED MATERIALS AND EQUIPMENT
    A.
    All furnished materials and equipment are indicated or scheduled on the
    Contract Documents.
    B.
    Products listed in the following sections shall be Owner Furnished Contractor
    Installed (OFCI):
    (1) 11 06 40 Theatrical Lighting Control
    (2) 11 06 50 Theatrical Lighting Fixtures
    (3) AV Speakers and controls listed on the AV drawings
    C. Products listed in the following sections shall be Owner Furnished Owner
    Installed (OFOI):
    (1) 11 06 10 Theatrical Rigging Systems and Controls
    (2) 11 06 60 Stage Lift
    (3) 14 42 16 Inclined Platform Wheelchair Lift
    D. Products listed in the following sections shall be Owner Furnished Rigging
    Contractor Installed (OFRCI):
    STOCKTON UNIFIED SCHOOL DISTRICT
    OWNER-FURNISHED PRODUCTS
    DOCUMENT 01 64 00-3
    (1) 11 06 20 Theatrical Drapery and Track
    a. Owner to provide drapery
    b. Rigging Contractor to provide remainder for complete drapery
    installation.
    PART 3 EXECUTION
    3.01 INSTALLATION
    A.
    Install equipment items in accordance with the manufacturer’s instructions.
    B.
    Set equipment items securely in place, rigidly or flexibly mounted in
    accordance with manufacturers’ directions.
    C. Make electrical and mechanical connections as indicated and required.
    D. Touch-up and restore damaged or defaced finishes to the Owner’s
    satisfaction.
    3.02 CLEANING AND PROTECTION
    A.
    Repair or replace items not acceptable to the Architect or Owner.
    B.
    Upon completion of installation, clean equipment items in accordance with
    manufacturer’s recommendations, and protect from damage until final
    acceptance of the Work by the Owner.
    END OF DOCUMENT
    STOCKTON UNIFIED SCHOOL DISTRICT
    OWNER-FURNISHED PRODUCTS
    DOCUMENT 01 64 00-4
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow SALE OF SCRAP LEAD ACID BATTERIES Active Contract Opportunity Notice ID S014-24CD

    Federal Agency

    Bid Due: 3/04/2027

    Bid Details WW-756R SFPUC Upcoming Contracting Opportunity - Lower Alemany Area Stormwater Improvements

    San Francisco Public Utilities Commission

    Bid Due: 7/02/2026

    RFP - Request for Proposals - Restaurant Opportunity Three Request for Proposal (RFPs)

    San Mateo County Harbor District

    Bid Due: 6/26/2026

    0338-2025-10-RFB - Traffic Loop Detector Installations (Commodity) Status Stage Open Posted 6/3/2026 Bid

    City of Los Angeles

    Bid Due: 7/02/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.