John Sergio Fisher & Associates Inc.
5567 Reseda Blvd. Suite 209
Los Aneles, CA 91356
818.344.3045
Fax 818.344.0338
ADDENDUM #2
jsfa
Project:
Date:
Owner:
Architect:
CESAR CHAVEZ H.S. THEATRE RENOVATION
2929 Windflower Lane
Stockton, CA 95212
April 13, 2026
Stockton Unified School District
1944 El Pinal Drive
Stockton, CA 95212
John Sergio Fisher & Associates
5567 Reseda Boulevard, Suite 209
Los Angeles, CA 91356
A. This Addendum of clarifications, modifications, changes, additions, and/or deletions contained
herein shall be considered part of the Bid Documents for the above referenced Project as
though it had been issued at the same time and shall be incorporated integrally with the
Construction Documents for the project. Where provisions of the following supplementary
data differ from those of the Original Bid Documents, this Addendum shall govern and take
precedence.
B. Bidders are hereby notified that they shall make any adjustments in their estimates as a
result of this Addendum. It will be understood that each bidder's proposal is submitted with
full knowledge of all modifications and supplemental data specified herein.
1. CHANGES AND ADDITIONS TO THE BID DOCUMENTS
SPECIFICATIONS:
Item No. 2.01 Section 01 64 00 OWNER-FURNISHED PRODUCTS
sub-section 2.02 FURNISHED MATERIALS AND EQUIPMENT - REVISED
Item No. 2.02 Section 2.4.6 in the PLA covers specialized – See attached exhibit H
Item No. 2.03 Federal Byrd anti-lobbying is not required for this project.
Item No. 2.04 AV Systems: The Sure SLXD1 and SLXD2 have been replaced by the
SLXD1+ and the SLXD2+, respectively, by the manufacturer.
Cesar Chavez Theatre Renovation
Addendum 1
Page 1 of 1
DOCUMENT 01 64 00
OWNER-FURNISHED PRODUCTS
PART 1 – GENERAL
1.01 RELATED DOCUMENTS AND PROVISIONS
All Contract Documents should be reviewed for applicable provisions related to the
provisions in this document, including without limitation:
A.
General Conditions;
B.
Special Conditions; and
C. Materials and Equipment.
1.02 SECTION INCLUDES
A.
Requirements for the following:
(1) Installing Owner-furnished materials and equipment.
(2) Providing necessary utilities, connections and rough-ins.
1.03 DEFINITIONS
A.
Owner: District, who is providing/furnishing materials and equipment.
B.
Installing Contactor: Contractor, who is installing the materials and
equipment furnished by the Owner.
1.04 PRODUCT DELIVERY, STORAGE, AND HANDLING
A.
Receive, store and handle products in accordance with the manufacturer’s
instructions.
B.
Protect equipment items as required to prevent damage during storage and
construction.
PART 2 – PRODUCTS
2.01 GENERAL PRODUCT REQUIREMENTS
A.
Installing Contractor’s Responsibilities:
(1) Verify mounting and utility requirements for Owner-furnished materials
and equipment items.
(2) Provide mounting and utility rough in for all items where required.
STOCKTON UNIFIED SCHOOL DISTRICT
OWNER-FURNISHED PRODUCTS
DOCUMENT 01 64 00-1
(a) Rough in locations, sizes, capacities, and similar type items
shall be as indicated and required by product manufacturer.
B.
Owner and Installing Contractor(s) Responsibilities:
(1) Owner-Furnished/Contractor Installed (“OFCI”): Furnished by the
Owner; installed by the Installing Contractor.
(a) General: Owner and Installing Contractor(s) will coordinate
deliveries of materials and equipment to coincide with the
construction schedule.
(b) Owner will furnish specified materials and equipment delivered
to the site. Owner/vendor’s representative shall be present on
Site at the time of delivery to comply with the contract
requirements and Specifications Section 01 43 00, Materials
and Equipment, Article 1.04.
(c) The Owner furnishing specified materials and equipment is
responsible to provide manufacturer guarantees as required by
the Contract to the Installing Contractor.
(d) The Installing Contractor shall:
1) Review, verify and accept the approved manufacturer’s
submittal/Shop Drawings for all materials and
equipment required to be installed by the Installer
Contractor and furnished by the Owner. Any
discrepancies, including but not limited to possible space
conflicts, should be brought to the attention of the
Project Manager and/or Program Manager, if applicable.
2) Coordinate timely delivery. Installing Contractor shall
receive materials and equipment at Site when delivered
and give written receipt at time of delivery, noting
visible defects or omissions; if such declaration is not
given, the Installing Contractor shall assume
responsibility for such defects and omissions.
3) Store materials and equipment until ready for
installation and protect from loss and damage.
Installing Contractor is responsible for providing
adequate storage space.
4) Coordinate with other bid package contractors and field
measurement to ensure complete installation.
5) Uncrate, assemble, and set in place.
6) Provide adequate supports.
7) Install materials and equipment in accordance with
manufacturer’s recommendations, instructions, and
STOCKTON UNIFIED SCHOOL DISTRICT
OWNER-FURNISHED PRODUCTS
DOCUMENT 01 64 00-2
Shop Drawings, supply labor and material required, and
make mechanical, plumbing, and electrical connections
required to operate equipment.
8) Be certified by equipment manufacturer for installation
of the specific equipment supplied by the Owner.
9) Provide anchorage and/or bracing as required for
seismic restraint per Title 24, UBC Standard 27-11 and
all other applicable codes.
10) Provide the contract-required warranty and guarantee
for all work, materials and equipment, and installation
upon its completion and acceptance by the District.
Guarantee includes all costs associated with the
removal, shipping to and from the Site, and re-
installation of any equipment found to be defective.
C. Compatibility with Space and Service Requirements:
(1) Equipment items shall be compatible with space limitations indicated
and as shown on the Contract Documents and specified in other
sections of the Specifications.
(2) Modifications to equipment items required to conform to space
limitations specified for rough in shall not cause additional cost to the
District.
D. Manufacturer’s printed descriptions, specifications, and instructions shall
govern the Work unless specifically indicated or specified otherwise.
2.02 FURNISHED MATERIALS AND EQUIPMENT
A.
All furnished materials and equipment are indicated or scheduled on the
Contract Documents.
B.
Products listed in the following sections shall be Owner Furnished Contractor
Installed (OFCI):
(1) 11 06 40 Theatrical Lighting Control
(2) 11 06 50 Theatrical Lighting Fixtures
(3) AV Speakers and controls listed on the AV drawings
C. Products listed in the following sections shall be Owner Furnished Owner
Installed (OFOI):
(1) 11 06 10 Theatrical Rigging Systems and Controls
(2) 11 06 60 Stage Lift
(3) 14 42 16 Inclined Platform Wheelchair Lift
D. Products listed in the following sections shall be Owner Furnished Rigging
Contractor Installed (OFRCI):
STOCKTON UNIFIED SCHOOL DISTRICT
OWNER-FURNISHED PRODUCTS
DOCUMENT 01 64 00-3
(1) 11 06 20 Theatrical Drapery and Track
a. Owner to provide drapery
b. Rigging Contractor to provide remainder for complete drapery
installation.
PART 3 – EXECUTION
3.01 INSTALLATION
A.
Install equipment items in accordance with the manufacturer’s instructions.
B.
Set equipment items securely in place, rigidly or flexibly mounted in
accordance with manufacturers’ directions.
C. Make electrical and mechanical connections as indicated and required.
D. Touch-up and restore damaged or defaced finishes to the Owner’s
satisfaction.
3.02 CLEANING AND PROTECTION
A.
Repair or replace items not acceptable to the Architect or Owner.
B.
Upon completion of installation, clean equipment items in accordance with
manufacturer’s recommendations, and protect from damage until final
acceptance of the Work by the Owner.
END OF DOCUMENT
STOCKTON UNIFIED SCHOOL DISTRICT
OWNER-FURNISHED PRODUCTS
DOCUMENT 01 64 00-4