| Location: | Missouri |
|---|---|
| Posted: | Dec 23, 2024 |
| Due: | Dec 8, 2024 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C25525AP0063 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Harry S. Truman Hospital requires preventive maintenance and programming of the Electric Power Distribution System which includes the control panels at the main switchgear, annual preventive maintenance, inspection and repair of the circuit breakers, the Programmable Logic Controllers (PLC), control panels, and emergency Uninterruptible Power Supply (UPS). All essential electrical system components are controlled at these panels. Proper maintenance and inspection is critical to patient safety.

With GovernmentContracts, you can:
...Plant; including overhead lighting, conduit & conductors, filter control panels, valve actuators... WTP ...
Drexel Technologies
Bid Due: 7/06/2026
...Plant; including overhead lighting, conduit & conductors, filter control panels, valve actuators... WTP ...
Drexel Technologies
Bid Due: 7/06/2026
...Plant; including overhead lighting, conduit & conductors, filter control panels, valve actuators... WTP ...
Drexel Technologies
Bid Due: 7/06/2026