| Location: | Washington |
|---|---|
| Posted: | Apr 1, 2025 |
| Due: | Apr 29, 2025 |
| Agency: | Northwest Public Power Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Are you sure you wish to continue?
The Public Utility District No. 1 of Lewis County (District) requires a contractor to provide labor, materials, and equipment to perform site preparation, grading, surfacing of the substation, oil containment installation, foundation installation, steel structure installation, ground grid installation, below-grade conduit installation, primary feeder conduit installation, lighting pole installation and grounding, installation of breakers, steel structures and other electrical equipment, fence and storm water detention fencing installation and grounding, roadway improvements and construction of both north and south drive entrances for the District’s N. Military Rd. Substation, located at 107 N. Military Rd, Winlock, Washington 98596.

With GovernmentContracts, you can:
...Equipment (See 055-61 for Automotive Type) 760-59-Recycled Earth Handling, Grading, Moving... Solicitation Information ...
State Government of Washington
Bid Due: 10/08/2026
...wells, vaults, and associated piping. N. Final grading and construction of new dam ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/30/2026
...improvements: This Contract provides for furnishing the necessary labor, materials, equipment, tools... for ...
City of Stanwood
Bid Due: 9/29/2026
...Facility Maintenance and Repair 929-17-Automotive Shop Equipment Maintenance and Repair 665-21-Bag... Sealing Equipment, ...
State Government of Washington
Bid Due: 11/20/2026