| Location: | Washington |
|---|---|
| Posted: | May 22, 2025 |
| Due: | May 25, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912DW25Q8004 |
| Publication URL: | To access bid details, please log in. |
THIS PROCUREMENT IS:
100% set-aside for Small Business
SITE VISIT: A one-time site visit is scheduled for May 27, 2025, at 10:00 a.m. (Pacific) Local Time. Offerors wishing to visit the site shall arrive no later than 9:30 a.m. (Pacific) to 30525 SE Mud Mountain Rd, Enumclaw, WA. Proper identification is required to enter the site. The Point of Contact is Rick Emry, Dam Equipment Mechanic Supervisor, who may be contacted Monday through Thursday between 8:00 a.m. and 4:30 p.m.
OFFERORS ARE URGED and expected to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable. In no event, will a failure to inspect the site constitute grounds for withdrawal of an offer after closing or for a claim after award of the contract.
FOR INQUIRIES AND ADMINISTRATIVE MATTERS: Contact the following individual Monday through Friday between the hours of 7:00 a.m. and 3:30 p.m. (Pacific):
Keith Rudie, (206) 475-4276, Keith.A.Rudie@usace.army.mil
Rick Emry, (206) 764-3717, rick.m.emry@usace.army.mil
REQUIREMENTS: The U.S. Army Corps of Engineers, Mud Mountain Dam has a requirement for 2 total crane picks on the upstream face. We are seeking a properly sized crane with operator to install/ remove metal stop logs. Access to the location has a steep grade and will take time to traverse in and out. Counterweights can be installed at the top of the dam; however, any additional counterweights will need to be brought down on a smaller truck as a tractor trailer cannot traverse the grade and switch backs. Photos are provided showing the stoplog lifting beam, access along the upstream side of the dam, and the location where the crane will operate. An additional photo shows a crane placing a stoplog.
Contractor to verify all weights and radiuses prior to mobilization. A full walk through of all the lifts will be required prior to mobilization to ensure appropriate equipment is mobilized.
Attendance at the site visit is highly recommended.
| May 27, 2025 | [Special Notice (Updated)] Site Visit - Mud Mountain Dam Crane Rental for Stop Log Placement and Removal |
| Jun 5, 2025 | [Combined Synopsis/Solicitation (Original)] W912DW25Q8004 Mud Mountain Dam Crane Rental for Stoplog Picks |
| Jun 6, 2025 | [Combined Synopsis/Solicitation (Updated)] W912DW25Q8004 Mud Mountain Dam Crane Rental for Stoplog Picks |
| Jun 16, 2025 | [Combined Synopsis/Solicitation (Updated)] W912DW25Q8004 Mud Mountain Dam Crane Rental for Stoplog Picks |

With GovernmentContracts, you can: