PEARL STREET PUMP STATION AND FORCE MAIN PROJECT

Location: Maine
Posted: Apr 13, 2026
Due: May 13, 2026
Agency: City of South Portland
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 23-26
Publication URL: To access bid details, please log in.
Bid Number: 23-26
Bid Title: PEARL STREET PUMP STATION AND FORCE MAIN PROJECT
Category: All Bids
Status: Open
Description:

IMPORTANT NOTE: PER ADDENDUM # 1, BIDS MUST BE SUBMITTED BY WEDENSDAY, MAY 13, 2026 AT 2:00 PM LOCAL TIME. AT THAT TIME THE BIDS RECEIVED WILL BE PUBLICLY OPENED AND READ. ADDENDUM WAS POSTED ON APRIL 13, 2026.

Sealed Bids for the construction of the Project will be received at the Water Resource Protection Department located at 111 Waterman Drive, South Portland, Maine 04106, until Thursday, April 30, 2026, at 2:00 PM local time (SEE ABOVE).  At that time the Bids received will be publicly opened and read.

The City is in process of completing a feasibility study to determine the user rates necessary to support funding this project.  Note that award of this bid is contingent upon funding approval by the City Council in the form of authorization of revenue bonds, expected in June 2026.  This is to have the best cost information to better determine the amount to bond.  The City expects approval but cannot officially enter into a contract until that approval is given.

The Project includes the following Work:

Upgrades to the Pearl Street Pump Station facilities and associated infrastructure, including but not limited to the following:

  • The Work at the Headworks Building (1 Pearl Street) includes but is not limited to demolition of the existing pump station superstructure, selective demolition within the existing structure, reuse and rehabilitation of the existing foundation, construction of a new Headworks Building superstructure, furnishing and installing mechanical screening equipment, furnishing and installing a manual bypass screen, furnishing and installing two aerated grit channels, modification of a garage area for grit and screenings handling and disposal, furnishing and installing new electrical equipment, and all materials, equipment, services, and construction inherent to the Work.

  • The Work at the Pump Station Building (6 Pearl Street) includes but is not limited to construction of a new Pump Station Building and foundation, furnishing and installing a vortex grit removal system, furnishing and installing three dry - pit submersible sewage pumps, furnishing and installing new electrical equipment, installing an emergency standby generator, furnishing and installing an odor control system, and all materials, equipment, services, and construction inherent to the Work.

  • The Work for Site Improvements includes but is not limited to site work, yard piping, furnishing and installing gravity sewers between the Headworks Building and Pump Station Building, furnishing and installing electrical duct banks, landscaping, paving, site lighting, site restoration and all associated infrastructure located outside of the buildings.

  • The Work for the Force Main includes but is not limited to furnishing and installing approximately 3,000 linear feet of new dual 20” diameter force mains from the Pump Station Building, across Fore River, and to the wastewater treatment facility at Waterman Drive, including all materials, equipment, services, and construction inherent to the Work.

Owner anticipates that the Project’s total bid price will be approximately $ 32,000,000. The Project has an expected duration of 920 days.

Obtaining the Bidding Documents

The Issuing Office for the Bidding Documents is:

City of South Portland

Purchasing Office

25 Cottage Road

South Portland, Maine 04106

Information and Bidding Documents for the Project can be found at the following designated website:

https://southportland.gov/Bids.aspx?CatID=18

Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

Pre-bid Conference

A pre-bid conference for the Project will be held on Thursday, April 2, 2026 at 10:00 AM at Water Resource Protection Department, 111 Waterman Drive, South Portland, Maine 04106. Attendance at the pre-bid conference is mandatory .

Instructions to Bidders

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, not to be responsive or responsible or not to meet the specified qualification or quality requirements, based on poor references or otherwise.


Owner may also reject the Bid of any Bidder if Owner reasonably believes that it would not be in the best interest of the Project or the public to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work.  Award is subject to subject to available funding.


This Invitation is issued by Engineer on behalf of the Owner : City of South Portland, Maine

Publication Date/Time:
3/19/2026 11:00 AM
Publication Information:
Portland Press Herald
Closing Date/Time:
5/13/2026 2:00 PM
Submittal Information:
mfitzgerald@southportland.gov
Bid Opening Information:
Public Opening
Addendum Date/Time:
04/13/2026
Pre-bid Meeting:
04/02/2026
Download Available:
yes
Fee:
No Fee
Business Hours:
8:00 to 5:00 M - Th
Related Documents:
View Document(s)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.