TX FLAP FM 709(1) – Access to Navarro Mills Lake

Location: Texas
Posted: Oct 10, 2024
Due: Oct 30, 2024
Agency: TRANSPORTATION, DEPARTMENT OF
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 6982AF23B000037
Publication URL: To access bid details, please log in.
Follow
TX FLAP FM 709(1) – Access to Navarro Mills Lake
Active
Contract Opportunity
Notice ID
6982AF23B000037
Related Notice
6982AF23B000037
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Oct 10, 2024 11:18 am MDT
  • Original Published Date: Sep 26, 2024 12:50 pm MDT
  • Updated Date Offers Due: Oct 30, 2024 02:00 pm MDT
  • Original Date Offers Due: Oct 30, 2024 02:00 pm MDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Nov 30, 2024
  • Original Inactive Date: Nov 30, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Dawson , TX
    USA
Description

PROJECT NUMBER: TX FLAP FM 709(1)



PROJECT NAME: Navarro Mills Lake Road



PROJECT DESCRIPTION:



The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709. The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road. The improvements begin approximately at intersection SH 31 in the City of Dawson and ends at the Liberty Hill Park junction.



The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP). In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety.



PRINCIPAL WORK ITEMS:




  • 7,820 Embankment Construction

  • 29,000 tons of Aggregate base

  • 49,750 square yards of Recycled aggregate base, 9-inch depth (with cement)

  • 7000 Tons of Asphalt Concrete Pavement

  • 4000 hours of temporary traffic control, flagger

  • 60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel.

  • 20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert

  • 390 linear feet, 30-inch pipe culvert (concrete)

  • 660 linear feet, 24-inch pipe culvert (concrete)

  • 210 linear feet, 54-inch pipe culvert (concrete)



ANTICIPATED SCHEDULE:



Advertise: September 2024



Award: Fall 2024



Construction: November 2024 –August 2025



ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.


Attachments/Links
Contact Information
Contracting Office Address
  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Sep 26, 2024[Solicitation (Updated)] TX FLAP FM 709(1) – Access to Navarro Mills Lake
Oct 8, 2024[Solicitation (Updated)] TX FLAP FM 709(1) – Access to Navarro Mills Lake
Oct 11, 2024[Solicitation (Updated)] TX FLAP FM 709(1) – Access to Navarro Mills Lake
Oct 26, 2024[Solicitation (Updated)] TX FLAP FM 709(1) – Access to Navarro Mills Lake
Oct 30, 2024[Solicitation (Updated)] TX FLAP FM 709(1) – Access to Navarro Mills Lake
Nov 18, 2024[Solicitation (Updated)] TX FLAP FM 709(1) – Access to Navarro Mills Lake
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...DRYWALL, REINFORCING BAR, CEMENT, METAL FRAMING COMPONENTS, LAMINATE, ACRYLIC SHEETING, DOORS, AND... categories: ...

Alief Independent School District

Bid Due: 4/30/2028

...- Sound Absorbing Units 09P - CC - Carpet 09S - CC - ...

Houston First

Bid Due: 7/14/2026

...ASSISTING TXDOT MAINTENANCE FORCES WITH MILLING OPERATION OF ASPHALTIC CONCRETE AND CEMENT PAVEMENT...

State Government of Texas

Bid Due: 8/12/2031

...BAR, CEMENT, METAL FRAMING COMPONENTS, LAMINATE, ACRYLIC SHEETING, DOORS, AND ROOFING MATERIAL...

Alief Independent School District

Bid Due: 4/30/2028

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.